Introduction

Purpose of the Supplementary Estimates of Appropriations and Supporting Information

The Supplementary Estimates of Appropriations and Supporting Information (the Supplementary Estimates)provides members of Parliament with details of the terms of changes to existing appropriations and of new appropriations proposed since the Estimates for 2010/11 were finalised. The SupplementaryEstimates also shows proposed changes to departmental net asset balances.

While many of the appropriation and net asset balance changes will have already been given effect through the advance authority of Imprest Supply, they must still be specified in an Appropriation Act for the current financial year.

The Supplementary Estimates is presented to the House of Representatives at the same time as the Government introduces a second or subsequent Appropriations Bill for the current financial year.

Purpose and Nature of Appropriations

An appropriation is a statutory authority from Parliament allowing the Crown or an Office of Parliament to incur expenses or capital expenditure.

Neither the Crown nor an Office of Parliament can legally incur any expense or capital expenditure - as those terms are defined in the Public Finance Act 1989 (PFA) - unless it is expressly authorised by or under an Act of Parliament.

Limits Created by Appropriations

Each appropriation is allocated to, and managed as, one of six types of appropriation.

Each appropriation also has a defined scope that limits the uses or activities for which the expenses or capital expenditure can be incurred. The scope should be sufficient on its own to establish the nature and extent of the authority to incur expenses or capital expenditure. The wording of the appropriation scope should achieve the balance between being sufficiently precise to act as an effective constraint against non-authorised activities and not so specific that it inadvertently limits activity intended to be authorised.

In most cases an appropriation also limits the amount of expenses or capital expenditure that can be incurred, and the time period within which those expenses or capital expenditure can be incurred.

Aside from the very limited exclusions provided for in the PFA, the amount of expense or capital expenditure authorised by an appropriation is measured in accordance with generally accepted accounting practice.

Responsibility for Appropriations

Each appropriation is the responsibility of a designated Minister, who controls the right to use that appropriation within the limits authorised by Parliament. A department is also assigned to administer that appropriation in accordance with the Minister's wishes concerning its use.

A Vote is a group of appropriations (and can be a single appropriation) administered by a single department. Different appropriations within a Vote may be the responsibility of different Ministers.

Types of Appropriation

The PFA provides for six types of appropriation. Four appropriation types authorise the incurring of expenses; one type authorises the incurring of capital expenditure; the remaining type authorises both.

These appropriation types can be further differentiated by whether the expenses or capital expenditure are departmental or non-departmental transactions.

Types of Appropriation
Appropriation Type Transaction Status Description
Output Expenses Departmental Authorises expenses to be incurred by a department or an Office of Parliament in supplying a specified category of outputs (goods and services).
Non-Departmental Authorises expenses to be incurred by the Crown (excluding departments) in purchasing a specified category of outputs (goods and services) from Crown entities or other third parties.
Benefits and Other Unrequited Expenses Non-Departmental

Authorises expenses to be incurred by the Crown (excluding departments) in transferring resources (generally to individuals for their personal benefit) for which the Crown receives nothing directly in return.

Examples include the Unemployment Benefit, student allowances and various scholarships and awards.

Borrowing Expenses Departmental

Authorises the incurring of interest or other financing expenses for loans made to a department or an Office of Parliament, or public securities (undertakings that represent part of the public debt) issued by a department or an Office of Parliament.

In practice, limitations on the rights of departments to borrow or issue securities mean that these are likely to be incurred only by Offices of Parliament.

Non-Departmental

Authorises the incurring of interest or other financing expenses for loans made to the Crown (excluding departments), or public securities (undertakings that represent part of the public debt) issued by the Crown.

Crown debt management is centralised, which means that most debt-servicing expenses appear in Vote Finance.

Other Expenses Departmental

Authorises expenses to be incurred by a department or an Office of Parliament that are not either output expenses or borrowing expenses.

Other expenses should be used only for events that cannot be related back to output production, such as redundancy costs arising from a government decision to cease purchasing certain types of outputs, or a loss on sale of assets made surplus by departmental restructuring.

  Non-Departmental

Authorises expenses to be incurred by the Crown (excluding departments) that are not structured or managed as output expenses, benefits and other unrequited expenses, or borrowing expenses.

Other expenses is the residual appropriation type, which should not be used where an appropriation could be better classified or managed as one of the other appropriation types (eg, as output expenses).

Examples include disposal of an asset for less than market value, grants to community organisations, subscriptions for membership of international bodies and remuneration of independent statutory officers.

Capital expenditure Departmental Authorises capital expenditure to be incurred by a department or an Office of Parliament to acquire or develop assets for the use of the department.
Non-Departmental Authorises capital expenditure to be incurred by the Crown (excluding departments) to acquire or develop Crown assets, including the purchase of equity, or making a loan to a person or organisation that is not a department.
Expenses or Capital Expenditure Incurred by an Intelligence and Security Department Departmental Authorises both expenses and capital expenditure to be incurred by the New Zealand Security Intelligence Service or the Government Communications Security Bureau.

 

Types of Output Expense Appropriations

A number of variations are possible for output expense appropriations. In particular, the constraint on the amount of expense that can be incurred is not always a fixed sum; and an output expense appropriation can cover more than one class of outputs.

Types of Output Expense Appropriations
Output Expense Appropriation Type and Authority Description, Constraints on Form and Typical Application

Standard Output Expense Appropriation

(section 7(1)(a), Public Finance Act 1989)

Departmental or non-departmental:  Authorises a department or an Office of Parliament to incur expenses in supplying a specified class of outputs (goods and services), or the Crown (excluding departments) to incur expenses to purchase a specified class of outputs.

Annual or multi-year:  The authority lapses at the end of the financial year or multi-year period specified.

Single output class only:  The scope is limited to a single class of outputs (defined as a grouping of similar outputs).

Amount limited by Appropriation Act: The amount of a standard output expense appropriation is limited to a set amount of New Zealand dollars specified in an Appropriation Act.

Typical application:  The normal or default form for an output expense appropriation, used for a wide range of outputs for which the flexibility offered by the other types of output expense appropriation is not required.

Multi-Class Output Expense Appropriation (MCOA)

(section 7(3)(b), Public Finance Act 1989)

Departmental or non-departmental:  Authorises a department or an Office of Parliament to incur expenses in supplying more than one specified class of outputs (goods and services), or the Crown (excluding departments) to incur expenses to purchase more than one specified class of outputs.

A proposed MCOA must be approved by the Minister of Finance before it is presented in the Estimates.  The information supporting the Estimates must explain why the Minister has allowed those classes of outputs to be grouped in one appropriation.

Annual or multi-year:  The authority lapses at the end of the financial year or multi-year period specified.

Multiple output classes:  The scope of an MCOA is determined by the combined scope of each of the output classes included in that appropriation.

Amount limited by Appropriation Act:  The amount of an MCOA is limited to a set amount of New Zealand dollars specified in an Appropriation Act.  The amount of expense that can be incurred in relation to each component output class is flexible within the total amount of the MCOA, although expenses must be separately forecast and reported for each individual class in the Estimates, Information Supporting the Estimates and the department's annual report.

Typical application:  An MCOA is used where it is appropriate to give the responsible Minister or department ongoing discretion over the output mix across two or more classes of outputs.  Such discretion will most commonly be sought where the output classes contribute to a common outcome, or use a common or closely related set of inputs or processes, and the circumstances that determine the appropriate output choice or mix are likely to vary during the appropriation period.

Revenue-Dependent Appropriations (RDA)

(section 21(1), Public Finance Act 1989)

Departmental only:  Authorises a department or an Office of Parliament to incur expenses in supplying a specified class of outputs (goods and services) that are not paid for directly by the Crown.

A proposed RDA must be approved by the Minister of Finance, before it is presented in the Estimates.  Each class of outputs for which an RDA is approved is listed in an Appropriation Act for the relevant financial year.

Annual only:  The authority lapses at the end of the financial year specified.

Single output class only:  The scope of an RDA is limited to a single class of outputs (defined as a grouping of similar outputs).

Amount limited by amount of revenue earned:  The amount of an RDA is limited tothe amount of revenue earned by a department or an Office of Parliament from other departments or from parties other than the Crown during a financial year.  The Minister of Finance can further direct a department to incur expenses to a level lower than the amount of revenue earned, though such directions are rare.

Typical application:  An RDA provides flexibility to respond to unanticipated changes in the level of external demand for a class of outputs, where the full cost of the outputs is met by external parties and not the Crown.

Department-to-Department Appropriations (DDA)

(section 20(2), Public Finance Act 1989)

Departmental only:  Authorises a department or an Office of Parliament to incur expenses in supplying specified outputs (goods and services) paid for by another department.

Creation of a DDA requires an agreement between two departments.  Implicitly, it also requires the approval of the Minister who will become responsible for the appropriation - namely, the Minister responsible for the supplying department - as the agreement has implications for the scope and risk of that department's operations.

Annual or multi-year:  The period of a DDA will depend on the negotiated terms of the agreement.

Single or multiple output class(es):  The scope of a DDA (and hence whether it covers one or more classes of outputs) will depend on the way in which it is to be delivered.  In most cases, an agreement that provides for a range of different outputs is better treated as creating several single-class DDAs.

Amount limited by departmental agreement:  The amount of a DDA is limited to either the amount of revenue earned from the commissioning department, or the cost incurred by the supplying department in providing those outputs (if that cost is less than the amount of revenue earned under the agreement).

Typical application:  DDAs are intended to reduce barriers to make collaboration between departments easier by reducing the time and effort otherwise required to obtain or  adjust the relevant appropriations, while also allowing a commissioning department to retain full control over the resources it provides.

The use of a DDA is not confined to bilateral agreements.  A set of related DDAs could be used to enable one department to co-ordinate and manage the work of several departments that must work together contribute to providing an integrated service to third parties, or to pool contributions from several departments to enable another department to provide a specific service to or on behalf of those departments.

 

Appropriation Period

The length of the appropriation period affects how appropriations are presented in the Estimates and Supplementary Estimates. Three different kinds of appropriation can be distinguished on the basis of period - annual and multi-year (as referred to in the above table on the types of output expense appropriations), and permanent:

  • Annual Appropriations - Most appropriations listed in the Estimates and Supplementary Estimates allow expenses or capital expenditure to be incurred only during a particular financial year. The annual amounts, for which parliamentary authority is normally sought, are shown in bold type in Details of Annual and Permanent Appropriations in the Estimates and Supplementary Estimates for each Vote. The amounts for RDAs and annual DDAs are forecasts only, and so are not shown in bold type.
  • Multi-Year Appropriations (MYAs) - The PFA also permits appropriations that allow expenses or capital expenditure to be incurred during a specified period that spans the whole or parts of more than one financial year, but no more than five financial years. The details of each MYA, including its commencement date and expiry date, are specified in Details of Multi-Year Appropriations in the Estimates and Supplementary Estimates for relevant Votes.
  • Permanent Appropriations (sometimes referred to as permanent legislative authorities or PLAs) -Permanent appropriations are authorised by legislation other than an Appropriation Act and continue in effect until revoked by Parliament. Generally the authorising legislation will impose limits on the scope of the appropriation and not its amount. For those appropriations with limits set in cash terms, section 11(2) of the PFA requires that they be reported on an accrual basis. The usual legislative wording allows for expenses or capital expenditure to be incurred for the purpose specified in the legislation “without further appropriation than this section”. Details of permanent appropriations are included in Details of Annual and Permanent Appropriations in the Estimates and Supplementary Estimates for each Vote for completeness, though the amount specified is a forecast rather than a limit. The amounts of permanent appropriations are therefore not shown in bold type. The scope of a permanent appropriation will reference the relevant section of the authorising legislation.

