Tabular view of infrastructure pipeline projects

Pipeline projects and filtering tools

The filters below offer a range of options for sorting pipeline projects, including region, sector and project status.

Click on the name of a project to read more about it. Please read important caveats about this data.

Data is available for download in open data format CSV and in an alternate timeline view of projects.

This data is a snapshot in time and was last updated on 1 May 2019.  The data will be updated at least quarterly.  The next update is planned for early June 2019, to incorporate any changes resulting from Budget 2019.

Show additional columns
Project Region Sector Procuring agency Cost range Status Business case (est) Procurement (est) Construction (est) Phases undetermined (est)
Facilities Infrastructure Remediation Programme - Stage 1 Auckland Health Ministry of Health 250 - 500 Million Under Construction 2017-Q2 to 2022-Q2
Building for the Future - Integrated Stroke Unit Auckland Health Ministry of Health 25 - 50 Million Business Case / Investment Case Development 2018-Q3 to 2019-Q1 2019-Q1 to 2019-Q2 2019-Q2 to 2020-Q2
Mental Health Services Relocation Canterbury Health Ministry of Health 50 - 100 Million In Procurement 2017-Q3 to 2018-Q4 2019-Q4 to 2020-Q3 2020-Q3 to 2022-Q4
Individualised Service Units for High Risk Mental Health and Intellectual Disability Clients Wellington Health Ministry of Health 5 - 25 Million In Procurement 2016-Q3 to 2020-Q1
Manukau Infrastructure for New Capacity Auckland Health Ministry of Health 25 - 50 Million Business Case / Investment Case Development 2018-Q4 to 2019-Q2 2019-Q3 to 2019-Q4 2019-Q3 to 2020-Q2
Manukau Radiology Hub - Stage 1 Auckland Health Ministry of Health 25 - 50 Million Business Case / Investment Case Development 2018-Q4 to 2021-Q2
Reclad Programme - Stage 1 Auckland Health Ministry of Health 5 - 25 Million Business Case / Investment Case Development 2019-Q2 to 2020-Q2
Radiology Relocation to Harley Gray Auckland Health Ministry of Health 25 - 50 Million Business Case / Investment Case Development 2018-Q3 to 2021-Q2
Critical Works - Stage 1 (Capacity) Northland Health Ministry of Health 5 - 25 Million In Procurement 2017-Q2 to 2018-Q2 2018-Q3 to 2019-Q4 2019-Q1 to 2021-Q2
Bay of Islands Hospital - Stage 2 (Primary Care) Northland Health Ministry of Health 5 - 25 Million In Procurement 2017-Q1 to 2017-Q4 2018-Q3 to 2019-Q4 2019-Q3 to 2020-Q4
Dunedin Hospital Site Clearance Otago Health Ministry of Health Not Disclosed Under Construction 2020-Q1 to 2022-Q1
New Dunedin Hospital - ASC Stage 1 & 2 Otago Health Ministry of Health 250 - 500 Million Business Case / Investment Case Development 2017-Q3 to 2024-Q4
New Dunedin Hospital Campus Otago Health Ministry of Health 500 Million + Business Case / Investment Case Development 2017-Q3 to 2028-Q4
Elective Capacity and Inpatient Beds and Supporting Infrastructure Auckland Health Ministry of Health 100 - 250 Million In Procurement 2016-Q3 to 2019-Q1 2019-Q2 to 2020-Q3 2020-Q2 to 2023-Q1
Taxiway Alpha Extension Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2023-Q2
Air Movements Unit Hangar and Equipment Storage Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Arch Hangar Mid-life Light Refit Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Arch Hangar Mid-life Intensive Refit Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2023-Q2
Runway End Safety Area (03-21) Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2023-Q2
Future Air Mobility Fixed Wing Simulator Utilities Enablement Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2019-Q3 to 2023-Q2
Explosive Processing Facility Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Future Air Mobility Fixed Wing Simulator Facility Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2023-Q2
Linked Capability Base Infrastructure Support Requirements Auckland Defence New Zealand Defence Force 50 - 100 Million Business Case / Investment Case Development 2019-Q3 to 2024-Q2
Linked Capability of Airfield Infrastructure Auckland Defence New Zealand Defence Force 50 - 100 Million Business Case / Investment Case Development 2021-Q3 to 2024-Q2
Linked Capability Introduction to Service - Wharf Strengthening Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Existing Wharf Strengthening - Future Maritime Fleet Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2020-Q2
Wharf Loading Area and Support Facility - Future Maritime Fleet Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2023-Q3 to 2028-Q2
Small Boats Storage and Wash Down Area Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2023-Q3 to 2026-Q2
Small Boats Maintenance Workshop Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2022-Q3 to 2026-Q2
Small Boats Fuel Services Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2023-Q3 to 2026-Q2
Waterside Operations and Offices Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2021-Q3 to 2027-Q2
Transitionary Multi-Purpose Office Accommodation Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2023-Q3 to 2027-Q2
Base Headquarters Building Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2023-Q3 to 2028-Q2
Linked Capability Wharf Extension Auckland Defence New Zealand Defence Force 25 - 50 Million Business Case / Investment Case Development 2019-Q3 to 2026-Q2
Ocean Patrol Vessel Wharf Transformer Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2022-Q3 to 2026-Q2
Combined Explosive Hazards Security and Noise Buffer Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2019-Q3 to 2023-Q2
Special Operations Vehicle Introduction to Service - Priority Roads and Entrance Auckland Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2019-Q3 to 2021-Q2
Secure Compound Extension Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Operations Vehicle Introduction to Service - Maintenance Bays Including Aprons Auckland Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2023-Q3 to 2028-Q2
North East Quadrant Flight Line Support Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Fixed Wing Training and Simulation Facility Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2021-Q2
Fixed Wing Warehouse and Parts Storage Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2021-Q2
Fuel Storage Facility Expansion Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Air Surveillance Complimentary Capability Operations Centre Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Air Surveillance Complimentary Capability Hangar and Apron Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2024-Q2
Investment in Ohakea Housing Manawatu - Wanganui Defence New Zealand Defence Force 50 - 100 Million Business Case / Investment Case Development 2018-Q3 to 2024-Q2
Double Hangar and Offices Manawatu - Wanganui Defence New Zealand Defence Force 100 - 250 Million Business Case / Investment Case Development 2018-Q3 to 2024-Q2
Operational Unit Precinct Utilities including High Voltage Manawatu - Wanganui Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Protected Mobility Vehicle Introduction to Service - Priority Roads and Heavy Goods Entrance Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2019-Q3 to 2023-Q2
Protected Mobility Vehicle Introduction to Service - Priority Hardstanding Manawatu - Wanganui Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2019-Q3 to 2023-Q2
Operational Fuels Infrastructure - Logistics Precinct Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Medical Centre and Hospital Relocation Manawatu - Wanganui Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2021-Q3 to 2024-Q2
Stormwater Network - Logistics Precinct Manawatu - Wanganui Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Waterway - Common Logistic Precinct Manawatu - Wanganui Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Consolidated Parking - Common Logistics Precinct Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2022-Q3 to 2026-Q2
Heavy Vehicle Entrance Gate Manawatu - Wanganui Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2023-Q3 to 2027-Q2
Camp Security and Entrance Enhancements Wellington Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Medical Centre Burnham Canterbury Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Electrical Network Priority Canterbury Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2022-Q3 to 2024-Q2
Camp Armoury Canterbury Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2021-Q3 to 2025-Q2
Training Hub - Linked Capability Canterbury Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2022-Q3 to 2026-Q2
Facilities Maintenance Compound - Linked Capability Canterbury Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2023-Q3 to 2026-Q2
Transport Headquarters Canterbury Defence New Zealand Defence Force 5 - 25 Million Business Case / Investment Case Development 2022-Q3 to 2026-Q2
Fuel Point - Logistics Canterbury Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2023-Q3 to 2027-Q2