Types of Crown Revenue and Capital Receipts

An operating and capital split applies to Crown revenue and receipts. The following table outlines the three revenue/receipt types:

Types of Crown Revenue and Capital Receipts
Crown Revenue Type Transaction Type Description
Tax Revenue Non-Departmental Tax payable to the Crown, such as Income Tax, GST and Fringe Benefit Tax
Non-Tax Revenue Non-Departmental Revenue earned by the Crown from its investing and other operating activities.  Examples include interest income, capital charges and dividends from State-owned enterprises.
Capital Receipts Non-Departmental

Capital received by the Crown:

  • when loans are raised (which appear in Vote Finance) or repayments of principal are made on debts owed to the Crown (for example, in Vote Social Development), or
  • when capital assets are sold.

Types of Movements in Departmental Net Asset Balances

Information on types of movements in each department's net asset balance appears at the end of the Vote containing appropriations that belong to a department's Responsible Minister. The movements reconcile a department's estimated opening and projected closing net asset balances. The projected closing net asset balance sets an upper bound on the amount of the Crown's accumulated net investment in a department throughout the financial year.

Types of Movements in Departmental Net Asset Balances
Movement Type Description
Capital Injections Investment by the Crown in a department, which increases the department's closing net asset balance.
Capital Withdrawals Returns of capital by a department to the Crown, which reduce the department's closing net asset balance.
Surplus to be Retained / (Deficit Incurred) The net surplus forecast to be retained by a department from its operations for a financial year in accordance with section 22(1) of the PFA, or the forecast deficit for the department.  A surplus or deficit will, respectively, increase or decrease the department's closing net asset balance.
Other Movements Any other adjustment required to ensure that the amount of a department's authorised net asset balance is not a forecast but an upper bound within which the department must operate throughout the financial year.  Such movements may include offsets to forecast deficits (if any), to ensure that net assets remain within approved limits should the deficit be less than forecast.  Other movements may include offsets to forecast withdrawals, to ensure that net assets remain within approved limits until the capital is withdrawn.

Guide to Reading the Supplementary Estimates of Appropriations and Supporting Information

The Supplementary Estimates of Appropriation and Supporting Information contain this Introduction, a series of Summary Tables and, for each Vote, details of appropriations, schedules of departmental net asset balances, and supporting information.

Votes that do not require any changes to the Estimates for the current financial year are not included in this document. However, their appropriation details are included in the Summary Tables.

Summary Tables

The Summary Tables provide a high-level perspective and comparative “ready reference” for all appropriations (annual, permanent and multi-year). They cover:

  • aggregates for all Votes - showing totals for the Estimates and Supplementary Estimates for 2010/11 with respect to each type of appropriation and of Crown revenue and capital receipts
  • each appropriation type and total appropriations for each Vote - showing totals of the Estimates and Supplementary Estimates for 2010/11
  • current-year revenue-dependent appropriations
  • multi-year appropriations by Vote, appropriation type and period
  • Crown revenue and Crown capital receipts for 2010/11 associated with each Vote, and
  • net assets of each department - showing the closing balance for 2010/11.

For inclusion in the Summary Tables, MYAs are converted into actual or forecast amounts for each financial year.

Layout of Each Vote

Supplementary Estimates

The Supplementary Estimates presents Votes in alphabetic order. The title page for each Vote for which there are changes specifies the Minister(s) responsible for existing and proposed appropriations in the Vote, the administering department for the Vote, and the Responsible Minister for that department. This is followed by:

  • Details of Appropriations - Tables containing information on each appropriation referred to in the Appropriation (2010/11 Estimates) Act 2010 and Appropriation (2010/11 Supplementary Estimates) Bill, and on other current appropriations:
    • Details of Annual and Permanent Appropriations - The type, title, scope and amount of each annual and permanent appropriation. The annual amounts, for which parliamentary authorisation is sought in the Appropriation (2010/11 Supplementary Estimates) Bill, are shown in bold type.
    • Details of Multi-Year Appropriations (MYAs) - The type, title, scope and amount of each MYA, including any adjustments since originally appropriated, amounts incurred or estimated for particular years, and the estimated remaining balance.
  • Details of Projected Movements in Departmental Net Assets - Information on the opening and closing balances of, and movements in, the net assets of each department is included in the Vote that contains appropriations belonging to a department's Responsible Minister.

Supporting Information

The Supporting Information for each Vote follows immediately after the Supplementary Estimates for that Vote.

Information supporting changes in existing appropriations and new appropriations in each Vote is organised as follows:

  • Part 1 - Summary of the Vote - A Summary of the Financial Activity and a reconciliation of any changes in the Structure or classification of appropriations.
  • Part 2 - Details and Expected Performance for Output Expenses
  • Part 3 - Details for Benefits and Other Unrequited Expenses
  • Part 4 - Details for Borrowing Expenses
  • Part 5 - Details and Expected Results for Other Expenses
  • Part 6 - Details and Expected Results for Capital Expenditure

Parts 2 to 6 contain sub-parts for performance information for appropriations related to departmental and non-departmental transactions. This information includes:

  • For existing appropriations that are increased or decreased - the reasons for that change
  • For new appropriations -
    • intended impacts, outcomes and objectives
    • details of expenses and revenue for departmental output expenses appropriations, and of expenses or expenditure for other appropriations
    • reasons for changes, and
    • output performance measures and standards for output expense appropriations.

If particular information is not applicable to a Vote or a specific appropriation or type, or is otherwise unavailable, the relevant heading is not included.

Terms and Definitions

The table below contains terms that are used in the Supplementary Estimates and the Information Supporting the Supplementary Estimates.

Terms and Definitions
Term Definition
Appropriation An appropriation is a parliamentary authorisation for the Crown or an Office of Parliament to incur expenses or capital expenditure.
Appropriation scope One of the defining terms of an appropriation that establishes limits on the activities for which the Crown or an Office of Parliament is authorised to incur expenses or capital expenditure under that appropriation.
Capital expenditure The cost of assets acquired or developed including any ownership interest in entities, but excluding inventory.
Crown revenue and capital receipts Flows accounted for as revenue and capital receipts on behalf of the Crown rather than as departmental revenue.
DDA Department-to-department appropriation - as authorised by section 20(2) of the PFA.
Department Generally references to Departments also include an Office of Parliament as provided in section 26E(4) of the PFA.
Expenses Amounts consumed or losses of service potential or future economic benefits, other than those relating to capital withdrawals, in a financial year.  Expenses are an accrual concept measured in accordance with generally accepted accounting practice.
GST Goods and services tax.  Appropriations are stated GST- exclusive.
MCOA Multi-class output expense appropriation.
MYA Multi-year appropriation.
N/A Not applicable.
Outcomes States or conditions of society, the economy or the environment, including changes in those states or conditions.
Outputs Goods or services supplied by departments and other entities to external parties.  Outputs are a variety of types, including policy advice, administration of contracts and grants, and the provision of specific services.
PFA Public Finance Act 1989
PLA Permanent legislative authority - a traditional term for a permanent appropriation, ie, one that is authorised for an indefinite period by legislation other than an Appropriation Act.
Minister The Minister responsible for specific appropriations being sought within a Vote.  As several Ministers may now hold appropriations within a single Vote, each appropriation will have a tag (M1, M2, etc) identifying the Minister responsible for that line item.
RDA Revenue-dependent appropriation - as authorised by section 21(1) of the PFA 1989.
Responsible Minister The Minister responsible for the financial performance of a department or Crown entity.  In relation to an Office of Parliament, the Office of the Clerk of the House of Representatives, and the Parliamentary Service, the Speaker is the Responsible Minister.
Revenue from the Crown Revenue earned by a department from the Crown for the provision of outputs to or on behalf of the Crown.  These flows are accounted for as departmental revenue.  Revenue from the Crown is eliminated for purposes of reporting the Crown's overall financial performance and position.
Revenue from Others Revenue earned by a department from other departments and from third parties.  Revenue from other departments is eliminated for purposes of reporting the Crown's overall financial performance and position.
Vote A grouping of one or more appropriations that are the responsibility of one or more Ministers of the Crown and are administered by the one department.

Useful Links

The suite of Budget 2011 documents can be accessed in the Budgets section of the website: http://www.treasury.govt.nz/budget/2011. Documents that provide a guide to the PFA and the public sector financial management system can be accessed in the Publications section of the Treasury's website: https://treasury.govt.nz/information-and-services/state-sector-leadership/guidance.

Summary Tables

Summary of Trends

Summary of Trends
 

 

2010/11
Supplementary Estimates

 

Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000
Appropriations          
Output Expenses 33,699,415 (90,540) (7,772) (98,312) 33,601,103
Benefits and Other Unrequited Expenses 21,861,466 N/A (211,125) (211,125) 21,650,341
Borrowing Expenses 3,067,431 - (26,683) (26,683) 3,040,748
Other Expenses 13,992,705 45,240 4,046,973 4,092,213 18,084,918
Capital Expenditure 6,555,273 (377,627) 1,056,975 679,348 7,234,621
Intelligence and Security Department Expenses and Capital Expenditure 106,749 4,258 N/A 4,258 111,007
Total Appropriations 79,283,039 (418,669) 4,858,368 4,439,699 83,722,738
Crown Revenue and Capital Receipts          
Tax Revenue 60,468,512 N/A (2,276,955) (2,276,955) 58,191,557
Non-Tax Revenue 7,313,554 N/A 449,899 449,899 7,763,453
Capital Receipts 1,864,728 N/A (55,082) (55,082) 1,809,646
Total Crown Revenue and Capital Receipts 69,646,794 N/A (1,882,138) (1,882,138) 67,764,656