Network Enabled Army Supporting Infrastructure - Stage 3 Nationwide Defence New Zealand Defence Force < 5 Million Business Case / Investment Case Development 2020-Q3 to 2024-Q2
Investment in Horizontal Infrastructure Nationwide Defence New Zealand Defence Force 100 - 250 Million Business Case / Investment Case Development 2018-Q3 to 2035-Q2
Beachlands School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q3
Birkenhead School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q3 to 2021-Q2
Campbells Bay School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q4 to 2021-Q1
Clendon Park School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2021-Q1
Dominion Road School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2021-Q1
Edgecumbe College Bay of Plenty Education Ministry of Education 5 - 25 Million In Procurement 2019-Q4 to 2022-Q2
Flaxmere College Hawkes Bay Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q1
Gisborne Girls' High School Gisborne Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2020-Q2
Glenfield Intermediate Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2020-Q1
Greenmeadows School Hawkes Bay Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q3
Kaikorai School Otago Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q1
Kamo High School Northland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q2
Karamea Area School West Coast Education Ministry of Education < 5 Million In Procurement 2019-Q4 to 2021-Q1
Kowhai Intermediate Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2021-Q4
Laingholm School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q2
Lawrence Area School Otago Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2021-Q1
Long Bay College Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q2
Macleans College Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q2 to 2021-Q1
Maniototo Area School Otago Education Ministry of Education 5 - 25 Million In Procurement 2019-Q2 to 2021-Q1
Manurewa Central School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q3
Maraetai Beach School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q3 to 2021-Q1
Meadowbank School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2021-Q1
Mt Aspiring School Otago Education Ministry of Education 5 - 25 Million In Procurement 2019-Q2 to 2021-Q4
Napier Boys' High School Hawkes Bay Education Ministry of Education 5 - 25 Million In Procurement 2019-Q1 to 2021-Q3
Ngaruawahia High School Waikato Education Ministry of Education 5 - 25 Million In Procurement 2019-Q1 to 2021-Q1
Omokoroa Point School Bay of Plenty Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q1
Onehunga High School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q4
Opihi School Canterbury Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q3
Oranga School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2020-Q3
Oteha Valley School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q2
Owairaka District School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q4 to 2021-Q2
Owairoa Primary School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q2
Pokeno School Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q2 to 2021-Q1
Port Ahuriri School Hawkes Bay Education Ministry of Education < 5 Million In Procurement 2019-Q3 to 2021-Q1
Prebbleton School Canterbury Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q2
Rangitoto College Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q3 to 2021-Q1
Richmond Road Shchool Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q1
Ridgway School Wellington Education Ministry of Education 5 - 25 Million In Procurement 2019-Q4 to 2021-Q2
Rowandale School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2021-Q1
Taihape Area School Taranaki Education Ministry of Education 5 - 25 Million In Procurement 2019-Q1 to 2021-Q3
Te Puke Primary School Bay of Plenty Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q1
Te Wharekura O Manurewa Auckland Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q2
TKKM O Te kotuku Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2020-Q2
Tolaga Bay Area School Gisborne Education Ministry of Education 5 - 25 Million In Procurement 2019-Q2 to 2021-Q1
Torbay School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q3 to 2021-Q2
Tauranga Girls' School Bay of Plenty Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2020-Q3