Appropriations for Output Expenses

Appropriations for Output Expenses
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
ACC 1,196,947 2 - 2 1,196,949
Agriculture and Forestry 176,587 (12,959) 9,122 (3,837) 172,750
Arts, Culture and Heritage 256,347 11,129 (10,028) 1,101 257,448
Attorney-General 65,919 10,723 - 10,723 76,642
Audit 70,902 3,092 - 3,092 73,994
Biosecurity 186,120 (2,544) (1,240) (3,784) 182,336
Canterbury Earthquake Recovery - 3,915 - 3,915 3,915
Climate Change 20,894 (1,655) 297 (1,358) 19,536
Commerce 109,374 2,344 5,495 7,839 117,213
Communications 22,489 2,073 100 2,173 24,662
Community and Voluntary Sector 25,900 1,055 - 1,055 26,955
Conservation 351,277 5,062 (14,590) (9,528) 341,749
Consumer Affairs 5,740 1,757 1,709 3,466 9,206
Corrections 1,158,899 17,198 - 17,198 1,176,097
Courts 425,608 (7,997) - (7,997) 417,611
Crown Research Institutes 1,074 (448) - (448) 626
Customs 133,746 1,433 - 1,433 135,179
Defence 9,791 1,107 - 1,107 10,898
Defence Force 2,279,461 (29,154) - (29,154) 2,250,307
Economic Development 182,144 7,583 39,691 47,274 229,418
Education 4,406,435 (103,989) (28,770) (132,759) 4,273,676
Education Review Office 29,034 - - - 29,034
Emergency Management 11,043 2,539 - 2,539 13,582
Employment 14,219 (10) - (10) 14,209
Energy 198,392 5,656 86,784 92,440 290,832
Environment 83,434 (8,468) (1,623) (10,091) 73,343
Finance 72,844 345 116 461 73,305
Fisheries 103,694 (7,737) - (7,737) 95,957
Food Safety 96,113 (2,877) - (2,877) 93,236
Foreign Affairs and Trade 376,197 (30,988) - (30,988) 345,209
Health 13,030,879 (7,459) (198,198) (205,657) 12,825,222
Housing 674,708 (8,863) 9,011 148 674,856
Immigration 213,316 2,198 - 2,198 215,514
Internal Affairs 159,779 9,562 - 9,562 169,341
Justice 279,234 (13,646) 47,723 34,077 313,311
Labour 81,959 97 - 97 82,056
Lands 105,422 5,378 5 5,383 110,805
Local Government 10,337 333 - 333 10,670
Māori Affairs 191,626 300 (542) (242) 191,384
Ministerial Services 39,615 267 - 267 39,882
National Archives 22,830 134 - 134 22,964
National Library 70,472 800 - 800 71,272
Office of the Clerk 18,222 554 - 554 18,776
Official Development Assistance 39,563 23,712 - 23,712 63,275
Ombudsmen 7,957 - - - 7,957
Pacific Island Affairs 8,451 395 - 395 8,846
Parliamentary Commissioner for the Environment 2,340 - - - 2,340
Parliamentary Counsel 21,132 (266) - (266) 20,866
Parliamentary Service 67,015 2,643 - 2,643 69,658
Police 1,464,948 18,936 - 18,936 1,483,884
Prime Minister and Cabinet 16,147 1,050 - 1,050 17,197
Racing 359 (92) - (92) 267
Research, Science and Technology 650,631 5,705 (9,594) (3,889) 646,742
Revenue 648,263 (5,346) - (5,346) 642,917
Senior Citizens 1,035 - - - 1,035
Serious Fraud 7,470 3,593 - 3,593 11,063
Social Development 1,515,906 (7,336) 40,295 32,959 1,548,865
Sport and Recreation 59,853 - 9,350 9,350 69,203
State Services 30,702 796 - 796 31,498
State-Owned Enterprises 2,739 1,448 - 1,448 4,187
Statistics 144,666 2,136 - 2,136 146,802
Tourism 108,506 592 13,343 13,935 122,441
Transport 1,871,139 3,182 (7,198) (4,016) 1,867,123
Treaty Negotiations 31,816 (75) - (75) 31,741
Veterans' Affairs - Defence Force 10,450 17 700 717 11,167
Veterans' Affairs - Social Development 450 - - - 450
Women's Affairs 4,635 372 - 372 5,007
Youth Development 14,219 156 270 426 14,645
Total Output Expenses 33,699,415 (90,540) (7,772) (98,312) 33,601,103

Appropriations for Benefits and Other Unrequited Expenses

Appropriations for Benefits and Other Unrequited Expenses
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
ACC 54,730 N/A - - 54,730
Agriculture and Forestry 1,100 N/A (500) (500) 600
Education 73,288 N/A (3,621) (3,621) 69,667
Housing 4,790 N/A (1,031) (1,031) 3,759
Local Government 57,000 N/A 800 800 57,800
Māori Affairs 480 N/A - - 480
Ministerial Services 475 N/A 625 625 1,100
Pacific Island Affairs 108 N/A - - 108
Revenue 4,429,820 N/A (193,220) (193,220) 4,236,600
Social Development 16,900,354 N/A (12,322) (12,322) 16,888,032
Veterans' Affairs - Defence Force 159,672 N/A (1,179) (1,179) 158,493
Veterans' Affairs - Social Development 179,649 N/A (677) (677) 178,972
Total Benefits and Other Unrequited Expenses 21,861,466 - (211,125) (211,125) 21,650,341

 

Appropriations for Borrowing Expenses

Appropriations for Borrowing Expenses
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
Finance 3,058,421 - (26,683) (26,683) 3,031,738
Revenue 9,010 - - - 9,010
Total Borrowing Expenses 3,067,431 - (26,683) (26,683) 3,040,748

Appropriations for Other Expenses

Appropriations for Other Expenses
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
Agriculture and Forestry 90,359 - (35,424) (35,424) 54,935
Arts, Culture and Heritage 29,356 - 9,793 9,793 39,149
Audit 751 52 - 52 803
Biosecurity 330 - 17,500 17,500 17,830
Climate Change 1,042,218 - 482,714 482,714 1,524,932
Commerce 10,055 - 2,400 2,400 12,455
Communications 930 - 1,000 1,000 1,930
Community and Voluntary Sector 20,425 - - - 20,425
Conservation 3,433 1,500 9,726 11,226 14,659
Courts 317,488 - (26,624) (26,624) 290,864
Crown Research Institutes - - 755 755 755
Customs 2,088 - (34) (34) 2,054
Defence Force - 3,250 - 3,250 3,250
Economic Development 122,795 - 78,228 78,228 201,023
Education 6,750,126 14,720 270,102 284,822 7,034,948
Emergency Management 2,889 - 28,764 28,764 31,653
Energy 116,416 - 3,832 3,832 120,248
Environment 54,874 - 3,191 3,191 58,065
Finance 796,357 - 2,287,598 2,287,598 3,083,955
Fisheries 1,110 - 11,498 11,498 12,608
Food Safety 2,150 - (164) (164) 1,986
Foreign Affairs and Trade 57,838 - 5,000 5,000 62,838
Health 31,947 - (2,400) (2,400) 29,547
Housing 56,747 - 699,393 699,393 756,140
Immigration 2,577 - (1,492) (1,492) 1,085
Internal Affairs 49 3,100 1,748 4,848 4,897
Justice 15,561 14,500 (5,089) 9,411 24,972
Labour 5,553 1,678 222 1,900 7,453
Lands 42,644 - 16,667 16,667 59,311
Local Government 3,844 - 354 354 4,198
Māori Affairs 9,590 - 1,072 1,072 10,662
Ministerial Services 20,437 - 323 323 20,760
Official Development Assistance 484,967 - 8,243 8,243 493,210
Ombudsmen 611 184 - 184 795
Parliamentary Commissioner for the Environment 256 12 - 12 268
Parliamentary Service 58,192 180 2,188 2,368 60,560
Police 1,867 - - - 1,867
Prime Minister and Cabinet 2,558 - 20,222 20,222 22,780
Racing 4,000 - - - 4,000
Research, Science and Technology 101,465 - 19,405 19,405 120,870
Revenue 1,654,650 4,380 (40,650) (36,270) 1,618,380
Social Development 946,856 - 238,397 238,397 1,185,253
Sport and Recreation 4,294 - 1,300 1,300 5,594
State Services 203,130 - (5,707) (5,707) 197,423
Statistics - 1,684 - 1,684 1,684
Tourism 31,167 - - - 31,167
Transport 521,085 - (56,858) (56,858) 464,227
Treaty Negotiations 364,720 - 480 480 365,200
Veterans' Affairs - Defence Force 1,950 - (700) (700) 1,250
Total Other Expenses 13,992,705 45,240 4,046,973 4,092,213 18,084,918

Appropriations for Capital Expenditure

Appropriations for Capital Expenditure
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
Agriculture and Forestry 36,749 (16,249) 340 (15,909) 20,840
Arts, Culture and Heritage 9,415 315 450 765 10,180
Attorney-General 891 (477) - (477) 414
Audit 1,552 (507) - (507) 1,045
Canterbury Earthquake Recovery - 20 - 20 20
Climate Change 2,248 - 1,204 1,204 3,452
Commerce 2,055 - 5,400 5,400 7,455
Communications 248,610 - (144,910) (144,910) 103,700
Conservation 68,950 5,000 4,991 9,991 78,941
Corrections 250,937 (47,139) - (47,139) 203,798
Customs 48,536 (26,771) - (26,771) 21,765
Defence 229,068 - (57,194) (57,194) 171,874
Defence Force 572,914 (172,914) - (172,914) 400,000
Economic Development 13,547 10,482 28,650 39,132 52,679
Education 739,634 (48,788) 20,649 (28,139) 711,495
Education Review Office 1,000 692 - 692 1,692
Energy 2,000 - 9,011 9,011 11,011
Environment 585 (10) - (10) 575
Finance 91,022 82 827,525 827,607 918,629
Fisheries 2,900 3,935 - 3,935 6,835
Foreign Affairs and Trade 66,098 (18,854) - (18,854) 47,244
Health 510,921 3,531 (3,465) 66 510,987
Housing 207,835 (5,241) (4,883) (10,124) 197,711
Internal Affairs 23,590 20,619 - 20,619 44,209
Justice 94,680 (31,304) 1,217 (30,087) 64,593
Labour 36,200 - - - 36,200
Lands 30,972 (4,401) 2,233 (2,168) 28,804
Local Government 45,827 - 29,034 29,034 74,861
Māori Affairs 3,237 (1,748) - (1,748) 1,489
National Archives 4,767 (3,079) - (3,079) 1,688
National Library 31,783 (24,124) - (24,124) 7,659
Office of the Clerk 1,325 - - - 1,325
Ombudsmen 123 - - - 123
Pacific Island Affairs 90 - - - 90
Parliamentary Commissioner for the Environment 71 - - - 71
Parliamentary Counsel 4,945 (2,420) - (2,420) 2,525
Parliamentary Service 5,690 2,535 2,437 4,972 10,662
Police 113,800 16,020 - 16,020 129,820
Prime Minister and Cabinet 13,122 (706) 5,813 5,107 18,229
Research, Science and Technology 16,345 3,723 - 3,723 20,068
Revenue 95,788 (24,862) - (24,862) 70,926
Serious Fraud 530 192 - 192 722
Social Development 1,870,531 (13,917) (9,199) (23,116) 1,847,415
State Services 4,804 (1,270) 102 (1,168) 3,636
Statistics 16,000 - - - 16,000
Transport 1,017,264 (25) 321,770 321,745 1,339,009
Treaty Negotiations 16,260 - 15,800 15,800 32,060
Women's Affairs 62 33 - 33 95
Total Capital Expenditure 6,555,273 (377,627) 1,056,975 679,348 7,234,621

Appropriations for Intelligence and Security Department Expenses and Capital Expenditure

Appropriations for Intelligence and Security Department Expenses and Capital Expenditure
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
Communications Security and Intelligence 70,440 3,486 N/A 3,486 73,926
Security Intelligence 36,309 772 N/A 772 37,081
Total Intelligence and Security Department Expenses and Capital Expenditure 106,749 4,258 - 4,258 111,007