Waimea College Marlborough Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q2
Wainui School Auckland Education Ministry of Education < 5 Million In Procurement 2019-Q2 to 2020-Q1
Wainuiomata High School Wellington Education Ministry of Education 5 - 25 Million In Procurement 2019-Q3 to 2021-Q2
Wairarapa College Wellington Education Ministry of Education 5 - 25 Million In Procurement 2019-Q1 to 2020-Q3
Wellington East Girls' College Wellington Education Ministry of Education 5 - 25 Million In Procurement 2019-Q1 to 2020-Q3
Westland High School West Coast Education Ministry of Education < 5 Million In Procurement 2019-Q1 to 2020-Q3
SH5: Wairakei to Mihi to SH38 - Stage 2 Waikato Transport New Zealand Transport Agency 5 - 25 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q2 2019-Q3 to 2020-Q4
Visiting Driver Signature Project Otago Otago Transport New Zealand Transport Agency < 5 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q2 2019-Q2 to 2019-Q3
SH3: Awakino to Mt Messenger Corridor - Stage 3 Taranaki Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q2 2019-Q3 to 2020-Q1
Te Ahu a Turanga Manawatu Tararua Highway Manawatu - Wanganui Transport New Zealand Transport Agency 250 - 500 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q2 2020-Q1 to 2025-Q3
Hamilton to Cambridge Cycle Connection Waikato Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q2 2019-Q2 to 2020-Q2
SH50: Hawke's Bay Expressway Hawkes Bay Transport New Zealand Transport Agency 5 - 25 Million Under Construction 2018-Q2 to 2019-Q3
SH1: Dome Valley Safety Improvements Auckland Transport New Zealand Transport Agency 25 - 50 Million Under Construction 2018-Q2 to 2020-Q4
SH2: Waihi to Omokoroa (Trig Road to Omokoroa) Bay of Plenty Transport New Zealand Transport Agency 50 - 100 Million Under Construction 2018-Q2 to 2020-Q4
SH2: Waihi to Omokoroa (Waihi to Trig Road) Bay of Plenty Transport New Zealand Transport Agency 5 - 25 Million Under Construction 2018-Q2 to 2020-Q4
SH5: Wairakei to Mihi to SH38 - Stage 1 Waikato Transport New Zealand Transport Agency 5 - 25 Million Under Construction 2018-Q2 to 2019-Q1 2019-Q1 to 2019-Q1 2019-Q2 to 2020-Q2
SH35 Makoomuka Realignment Gisborne Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q3 to 2019-Q4 2019-Q4 to 2025-Q3
HPMV T2 West Coast connections (Contract 2) West Coast Transport New Zealand Transport Agency < 5 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q1 to 2019-Q1 2019-Q2 to 2019-Q3
SH3 Awakino Tunnel Bypass Waikato Transport New Zealand Transport Agency 25 - 50 Million Under Construction 2018-Q2 to 2018-Q4 2019-Q1 to 2019-Q1 2019-Q2 to 2025-Q3
Old Mangere Bridge replacement - Manukau Harbour Auckland Transport New Zealand Transport Agency 25 - 50 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q1 to 2019-Q2 2019-Q2 to 2025-Q3
SH30 Eastern Corridor Connect Rotorua (Phase 2) Bay of Plenty Transport New Zealand Transport Agency 5 - 25 Million In Procurement 2018-Q2 to 2018-Q4 2019-Q1 to 2019-Q1 2019-Q2 to 2020-Q3
Katiki Coast Enhanced Resilience Stage 2 Otago Transport New Zealand Transport Agency < 5 Million In Procurement 2018-Q2 to 2018-Q4 2019-Q1 to 2019-Q2 2019-Q2 to 2020-Q3
W2HV Link Programme: N2P section Wellington Transport New Zealand Transport Agency 50 - 100 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2020-Q4 to 2021-Q1 2021-Q2 to 2023-Q1
SH1 Papakura to Bombay Auckland Transport New Zealand Transport Agency 250 - 500 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q1 to 2019-Q1 2020-Q1 to 2025-Q3
SH88 Cycling and Pedestrian Facilities including Port Chalmers Safety Improvements Otago Transport New Zealand Transport Agency 25 - 50 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q1 to 2019-Q2 2019-Q3 to 2023-Q1
SH10 Waipapa Corridor Improvements Northland Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q3 2019-Q4 to 2020-Q2
SH26 Kirikiri Stream Bridge Replacement Waikato Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q4 2019-Q4 to 2023-Q1
SH16: Brigham Creek to Waimauku Auckland Transport New Zealand Transport Agency 25 - 50 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q3 2019-Q3 to 2021-Q1
Waimak Bluffs Rock protection Canterbury Transport New Zealand Transport Agency < 5 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q3 2019-Q3 to 2020-Q1
SH10 Kaeo Bridge Upgrade Northland Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2020-Q4