Total Appropriations for Each Vote

Total Appropriations for Each Vote
  2010/11
  Supplementary Estimates  
Main Estimates Departmental
transactions
Non-departmental
transactions
Total transactions Cumulative vote
VOTE $000 $000 $000 $000 $000
ACC 1,251,677 2 - 2 1,251,679
Agriculture and Forestry 304,795 (29,208) (26,462) (55,670) 249,125
Arts, Culture and Heritage 295,118 11,444 215 11,659 306,777
Attorney-General 66,810 10,246 - 10,246 77,056
Audit 73,205 2,637 - 2,637 75,842
Biosecurity 186,450 (2,544) 16,260 13,716 200,166
Canterbury Earthquake Recovery - 3,935 - 3,935 3,935
Climate Change 1,065,360 (1,655) 484,215 482,560 1,547,920
Commerce 121,484 2,344 13,295 15,639 137,123
Communications 272,029 2,073 (143,810) (141,737) 130,292
Communications Security and Intelligence 70,440 3,486 - 3,486 73,926
Community and Voluntary Sector 46,325 1,055 - 1,055 47,380
Conservation 423,660 11,562 127 11,689 435,349
Consumer Affairs 5,740 1,757 1,709 3,466 9,206
Corrections 1,409,836 (29,941) - (29,941) 1,379,895
Courts 743,096 (7,997) (26,624) (34,621) 708,475
Crown Research Institutes 1,074 (448) 755 307 1,381
Customs 184,370 (25,338) (34) (25,372) 158,998
Defence 238,859 1,107 (57,194) (56,087) 182,772
Defence Force 2,852,375 (198,818) - (198,818) 2,653,557
Economic Development 318,486 18,065 146,569 164,634 483,120
Education 11,969,483 (138,057) 258,360 120,303 12,089,786
Education Review Office 30,034 692 - 692 30,726
Emergency Management 13,932 2,539 28,764 31,303 45,235
Employment 14,219 (10) - (10) 14,209
Energy 316,808 5,656 99,627 105,283 422,091
Environment 138,893 (8,478) 1,568 (6,910) 131,983
Finance 4,018,644 427 3,088,556 3,088,983 7,107,627
Fisheries 107,704 (3,802) 11,498 7,696 115,400
Food Safety 98,263 (2,877) (164) (3,041) 95,222
Foreign Affairs and Trade 500,133 (49,842) 5,000 (44,842) 455,291
Health 13,573,747 (3,928) (204,063) (207,991) 13,365,756
Housing 944,080 (14,104) 702,490 688,386 1,632,466
Immigration 215,893 2,198 (1,492) 706 216,599
Internal Affairs 183,418 33,281 1,748 35,029 218,447
Justice 389,475 (30,450) 43,851 13,401 402,876
Labour 123,712 1,775 222 1,997 125,709
Lands 179,038 977 18,905 19,882 198,920
Local Government 117,008 333 30,188 30,521 147,529
Māori Affairs 204,933 (1,448) 530 (918) 204,015
Ministerial Services 60,527 267 948 1,215 61,742
National Archives 27,597 (2,945) - (2,945) 24,652
National Library 102,255 (23,324) - (23,324) 78,931
Office of the Clerk 19,547 554 - 554 20,101
Official Development Assistance 524,530 23,712 8,243 31,955 556,485
Ombudsmen 8,691 184 - 184 8,875
Pacific Island Affairs 8,649 395 - 395 9,044
Parliamentary Commissioner for the Environment 2,667 12 - 12 2,679
Parliamentary Counsel 26,077 (2,686) - (2,686) 23,391
Parliamentary Service 130,897 5,358 4,625 9,983 140,880
Police 1,580,615 34,956 - 34,956 1,615,571
Prime Minister and Cabinet 31,827 344 26,035 26,379 58,206
Racing 4,359 (92) - (92) 4,267
Research, Science and Technology 768,441 9,428 9,811 19,239 787,680
Revenue 6,837,531 (25,828) (233,870) (259,698) 6,577,833
Security Intelligence 36,309 772 - 772 37,081
Senior Citizens 1,035 - - - 1,035
Serious Fraud 8,000 3,785 - 3,785 11,785
Social Development 21,233,647 (21,253) 257,171 235,918 21,469,565
Sport and Recreation 64,147 - 10,650 10,650 74,797
State Services 238,636 (474) (5,605) (6,079) 232,557
State-Owned Enterprises 2,739 1,448 - 1,448 4,187
Statistics 160,666 3,820 - 3,820 164,486
Tourism 139,673 592 13,343 13,935 153,608
Transport 3,409,488 3,157 257,714 260,871 3,670,359
Treaty Negotiations 412,796 (75) 16,280 16,205 429,001
Veterans' Affairs - Defence Force 172,072 17 (1,179) (1,162) 170,910
Veterans' Affairs - Social Development 180,099 - (677) (677) 179,422
Women's Affairs 4,697 405 - 405 5,102
Youth Development 14,219 156 270 426 14,645
Total Appropriations 79,283,039 (418,669) 4,858,368 4,439,699 83,722,738

Current Year Revenue-Dependent Appropriations

Current Year Revenue-Dependent Appropriations
Vote Appropriation Title
Agriculture and Forestry Support Services and Infrastructure to Other Agencies
Audit Audit and Assurance Services
Energy Energy and Resource Information Services
Internal Affairs Contestable Services

Multi-Year Appropriations by Vote, Appropriation Type and Period

Multi-Year Appropriations by Vote, Appropriation Type and Period
Vote Appropriation Type Appropriation Title Period
      Commences Expires
Arts, Culture and Heritage Output expenses (departmental) Cultural Diplomacy International Programme 01 Jul 2010 30 Jun 2015
Other expenses (non-departmental) New Zealand Screen Production Incentive Fund 01 Jul 2008 30 Jun 2013
Climate Change Output expenses (departmental) Land Use and Carbon Analysis System 01 Jul 2010 30 Jun 2014
Consumer Affairs Output expenses (departmental) Upgrading and Promoting the Consumer Powerswitch Website 01 Nov 2010 30 Apr 2014
Economic Development Output expenses (non-departmental) New Zealand's Participation at Expo 2010 Shanghai, China 01 Jul 2008 30 Jun 2011
Other expenses (non-departmental) Rugby World Cup Leverage and Legacy Programmes 01 Jul 2010 30 Jun 2012
Transformational Initiatives Fund 01 Mar 2009 30 Jun 2013
Energy Output expenses (non-departmental) Acquisition of Petroleum Exploration Data 01 Jul 2009 30 Jun 2014
Generating Reserve Electricity At Whirinaki 01 Jul 2007 30 Jun 2012
Reserve Energy and Emergency Measures - Variable 01 Jul 2007 30 Jun 2012
Reserve Energy and Emergency Measures - Variable Costs 01 Nov 2010 30 Jun 2012
Other expenses (non-departmental) Contestable Fund for Deployment of Marine Energy Devices 01 Jul 2007 30 Jun 2011
Promoting and Facilitating Customer Switching 01 Nov 2010 30 Apr 2014
Ratana Housing Repairs 06 Dec 2010 30 Jun 2013
Warm Up New Zealand 01 Jan 2010 30 Jun 2013
Environment Output expenses (non-departmental) Contestable Aquaculture Planning Fund 01 Jul 2006 30 Jun 2011
  Protecting Lake Taupo Programme 22 Sep 2010 30 Jun 2015
Housing Output expenses (departmental) Building Regulation and Control 01 Jul 2010 30 Jun 2013
Occupational Licensing 01 Jul 2010 30 Jun 2013
Residential Tenancy and Unit Title Services 01 Jul 2010 30 Jun 2013
Other expenses (non-departmental) Weathertight Services: Guarantee Fee Subsidy 01 Jul 2010 30 Jun 2015
Lands Capital expenditure (non-departmental) Land Tenure Reform Acquisitions 01 Jul 2008 30 Jun 2011
Official Development Assistance Other expenses (non-departmental) Global Development Assistance 01 Jul 2009 30 Jun 2012
Pacific Development Assistance 01 Jul 2009 30 Jun 2012
Parliamentary Service Capital expenditure (non-departmental) Crown Asset Management 01 Jul 2008 30 Jun 2012
Statistics Output expenses (departmental) 2011 Census of Population and Dwellings 01 Jul 2007 30 Jun 2012
Tourism Other expenses (non-departmental) The National Cycleway Fund 01 Jul 2009 30 Jun 2012
Transport Other expenses (non-departmental) Auckland Rail Development 01 Jul 2009 30 Jun 2014
Rail Network and Rolling Stock Upgrade 01 Jul 2009 30 Jun 2012
Wellington Rail Development 01 Jul 2009 30 Jun 2011
Capital expenditure (non-departmental) Joint Venture Airports - Crown Contribution 01 Jul 2008 30 Jun 2011
Treaty Negotiations Other expenses (non-departmental) Historical Treaty of Waitangi Settlements 2010-2014 30 Jun 2010 30 Jun 2014
Historical Treaty of Waitangi Settlements 2011 - 2015 30 Jun 2011 30 Jun 2015

Crown Revenue and Capital Receipts

Crown Revenue and Capital Receipts
  2010/11
Tax Revenue Non-Tax Revenue Capital Receipts
VOTE Main
Estimates
$000
Supplementary
Estimates
$000
Total
Budgeted
$000
Main
Estimates
$000
Supplementary
Estimates
$000
Total
Budgeted
$000
Main
Estimates
$000
Supplementary
Estimates
$000
Total
Budgeted
$000
Agriculture and Forestry - - - 105,998 23,459 129,457 3,300 2,823 6,123
Arts, Culture and Heritage - - - - 7 7 - - -
Biosecurity - - - 850 745 1,595 - - -
Climate Change - - - 377,539 206,374 583,913 - - -
Commerce - - - 23,925 2,331 26,256 - - -
Communications - - - 7,791 - 7,791 26,403 (13,953) 12,450
Conservation - - - 16,124 (1,800) 14,324 - 7,800 7,800
Consumer Affairs - - - 20 1,709 1,729 - - -
Courts - - - 284,406 (85,975) 198,431 - - -
Crown Research Institutes - - - - 817 817 - - -
Customs 10,823,000 (248,000) 10,575,000 80 - 80 - - -
Defence - - - 200 - 200 328,722 (192,925) 135,797
Education - - - 69,570 13,131 82,701 1,080 (411) 669
Energy 37,874 - 37,874 641,154 (11,532) 629,622 2,000 - 2,000
Environment - - - 30,400 (4,000) 26,400 - - -
Finance - - - 3,265,494 447,730 3,713,224 746 176,616 177,362
Fisheries - - - 37,151 3,756 40,907 100 (100) -
Health - - - 639,011 (51,223) 587,788 51,299 - 51,299
Housing - - - 165,156 (700) 164,456 5,047 - 5,047
Immigration - - - 9,715 982 10,697 - - -
Justice - - - 476 - 476 200 - 200
Labour - - - 40,870 3,776 44,646 - - -
Lands - - - 43,187 3,733 46,920 6,966 - 6,966
Local Government - - - 125 - 125 - - -
Māori Affairs - - - 10 - 10 - - -
Police - - - 86,200 (3,000) 83,200 - - -
Prime Minister and Cabinet - - - - - - - 30 30
Research, Science and Technology - - - - 4,371 4,371 - - -
Revenue 48,516,000 (2,067,000) 46,449,000 1,295,000 (104,000) 1,191,000 825,000 (30,500) 794,500
Social Development - - - 78,260 (1,817) 76,443 613,865 (4,462) 609,403
State Services - - - 13,150 (1,740) 11,410 - - -
Tourism - - - 649 (259) 390 - - -
Transport 1,091,638 38,045 1,129,683 75,166 1,701 76,867 - - -
Treaty Negotiations - - - 5,877 1,323 7,200 - - -
Total Crown Revenue and Capital Receipts 60,468,512 (2,276,955) 58,191,557 7,313,554 449,899 7,763,453 1,864,728 (55,082) 1,809,646