HPMV T2 GIS HNO Napier Port to Gis Gisborne Transport New Zealand Transport Agency < 5 Million Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2019-Q4 to 2019-Q4 2019-Q4 to 2020-Q4
Waikare Gorge Hawkes Bay Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2019-Q2 to 2019-Q4 2020-Q1 to 2021-Q1
SH11 Kawakawa to SH10 Northland Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2020-Q2 to 2020-Q3 2020-Q4 to 2025-Q3
SH12 Rawene to Waipoua Northland Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2020-Q2 to 2020-Q3 2020-Q4 to 2025-Q3
SH35 and connecting routes - resilience Gisborne Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q3 2019-Q4 to 2020-Q1 2020-Q1 to 2023-Q1
SH35 and connecting routes - passing opportunities Gisborne Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q3 2019-Q4 to 2020-Q1 2020-Q1 to 2023-Q1
SH43 Forgotten Highway Taranaki Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2019-Q4 to 2019-Q4 2020-Q1 to 2023-Q1
Passing and overtaking opportunities Northland Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2019-Q4 to 2019-Q4 2020-Q1 to 2023-Q1
W2HV Link Programme: P2M section Wellington Transport New Zealand Transport Agency 25 - 50 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q1 to 2019-Q1 2019-Q2 to 2020-Q3
20Connect (SH20B) Auckland Transport New Zealand Transport Agency 50 - 100 Million Business Case / Investment Case Development 2019-Q1 to 2023-Q1
SH18 Squadron Drive Imps - Enabling Works Auckland Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2019-Q1 to 2019-Q2 2019-Q3 to 2019-Q4 2019-Q4 to 2020-Q2
Accessing Central New Zealand SH3 Napier Manawatu - Wanganui Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2019-Q1 2019-Q4 to 2019-Q4 2020-Q1 to 2020-Q4
SH60 Takaka Hill Nelson Transport New Zealand Transport Agency 5 - 25 Million In Procurement 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q3 2019-Q3 to 2020-Q2
SH7 Ahaura River Bridge Replacement Canterbury Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q4 2019-Q4 to 2023-Q1
SH30A Urban Revitalisation Connect Rotorua Bay of Plenty Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q2 to 2019-Q4 2019-Q4 to 2023-Q1
SH8 Beaumont Bridge replacement Otago Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q3 to 2020-Q1 2020-Q1 to 2023-Q1
SH30 Kopaki Bridge Replacement Waikato Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2019-Q4 to 2020-Q1 2020-Q1 to 2023-Q1
SH6A Corridor Improvements Otago Transport New Zealand Transport Agency 5 - 25 Million Business Case / Investment Case Development 2018-Q2 to 2019-Q1 2020-Q4 to 2021-Q1 2021-Q1 to 2023-Q1
Grant Rd Kawarau Falls Bridge Corridor Improvements (Stage 2) Otago Transport New Zealand Transport Agency 25 - 50 Million Business Case / Investment Case Development 2019-Q2 to 2025-Q3
SH1 Taupo to Waiouru ST Improvements Waikato Transport New Zealand Transport Agency Not Disclosed Business Case / Investment Case Development 2019-Q1 to 2025-Q3
Waikeria Prison Development Waikato Justice Department of Corrections 500 Million + Under Construction 2017-Q1 to 2022-Q2
Modular Build Programme Canterbury Justice Department of Corrections 250 - 500 Million Under Construction 2018-Q2 to 2019-Q4
Mount Eden Correctional Facility Auckland Justice Department of Corrections 50 - 100 Million Under Construction 2017-Q2 to 2019-Q3
Modular Build Programme Canterbury - Whanganui Justice Department of Corrections 50 - 100 Million Under Construction 2017-Q4 to 2019-Q3
Rolleston Enhancements Canterbury Justice Department of Corrections 5 - 25 Million Under Construction 2018-Q3 to 2019-Q3
Arohata New Build Wellington Justice Department of Corrections 5 - 25 Million Under Construction 2016-Q4 to 2019-Q3
Manawatu Prison - Single Point Entry Manawatu - Whanganui Justice Department of Corrections 5 - 25 Million In Procurement 2018-Q3 to 2020-Q4
Mount Eden Correctional Facility Auckland Justice Department of Corrections 5 - 25 Million Under Construction 2018-Q3 to 2019-Q3
Christchurch Men's Prison Canterbury Justice Department of Corrections < 5 Million Under Construction 2018-Q3 to 2019-Q2
Tactical Training Facility -Upper Hutt Wellington Justice Department of Corrections < 5 Million Under Construction 2017-Q3 to 2019-Q2
National Office -Wellington Wellington Justice Department of Corrections 25 - 50 Million In Procurement 2019-Q1 to 2021-Q2
Whanganui Prsion Manawatu - Whanganui Justice Department of Corrections 5 - 25 Million Under Construction 2018-Q4 to 2020-Q1