Balances of Net Assets of Departments

Balances of Net Assets of Departments
  2010/11
Projected Closing Balance
  Main Estimates Supplementary
Estimates
DEPARTMENT $000 $000
Agriculture and Forestry, Ministry of  (see Vote: Agriculture and Forestry) 51,685 37,341
Archives New Zealand (see Vote: National Archives) 74,339 -
Building and Housing, Department of  (see Vote: Housing) 19,722 19,470
Canterbury Earthquake Recovery Authority (see Vote: Canterbury Earthquake Recovery) - 50
Clerk of the House of Representatives, Office of the  (see Vote: Office of the Clerk) 6,243 6,243
Conservation, Department of  (see Vote: Conservation) 584,458 581,031
Controller and Auditor-General (see Vote: Audit) 4,021 4,021
Corrections, Department of  (see Vote: Corrections) 2,218,745 2,193,059
Crown Law Office (see Vote: Attorney-General) 2,063 4,757
Culture and Heritage, Ministry for  (see Vote: Arts, Culture and Heritage) 1,132 1,447
Customs Service, New Zealand  (see Vote: Customs) 87,557 56,479
Defence Force, New Zealand  (see Vote: Defence Force) 5,815,142 5,653,814
Defence, Ministry of  (see Vote: Defence) 3,416 3,416
Economic Development, Ministry of  (see Vote: Economic Development) 27,142 34,418
Education Review Office (see Vote: Education Review Office) 3,572 3,572
Education, Ministry of  (see Vote: Education) 11,426,384 10,328,819
Environment, Ministry for the  (see Vote: Environment) 6,002 5,992
Fisheries, Ministry of  (see Vote: Fisheries) 13,335 13,335
Food Safety Authority, New Zealand  (see Vote: Food Safety) - -
Foreign Affairs and Trade, Ministry of  (see Vote: Foreign Affairs and Trade) 526,807 505,446
Health, Ministry of  (see Vote: Health) 43,254 43,254
Inland Revenue Department (see Vote: Revenue) 265,427 264,963
Internal Affairs, Department of  (see Vote: Internal Affairs) 94,525 299,937
Justice, Ministry of  (see Vote: Justice) 772,554 770,997
Labour, Department of  (see Vote: Labour) 82,150 74,172
Land Information New Zealand (see Vote: Lands) 41,418 50,350
National Library of New Zealand (see Vote: National Library) 131,236 -
Ombudsmen, Office of the  (see Vote: Ombudsmen) 329 329
Pacific Island Affairs, Ministry of  (see Vote: Pacific Island Affairs) 1,113 1,023
Parliamentary Commissioner for the Environment (see Vote: Parliamentary Commissioner for the Environment) 614 614
Parliamentary Counsel Office (see Vote: Parliamentary Counsel) 15,332 15,091
Parliamentary Service (see Vote: Parliamentary Service) 25,760 25,760
Police, New Zealand  (see Vote: Police) 892,508 891,275
Prime Minister and Cabinet, Department of the  (see Vote: Prime Minister and Cabinet) 703 703
Research, Science and Technology, Ministry of  (see Vote: Research, Science and Technology) 2,411 -
Science and Innovation, Ministry of (see Vote: Research, Science and Technology) - 11,340
Serious Fraud Office (see Vote: Serious Fraud) 1,077 452
Social Development, Ministry of  (see Vote: Social Development) 309,024 296,323
State Services Commission (see Vote: State Services) 8,495 6,893
Statistics New Zealand (see Vote: Statistics) 52,943 52,943
Te Puni Kōkiri (see Vote: Māori Affairs) 4,621 4,621
The Treasury (see Vote: Finance) 5,742 5,742
Transport, Ministry of  (see Vote: Transport) 2,958 3,116
Women's Affairs, Ministry of  (see Vote: Women's Affairs) 336 336
Total Net Assets 23,626,295 22,272,944

Vote ACC

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for ACC (M1)

ADMINISTERING DEPARTMENT: Department of Labour

MINISTER RESPONSIBLE FOR DEPARTMENT OF LABOUR: Minister of Labour

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - ACC
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Policy and Monitoring (M1)

To provide policy advice, analysis, evaluation, research, monitoring, purchase advice, legislation and regulatory support, and ministerial servicing on the ACC scheme and the performance of the Accident Compensation Corporation (ACC).
4,692 2 4,694

Regulatory Services (M1)

To manage the residual long-term responsibility related to the Crown's ongoing risks resulting from the introduction of the competitive accident insurance market during 1999/2000.
164 - 164

Total Departmental Output Expenses

4,856 2 4,858

Non-Departmental Output Expenses

     

Case Management and Supporting Services (M1)

To cover the cost of injury prevention, claim processing, assessment, payment services and case management on the Non-Earners' Account.
64,783 - 64,783

Claim Entitlements and Services (M1)

To cover the cost of purchasing medical services, social rehabilitation and elective health care services on the Non-Earners' Account and contracted services.
649,392 - 649,392

Public Health Acute Services (M1)

To fund public health acute services for claims on the Non-Earners' Account.
265,847 - 265,847

Services for Treatment Injuries (M1)

This appropriation is limited to the provision of medical services, health care, elective surgery, social rehabilitation and the management of cases for claimants with treatment injuries.
212,069 - 212,069

Total Non-Departmental Output Expenses

1,192,091 - 1,192,091

Benefits and Other Unrequited Expenses

     

Other Compensation (M1)

This appropriation is limited to the provision of income maintenance, independence allowance, and other compensation payments for claims on the Non-Earners' Account.
35,771 - 35,771

Other Compensation - Treatment Injuries for Non-Earners (M1)

This appropriation is limited to the provision of income maintenance, independence allowance, and other compensation payments for claims by non-earners on the Treatment Injury Account.
18,959 - 18,959

Total Benefits and Other Unrequited Expenses

54,730 - 54,730

Total Annual and Permanent Appropriations

1,251,677 2 1,251,679

Information Supporting the Supplementary Estimates Vote ACC

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for ACC (M1)

ADMINISTERING DEPARTMENT: Department of Labour

MINISTER RESPONSIBLE FOR DEPARTMENT OF LABOUR: Minister of Labour

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - ACC
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 1,196,947 2 - 2 1,196,949
Benefits and Other Unrequited Expenses 54,730 N/A - - 54,730
Borrowing Expenses - - - - -
Other Expenses - - - - -
Capital Expenditure - - - - -
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

1,251,677 2 - 2 1,251,679

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Policy and Monitoring (M1)

Scope of Appropriation

To provide policy advice, analysis, evaluation, research, monitoring, purchase advice, legislation and regulatory support, and ministerial servicing on the ACC scheme and the performance of the Accident Compensation Corporation (ACC).

Expenses and Revenue

Expenses and Revenue - Policy and Monitoring (M1) - ACC
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 4,692 2 4,694
Revenue from Crown 4,628 2 4,630
Revenue from Other 64 - 64

Reasons for Change in Appropriation

This appropriation increased by $2,000 to $4.694 million in 2010/11. The increase relates to:

  • a forecast change for the Government Superannuation Fund employer contribution rate ($13,000)
  • an expenditure transfer from 2009/10 for a departmental transformation project ($8,000).

This is partially offset by a decrease in funding relating to an expenditure transfer to outyears for departmental transformation projects ($19,000).

Vote Agriculture and Forestry

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Agriculture (M2), Minister of Forestry (M35)

ADMINISTERING DEPARTMENT: Ministry of Agriculture and Forestry

MINISTER RESPONSIBLE FOR MINISTRY OF AGRICULTURE AND FORESTRY: Minister of Agriculture

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Agriculture and Forestry
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Administration and Management of Crown Forestry Assets (M35)

This appropriation is limited to administration and management of the Crown's interest in forests and forestry-related assets.
1,799 (85) 1,714

Administration of Grants and Programmes (M2)

This appropriation is limited to the administration of government approved schemes, grants and assistance to the land-based sectors.
6,766 1,498 8,264

Animal Welfare Education and Enforcement (M2)

This appropriation is limited to standard setting, education and enforcement intended to improve animal welfare in New Zealand.
3,796 492 4,288

Implementation of the Emissions Trading Scheme and Indigenous Forestry (M2)

This appropriation is limited to the implementation of the agriculture and forestry provisions of the Climate Change Response Act 2002 and the indigenous forestry provisions of the Forests Act 1949.
15,920 (4,291) 11,629

Policy Advice MCOA (M2)

36,794 (393) 36,401
Agriculture and Forestry Policy Advice
This output class is limited to policy advice, developing and administering legislation, communication, and implementation on economic, environmental and social matters affecting land based sectors, and ministerial servicing.
20,187 4,911 25,098
Animal Welfare Policy Advice
This output class is limited to policy advice and analysis on animal welfare, and ministerial servicing.
750 94 844
Climate Change Policy Advice
This output class is limited to policy advice, developing and administering legislation, communication, and implementation on climate change matters affecting land based sectors, and ministerial servicing.
15,857 (5,398) 10,459

Support Services and Infrastructure to Other Agencies RDA (M2)

This appropriation is limited to the provision of support services to other agencies, including financial, personnel and information technology services and subleasing of surplus accommodation.
11,530 (10,180) 1,350

Total Departmental Output Expenses

76,605 (12,959) 63,646

Non-Departmental Output Expenses

     

Climate Change Research (M2)

This appropriation is limited to obtaining science, research, technology, capacity and capability in climate change related to the primary land-based sectors.
8,100 500 8,600

Management of Crown Forestry Assets (M35)

Payments for forest and asset management of Crown forests established on both Crown-Owned and leased Maori land and 13 leases of Crown-Owned land to other parties for forestry purposes.
90,093 8,622 98,715

Support for Walking Access (M2)

This appropriation is limited to the operation of the New Zealand Walking Access Commission.
1,789 - 1,789

Total Non-Departmental Output Expenses

99,982 9,122 109,104

Benefits and Other Unrequited Expenses

     

Rural Veterinarians Bonding Scheme (M2)

This appropriation is limited to the provision of payments to veterinary professionals agreeing to work in understaffed, rural areas, in accordance with government approved criteria and guidelines.
1,100 (500) 600

Total Benefits and Other Unrequited Expenses

1,100 (500) 600

Non-Departmental Other Expenses

     

Adverse Climatic Events (M2)

This appropriation is limited to providing recovery assistance to the primary sector in the aftermath of adverse climatic events and assistance to rural support trusts.
526 325 851

Afforestation Grant Scheme (M35)

This appropriation is limited to Afforestation Grant Scheme grants.
7,654 (1,895) 5,759

Community Irrigation Fund and Schemes (M2)

This appropriation is limited to Community Irrigation Fund grants and operating and maintaining Crown irrigation schemes.
1,626 469 2,095

East Coast Afforestation Grants (M35)

This appropriation is limited to grants under the Forestry (East Coast) Grants Regulations 1992.
4,500 (786) 3,714

Global Research Alliance on Agricultural Greenhouse Gases (M2)

This appropriation is limited to the Global Research Alliance on Agricultural Greenhouse Gases.
5,000 (906) 4,094

Hill Country Erosion Fund (M2)

This appropriation is limited to projects that protect erosion-prone hill country.
3,100 200 3,300

Primary Growth Partnership (M2)

This appropriation is limited to primary, food and forestry sector investment in education and skills development, research and development, product development, commercialisation, market development and technology transfer, in partnership with relevant industry groups, including research related to greenhouse gases via the Centre for Agricultural Greenhouse Gas Research.
56,425 (32,204) 24,221

Subscriptions to International Organisations (M2)

This appropriation is limited to New Zealand's membership of agricultural and forestry related international organisations.
2,328 (403) 1,925

Sustainable Farming Fund (M2)

This appropriation is limited to community driven programmes aimed at improving economic and environmental performance.
9,200 (224) 8,976

Total Non-Departmental Other Expenses

90,359 (35,424) 54,935

Departmental Capital Expenditure

     

Ministry of Agriculture and Forestry - Capital Expenditure PLA (M2)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Agriculture and Forestry, as authorised by section 24(1) of the Public Finance Act 1989.
36,249 (16,249) 20,000

Total Departmental Capital Expenditure

36,249 (16,249) 20,000

Non-Departmental Capital Expenditure

     

Crown Forestry Asset Management (M35)

This appropriation is limited to forestry operations, management services, research and related forest asset expenditure.
- 340 340

New Zealand Walking Access Commission (M2)

This appropriation is limited to the purchase and development of capital assets by the New Zealand Walking Access Commission.
500 - 500

Total Non-Departmental Capital Expenditure

500 340 840

Total Annual and Permanent Appropriations

304,795 (55,670) 249,125

Details of Projected Movements in Departmental Net Assets

Ministry of Agriculture and Forestry

Ministry of Agriculture and Forestry - Details of Projected Movements in Departmental Net Assets - Agriculture and Forestry
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 31,602 31,705 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections 20,678 6,231 Capital transfers to 2011/12 for four projects - the design and development of the National Animal Identification Traceability (NAIT) application ($7.020 million), the design and development of the Joint Border Management System (JBMS) with New Zealand Customs Service ($4.477 million), to implement the trans-Tasman transfer of x-ray images of checked-in baggage initiative ($2 million) and for the development of electronic wine certification capability ($950,000).
Capital Withdrawals (595) (595) Part repayment of 2004/05 capital injection for MAF Head Office accommodation.
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

51,685 37,341  

Information Supporting the Supplementary Estimates Vote Agriculture and Forestry

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Agriculture (M2), Minister of Forestry (M35)

ADMINISTERING DEPARTMENT: Ministry of Agriculture and Forestry

MINISTER RESPONSIBLE FOR MINISTRY OF AGRICULTURE AND FORESTRY: Minister of Agriculture

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Agriculture and Forestry
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 176,587 (12,959) 9,122 (3,837) 172,750
Benefits and Other Unrequited Expenses 1,100 N/A (500) (500) 600
Borrowing Expenses - - - - -
Other Expenses 90,359 - (35,424) (35,424) 54,935
Capital Expenditure 36,749 (16,249) 340 (15,909) 20,840
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

304,795 (29,208) (26,462) (55,670) 249,125

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 105,998 N/A 23,459 23,459 129,457
Capital Receipts 3,300 N/A 2,823 2,823 6,123

Total Crown Revenue and Capital Receipts

109,298 N/A 26,282 26,282 135,580

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Administration and Management of Crown Forestry Assets (M35)

Scope of Appropriation

This appropriation is limited to administration and management of the Crown's interest in forests and forestry-related assets.

Expenses and Revenue

Expenses and Revenue - Administration and Management of Crown Forestry Assets (M35) - Agriculture and Forestry
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 1,799 (85) 1,714
Revenue from Crown 1,782 (88) 1,694
Revenue from Other 17 3 20

Reasons for Change in Appropriation

This appropriation will decrease by $85,000 to $1.714 million in 2010/11. This is due to a reallocation of revenue Crown funded resources between output expenses ($88,000) and reduced services to other public sector agencies ($2,000). These changes are offset by an increase in third party funded activity ($5,000).

Administration of Grants and Programmes (M2)

Scope of Appropriation

This appropriation is limited to the administration of government approved schemes, grants and assistance to the land-based sectors.

Expenses and Revenue

Expenses and Revenue - Administration of Grants and Programmes (M2) - Agriculture and Forestry
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 6,766 1,498 8,264
Revenue from Crown 6,696 1,483 8,179
Revenue from Other 70 15 85

Reasons for Change in Appropriation

This appropriation will increase by $1.498 million to $8.264 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($2.256 million); increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($7,000); an expense transfer from 2009/10 for Primary Growth Partnership (PGP) initiative ($265,000); and increase in services to other public sector agencies ($27,000). These changes are offset by an expense transfer to 2011/12 for PGP initiative ($1.045 million) and a decrease in third party funded activity ($12,000).

Output Performance Measures and Standards

Output Performance Measures and Standards - Administration of Grants and Programmes (M2) - Agriculture and Forestry
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Administration of the Afforestation Grants Scheme (AGS)

     

Public Tender Rounds

     

High sequestration rate category

     
Average grant rate/ha (see Note 1) $685 $1,356 $2,041

Regional Council Tender Rounds

     

High sequestration rate category

     
Number of applications approved (see Note 2) 1,600 (1,553) 47
Grant area approved (see Note 3) 50 ha 1,397 ha 1,447 ha

Low sequestration rate category

     
Average grant rate/ha (see Note 4) $2,226 $(1,326) $900

General

     
Percentage of grant applicants notified of their tender outcome within 30 working days of the Tender Round closing date New measure 100% 100%
Percentage of contracts sent to successful applicants within 30 working days of provisional approval New measure 95% 95%
Percentage of valid invoices paid within 30 working days of receipt New measure 100% 100%
Percentage of AGS established forests audited before grant funding is paid New measure 95% 95%

Administration of East Coast Forestry Grants

     
Hectares of annual grant area added to the project New measure 1,500 ha 1,500 ha
Percentage of East Coast Forest Project (ECFP) claims submitted processed within 20 days of receipt New measure 100% 100%
Percentage of ECFP Grant Approval certificates issued before the commencement of the grant period (i.e. by 30 June for the year beginning 1 July) New measure 90% 90%

Administration of the Primary Growth Partnership

     
Number of application rounds considered by Investment Advisory Panel (IAP) each financial year New measure 2 2
Percentage of written comments provided by MAF to IAP within 4 weeks of the closing date of a funding round New measure 95% 95%
Percentage of proposers informed of IAP decision within 4 weeks of IAP making its decision New measure 100% 100%
Percentage of written comments on business plans provided to IAP at least 1 week prior IAP meeting New measure 95% 95%
Percentage of proposers that are notified of the Director General's final decision within 6 weeks of final IAP recommendation New measure 100% 100%

Administration of the Sustainable Farming Fund

     
Members of the independent assessment panel judge they have been provided with sufficient information by MAF to make well informed funding decisions as 8 or better on a rating scale of 1 - 10(where 1 represents poor performance and 10 represents excellent performance) New measure 8 8
Proportion of industry contribution to project total value across all new project budgets New measure 50% 50%
Percentage of grant payments made within 20 working days of MAF receiving all project report reporting New measure 100% 100%

Note 1 - An incorrect Estimates Standard was used because of a drafting error - the Estimates Standard should have been $2,000.

Note 2 - An incorrect Estimates Standard was used because of a drafting error - the Estimates Standard should have been 50.

Note 3 - An incorrect Estimates Standard was used because of a drafting error - the Estimates Standard should have been 1,600 ha.

Note 4 - An incorrect Estimates Standard was used because of a drafting error - the Estimates Standard should have been 900 ha.

Animal Welfare Education and Enforcement (M2)

Scope of Appropriation

This appropriation is limited to standard setting, education and enforcement intended to improve animal welfare in New Zealand.

Expenses and Revenue

Expenses and Revenue - Animal Welfare Education and Enforcement (M2) - Agriculture and Forestry
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 3,796 492 4,288
Revenue from Crown 3,776 485 4,261
Revenue from Other 20 7 27

Reasons for Change in Appropriation

This appropriation will increase by $492,000 to $4.288 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($484,000); increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($1,000); increase in services to other public sector agencies ($2,000); and increase in third party funded activity ($5,000).

Output Performance Measures and Standards

Output Performance Measures and Standards - Animal Welfare Education and Enforcement (M2) - Agriculture and Forestry
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Animal Welfare Education

     
Number of planned farm visits to educate farmers on compliance requirements New measure 500 500

Enforcement of New Zealand's Animal Welfare Regulatory Framework

     
Number of Memorandums of Understanding agreed under Compliance and Enforcement Programme New measure 3 3

Investigations of Alleged Breaches of the Animal Welfare Act 1999

     
Number of complaints received:      
Category I - Minor behaviour breach (warning, infringement or search warrant requiring legal analysis) New measure 600-1,000 600-1,000
Category II - Lower threshold criminal behaviour (strict liability offences) New measure 250 250
Category III - Serious criminal behaviour (all other Animal Welfare offending) New measure 3 3
Percentage of Complainants who have requested notification are notified of the outcome of their complaint New measure 95% 95%
Percentage of complaints that are responded to as per the requirements of the Performance and Technical Standards New measure 95% 95%
Percentage of complainants who request to have their complaint acknowledged will receive this acknowledgement within 5 days of receipt New measure 100% 100%
Percentage of Category II - 'Lower Threshold Criminal Behaviour' investigations that are 'Marked as Closed' or 'Forwarded for Prosecution' within 6 months of the receipt of the complaint New measure 75% 75%
Percentage of Category III - 'Organised Illegal Activity' investigations that are 'Marked as Closed' or 'Forwarded for Prosecution' within 18 months of the receipt of the complaint New measure 75% 75%

Prosecution of Cases of Alleged Breaches of the Animal Welfare Act 1999

     
Percentage of Category II - 'Lower Threshold Criminal Behaviours' files 'Forwarded for Prosecution' are also assessed for 'public good evaluation' within 6 months New measure 100% 100%
Percentage of Category III - 'Organised Illegal Activity' files 'Forwarded for Prosecution' are also assessed for 'public good evaluation' within 18 months New measure 100% 100%
Percentage of cases submitted for 'Public Good Assessment' that receive 'Public Good Clearance' New measure 90% 90%

Implementation of the Emissions Trading Scheme and Indigenous Forestry (M2)

Scope of Appropriation

This appropriation is limited to the implementation of the agriculture and forestry provisions of the Climate Change Response Act 2002 and the indigenous forestry provisions of the Forests Act 1949.

Expenses and Revenue

Expenses and Revenue - Implementation of the Emissions Trading Scheme and Indigenous Forestry (M2) - Agriculture and Forestry
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 15,920 (4,291) 11,629
Revenue from Crown 15,837 (4,365) 11,472
Revenue from Other 83 74 157

Reasons for Change in Appropriation

This appropriation will decrease by $4.291 million to $11.629 million in 2010/11. This is due to: a reprioritisation of resources across financial years ($5.241 million); an expense transfer to 2011/12 for the Field Measurement Approach ($142,000); and decrease in third party funded activity ($19,000). These changes are offset by: a reallocation of revenue Crown funded resources between output expenses ($304,000); an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($14,000); an expense transfer from 2009/10 ($700,000); and increase in services to other public sector agencies ($93,000).

Output Performance Measures and Standards

Output Performance Measures and Standards - Implementation of the Emissions Trading Scheme and Indigenous Forestry (M2) - Agriculture and Forestry
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Implementation of the New Zealand Emissions Trading Scheme

     
Percentage of directions (to transfer New Zealand Units to holding accounts) given to the NZ Emissions Unit Registrar within 20 working days of a Forestry Allocation Plan Final Determination being issued or Emissions Return processing being completed other than those that have been referred for audit New measure 95% 95%
Percentage of 'Post 1989' applications to become ETS participants are processed by MAF within 90 days of lodgement New measure 75% 75%
Percentage of 'Pre 1990' allocation plan applications are processed to Preliminary Determination within 90 days of lodgement New measure 75% 75%
Percentage of recommendations (to register a forestry participant) sent to the Chief Executive of MED within 5 working days of an application or deforestation notification being approved New measure 95% 95%
Percentage of applicants that participate in the customer satisfaction survey give the quality of MAF's ETS service delivery a rating of at least 3 out of 5 (where 1 represents poor performance and 5 represents excellent performance) New measure 75% 75%

Administration of the Permanent Forest Sink Initiative

     
Percentage of applications that are formally acknowledged to applicants in writing, within 5 working days of receipt and, if necessary, advised of all additional information or documents needed to process applications New measure 100% 100%
Percentage of draft covenants sent to eligible applicants within 90 days of receipt of all information needed to process the draft covenant New measure 75% 75%

Promotion of Sustainable Management of Indigenous Forestry

     
Percentage of all applications for Milling Statements approved or declined within 1 month of receipt of all information and supporting documents from applicants, necessary to process the application New measure 90% 90%
Percentage of all applications for Annual Logging Plans approved or declined within 2 months of receipt of all information and supporting documents from applicants necessary to process applications New measure 90% 90%

Investigations of alleged Breaches of New Zealand's Indigenous Forestry Legislative Framework

     
Number of complaints received:      
Category I - Minor behaviour breach (warning, infringement or search warrant requiring legal analysis) New measure 8 8
Category II - Lower threshold criminal behaviour (strict liability offences) New measure 8 8
Category III - Serious criminal behaviour (all other forestry related offending) New measure 4 4
Percentage of complainants that request to have their complaint acknowledged that receive this acknowledgement within 5 working days New measure 100% 100%
Percentage of Category II - 'Lower Threshold Criminal Behaviour' investigations are 'Marked as Closed' or 'Forwarded for Prosecution' within 6 months of the receipt of the complaint New measure 75% 75%
Percentage of Category III - 'Organised Illegal Activity' investigations are 'Marked as Closed' or 'Forwarded for Prosecution' within 18 months of the receipt of the complaint New measure 75% 75%

Prosecution of Alleged Breaches of New Zealand's Indigenous Forestry Legislative Framework

     
Percentage of Category II - 'Lower Threshold Criminal Behaviours' files 'Forwarded for Prosecution' are also assessed for 'public good evaluation' within 6 months New measure 100% 100%
Percentage of Category III - 'Organised Illegal Activity' files 'Forwarded for Prosecution' are also assessed for 'public good evaluation' within 18 months New measure 100% 100%
Percentage of cases submitted for 'Public Good Assessment' that receive 'Public Good Clearance' New measure 90% 90%

Policy Advice MCOA (M2)

Scope of Appropriation

Agriculture and Forestry Policy Advice
This output class is limited to policy advice, developing and administering legislation, communication, and implementation on economic, environmental and social matters affecting land based sectors, and ministerial servicing.
Animal Welfare Policy Advice
This output class is limited to policy advice and analysis on animal welfare, and ministerial servicing.
Climate Change Policy Advice
This output class is limited to policy advice, developing and administering legislation, communication, and implementation on climate change matters affecting land based sectors, and ministerial servicing.

Explanation for Use of Multi-Class Output Expense Appropriation

This multi-class output expense appropriation contains output classes that contribute to the sustainable development of New Zealand's biological resources.

Expenses and Revenue

Expenses and Revenue - Policy Advice MCOA (M2) - Agriculture and Forestry
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Total Appropriation

36,794 (393) 36,401
Agriculture and Forestry Policy Advice 20,187 4,911 25,098
Animal Welfare Policy Advice 750 94 844
Climate Change Policy Advice 15,857 (5,398) 10,459

Revenue from Crown

36,194 (191) 36,003
Agriculture and Forestry Policy Advice 19,857 4,920 24,777
Animal Welfare Policy Advice 750 92 842
Climate Change Policy Advice 15,587 (5,203) 10,384

Revenue from Other

600 (202) 398
Agriculture and Forestry Policy Advice 330 (9) 321
Animal Welfare Policy Advice - 2 2
Climate Change Policy Advice 270 (195) 75

Reasons for Change in Appropriation

This appropriation will decrease by $393,000 to $36.401 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($510,000); an expense transfer to 2011/12 for the Heads of Agreement Mitigation Partnership ($2.078 million); an expense transfer to 2011/12 for negotiation of free trade or closer economic partnership agreements (FTA/CEP negotiations) ($300,000); transfer of funding to non-departmental other expense Adverse Climatic Events to 'top up' the Adverse Events Contingency fund ($200,000); an expense transfer to 2011/12 for Global Research Alliance initiative ($100,000); and a decrease in third party funded activity ($242,000). These changes are offset by: an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($62,000); an expense transfer from 2009/10 to meet cost of amalgamation of New Zealand Food Safety Authority ($250,000); an expense transfer from 2009/10 for Forestry Sector Strategy (NZ Wood) ($600,000); an expense transfer from 2009/10 for FTA/CEP negotiations ($300,000); funding from Vote Foreign Affairs for FTA/CEP negotiations ($210,000); funding from Vote Treaty Negotiations for research on erosion in the Waiapu River catchment ($75,000); a transfer of funding from the non-departmental other expense Global Research Alliance on Agricultural Green House Gases to operate the Global Research Alliance ie, provide the Secretariat function and coordinate New Zealand's input as a member country across agencies and the science sector ($800,000); an expense transfer from 2009/10 to implement a range of initiatives in the Sustainable Land Management and Climate Change: A Preferred Plan of Action ($700,000); and increase in services to other public sector agencies ($40,000).

Output Performance Measures and Standards

Output Performance Measures and Standards - Policy Advice MCOA (M2) - Agriculture and Forestry
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Agriculture and Forestry Policy Advice

     

Development and Provision of Agriculture, Horticulture and Forestry-related Policy Advice

     
Number of policy papers provided to Cabinet New measure 60-70 60-70
It is important to receive an independent assessment of the quality of MAF's policy advice and MAF will submit a sample of work for review by the Institute of Economic Research (NZIER) once a year      
NZIER's mean rating of MAF policy advice on scale of 1-10 New measure 7 7
The Cabinet Office Manual stipulates that "an executive summary must be provided if a paper is more than 4 pages long, or the paper is particularly complex."      
Percentage of MAF Cabinet papers that include summaries when required by the Cabinet Office New measure 100% 100%
The government requires that regulatory proposals are subject to impact analysis to ensure any proposed regulation is in the public interest. MAF therefore needs to ensure its regulatory advice meets standards of best practise and demonstrates this in the development of regulatory impact statements. Only significant Regulatory Impact Statements are assessed by Treasury      
Percentage of MAF Regulatory Impact Statements assessed by Treasury that meet the regulatory assessment requirements New measure 100% 100%
Complaints about the quality of MAF's regulations can be made to the Parliamentary Regulations Review Committee which can, if substantiated, make recommendations to the House under standing orders for changes to MAF's regulations      
Percentage of MAF regulations which the Review Committee considers follows good practice and that are not brought to the attention of the House in accordance with Standing Orders New measure 100% 100%
The Cabinet Office measures the timeliness and 'structural quality' (length and presence of summaries) of all papers that are submitted to Cabinet or Cabinet Committees. They provide agencies with analysis of how their performance compares to overall averages      
Percentage of MAF Cabinet papers deemed to meet Cabinet Office report back deadlines New measure 95% 95%

Animal Welfare Policy Advice

     

Research to support the development of animal welfare standards

     
Number of animal welfare projects completed New measure 4 4

Development of Codes of Welfare under the Animal Welfare Act 1999

     
The National Animal Welfare Advisory Committee (NAWAC) members rate the quality of administrative support and scientific policy and legal advice provided by MAF as 3 or better on a scale of 1 to 5 (where 1 represents poor performance and 5 represents excellent) New measure 3 3

Coordination of the Sanitary and Phytosanitary (SPS) Chapter Components of Free Trade Agreement (FTA) Negotiations

     
Percentage of papers and advice relating to the coordination of the SPS components of the free trade agreement negotiations that are provided within agreed timeframes New measure 100% 100%

Provision of Input into Briefings and Participation in the Negotiation of Non-sanitary and Phytosanitary Components of Free Trade Agreements

     
Percentage of papers and advice relating to the coordination of the non-SPS components of the free trade agreement negotiations that are provided within agreed timeframes New measure 100% 100%

Input into Briefing, and participation in the Negotiation and Regular Sessions of the World Trade Organisation (WTO)

     
Percentage of papers and advice relating to the WTO negotiations/committees that are provided within agreed timeframes New measure 100% 100%

Support Services and Infrastructure to Other Agencies RDA (M2)

Scope of Appropriation

This appropriation is limited to the provision of support services to other agencies, including financial, personnel and information technology services and subleasing of surplus accommodation.

Reasons for Change in Appropriation

This appropriation will decrease by $10.180 million to $1.350 million in 2010/11 due to the amalgamation of New Zealand Food Safety Authority with Ministry of Agriculture and Forestry.

Part 2.2 - Non-Departmental Output Expenses

Climate Change Research (M2)

Scope of Appropriation

This appropriation is limited to obtaining science, research, technology, capacity and capability in climate change related to the primary land-based sectors.

Reasons for Change in Appropriation

This appropriation will increase by $500,000 to $8.600 million in 2010/11 due to an expense transfer from 2009/10 to meet contractual commitments for research programmes that span financial years.

Management of Crown Forestry Assets (M35)

Scope of Appropriation

Payments for forest and asset management of Crown forests established on both Crown-Owned and leased Maori land and 13 leases of Crown-Owned land to other parties for forestry purposes.

Reasons for Change in Appropriation

This appropriation will increase by $8.622 million to $98.715 million in 2010/11. This increase is due to changes in forest management plans and harvesting strategies during the year ($9.001 million) offset by transfer of Wairakei Forest operations to Land Information New Zealand (Vote Lands) ($219,000) and operating to capital swap to fund the construction of a bridge over the Oponae Stream for harvesting in Oponae forest in the Eastern Bay of Plenty ($160,000).

Support for Walking Access (M2)

Scope of Appropriation

This appropriation is limited to the operation of the New Zealand Walking Access Commission.

Output Performance Measures and Standards

Output Performance Measures and Standards - Support for Walking Access (M2) - Agriculture and Forestry
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

National walking access strategy

     
The National Walking Access Strategy aims to promote and encourage public access on foot and is being developed in consultation with key stakeholders      
Finalised strategy distributed to national and regional stakeholders by 30 December 2010 New measure Completed Completed

Forums

     
Number of regional forums held during year New measure 4-5 4-5

Walking Access Mapping System

     
Walking Access Mapping System online and operational by 30 January 2011 New measure Completed Completed

Access Opportunities

     
Number of general enquiries received during year New measure 5-25 5-25
Percentage of enquiries for information responded to within 10 working days New measure 100% 100%

Enhanced Access Fund

     
Number of Enhanced Access Fund funding rounds held during year New measure 1 1

Awareness and Education

     
Finalised Outdoor Access Code distributed to all key recreational and landowners groups by 30 September 2010 New measure Completed Completed

Part 3 - Details for Benefits and Other Unrequited Expenses

Part 3.2 - Non-Departmental Benefits and Other Unrequited Expenses

Rural Veterinarians Bonding Scheme (M2)

Scope of Appropriation

This appropriation is limited to the provision of payments to veterinary professionals agreeing to work in understaffed, rural areas, in accordance with government approved criteria and guidelines.

Reasons for Change in Appropriation

This appropriation will decrease by $500,000 to $600,000 in 2010/11 due to lower than expected uptake of the voluntary bonding scheme.

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Adverse Climatic Events (M2)

Scope of Appropriation

This appropriation is limited to providing recovery assistance to the primary sector in the aftermath of adverse climatic events and assistance to rural support trusts.

Reasons for Change in Appropriation

This appropriation will increase by $325,000 to $851,000 in 2010/11. This increase is due to a transfer of funding from departmental output expense Policy Advice MCOA to 'top up' the Adverse Events Contingency fund ($200,000) and an expense transfer from 2009/10 for grants to rural support trusts ($125,000).

Afforestation Grant Scheme (M35)

Scope of Appropriation

This appropriation is limited to Afforestation Grant Scheme grants.

Reasons for Change in Appropriation

This appropriation will decrease by $1.895 million to $5.759 million in 2010/11. Expense transfers are required to align the appropriation across financial years to cover contractual commitments for grants payable upon completion of approved work programmes. Expense transfers of $125,000 from 2009/10 and $2.020 million to 2011/12 were required.

Community Irrigation Fund and Schemes (M2)

Scope of Appropriation

This appropriation is limited to Community Irrigation Fund grants and operating and maintaining Crown irrigation schemes.

Reasons for Change in Appropriation

This appropriation will increase by $469,000 to $2.095 million in 2010/11. The increase is due to the decision to widen the eligibility and assessment criteria of the Community Irrigation Fund and redistribute funding between financial years.

Expected Results

Expected Results - Community Irrigation Fund and Schemes (M2) - Agriculture and Forestry
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Maintain a council adoption rate of 75% for CIF funded water strategies New measure Achieved Achieved
Maintain progression rate of 70% for CIF and investor funded proposals to the detailed engineering stage New measure Achieved Achieved
Maintain progression rate of 75% for CIF funded designs to the building and completion stage New measure Achieved Achieved

East Coast Afforestation Grants (M35)

Scope of Appropriation

This appropriation is limited to grants under the Forestry (East Coast) Grants Regulations 1992.

Reasons for Change in Appropriation

This appropriation will decrease by $786,000 to $3.714 million in 2010/11. The decrease is due to: transfer of funding to 2011/12 to meet the cost of a planting programme by Ngati Porou Forests Ltd deferred until the winter of 2011; a forecast increase in demand for grants following the decision by the Gisborne District Council to bring in a land use rule that requires treatment of severely eroding country; and increasing interest in growing forests for carbon credits.

Global Research Alliance on Agricultural Greenhouse Gases (M2)

Scope of Appropriation

This appropriation is limited to the Global Research Alliance on Agricultural Greenhouse Gases.

Reasons for Change in Appropriation

This appropriation will decrease by $906,000 to $4.094 million in 2010/11. This is due to: a transfer of funding to departmental output expense Policy Advice MCOA for MAF to operate the Global Research Alliance ie, provide the Secretariat function and coordinate New Zealand's input as a member country across agencies and the science sector ($800,000); and an expense transfer to 2011/12 for delays in implementation of this initiative in its first year ($500,000). These changes are offset by the carry forward of funding reprioritised in 2009/10 for the establishment of the Alliance ($360,000) and a funding contribution from the USA ($34,000).

Expected Results

Expected Results - Global Research Alliance on Agricultural Greenhouse Gases (M2) - Agriculture and Forestry
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Host a meeting in New Zealand for agricultural Ministers from all of the 31 Alliance member countries to agree an operating charter by June 2011 New measure Completed Completed
The Minister rates the effectiveness of the Alliance Ministers meeting as a 4 or better on a scale of 1 to 5 (where 1 represents poor and 5 represents excellent) New measure 4 4
The Minister rates progress of the Alliance against agreed objectives as 4 or better on a scale of 1 to 5 where 1 represents poor and 5 represents excellent New measure 4 4

Hill Country Erosion Fund (M2)

Scope of Appropriation

This appropriation is limited to projects that protect erosion-prone hill country.

Reasons for Change in Appropriation

This appropriation will increase by $200,000 to $3.300 million in 2010/11 due to an expense transfer from 2009/10. Expense transfers are required to align the appropriation across financial years to cover contractual commitments for grants payable upon completion of approved work programmes.

Primary Growth Partnership (M2)

Scope of Appropriation

This appropriation is limited to primary, food and forestry sector investment in education and skills development, research and development, product development, commercialisation, market development and technology transfer, in partnership with relevant industry groups, including research related to greenhouse gases via the Centre for Agricultural Greenhouse Gas Research.

Reasons for Change in Appropriation

This appropriation will decrease by $32.204 million to $24.221 million in 2010/11. Expense transfers are required to align the appropriation across financial years to cover contractual commitments for grants payable against approved work programmes and ensure all funding is available for allocation by the Investment Advisory Panel. Expense transfers of $4.100 million from 2009/10 and $36.304 million to 2011/12 were required.

Subscriptions to International Organisations (M2)

Scope of Appropriation

This appropriation is limited to New Zealand's membership of agricultural and forestry related international organisations.

Reasons for Change in Appropriation

This appropriation will decrease by $403,000 to $1.925 million in 2010/11 due to an improvement in exchange rates upon payment of annual contribution to the Food and Agriculture Organisation of United Nations payable in US$ and Euro.

Expected Results

Expected Results - Subscriptions to International Organisations (M2) - Agriculture and Forestry
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Percentage of subscription payments made to international organisations within timeframes to ensure MAF retains membership of international organisations New measure 100% 100%

Sustainable Farming Fund (M2)

Scope of Appropriation

This appropriation is limited to community driven programmes aimed at improving economic and environmental performance.

Reasons for Change in Appropriation

This appropriation will decrease by $224,000 to $8.976 million in 2010/11. Expense transfers are required to align the appropriation across financial years to cover contractual commitments for grants payable upon completion of project milestones. Expense transfers of $626,000 from 2009/10 and $850,000 to 2011/12 were required.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Ministry of Agriculture and Forestry - Capital Expenditure PLA (M2)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Agriculture and Forestry, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Ministry of Agriculture and Forestry Capital Expenditure PLA (M2) - Agriculture and Forestry
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 9,714 286 10,000
Intangibles 25,685 (15,685) 10,000
Other 850 (850) -

Total Appropriation

36,249 (16,249) 20,000

Reasons for Change in Appropriation

Departmental capital expenditure is projected to fall in 2010/11 by $16.249 million to $20 million mainly due to delays in the design and development of: the National Animal Identification Traceability (NAIT) system ($7.020 million); a wine electronic certification system ($950,000); the Joint Border Management System (JBMS) with New Zealand Customs ($4.477 million); and a system for trans-Tasman transfer of x-ray images of checked-in baggage ($2 million). Capital injections for these projects have been transferred from 2010/11 to 2011/12.

Part 6.2 - Non-Departmental Capital Expenditure

Crown Forestry Asset Management (M35)

Scope of Appropriation

This appropriation is limited to forestry operations, management services, research and related forest asset expenditure.

Reasons for Change in Appropriation

This $340,000 appropriation is for the construction of a bridge over the Oponae Stream for harvesting in Oponae forest in the Eastern Bay of Plenty. This was financed from the carry forward of capital funding from 2009/10 ($180,000) and transfer from non-departmental output expense Management of Crown Forestry Assets ($160,000).

Vote Arts, Culture and Heritage

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Arts, Culture and Heritage (M4), Minister of Broadcasting (M8)

ADMINISTERING DEPARTMENT: Ministry for Culture and Heritage

MINISTER RESPONSIBLE FOR MINISTRY FOR CULTURE AND HERITAGE: Minister for Arts, Culture and Heritage

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Arts, Culture and Heritage
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Delivery of Going Digital Programme (M8)

This appropriation is limited to services to support the transition to digital switchover by December 2013.
- 10,330 10,330

Heritage Services (M4)

Management of new memorial projects, national monuments, war and historic graves; administration of legislation and grants; and research, writing and publication of New Zealand history and reference works including the on-line encyclopedia of New Zealand.
7,575 40 7,615

International Cultural Diplomacy (M4)

Management and delivery of an international cultural diplomacy programme through a series of projects and activities primarily focused on Asia, and in particular North Asia.
2,090 (2,090) -

Policy Advice and Monitoring of Funded Agencies (M4)

This appropriation is limited to providing policy advice on arts, culture, heritage and broadcasting issues; monitoring the Crown's interests in sector agencies; and providing negotiated services to the Minister for Arts, Culture and Heritage and the Minister of Broadcasting.
6,129 (718) 5,411

Total Departmental Output Expenses

15,794 7,562 23,356

Non-Departmental Output Expenses

     

Management of Historic Places (M4)

Identification, registration, site recording and associated promotion of the conservation, protection and care of historic places, and purchasing of management services for properties, including maintenance work and provision of access for the public.
13,514 - 13,514

Museum Services (M4)

Collection development, collection management, public programmes and exhibitions, and repatriation of koiwi tangata.
25,594 - 25,594

Performing Arts Services (M4)

Providing opportunities for New Zealand audiences to experience high-quality live symphonic music, ballet and kapa haka performances; supporting the growth of the contemporary music industry; and encouraging participation in and appreciation of these art forms in New Zealand.
20,456 - 20,456

Promotion and Support of the Arts and Film (M4)

Contributing to the development of New Zealand's cultural identity and international profile; supporting access and participation by New Zealanders in the arts; encouraging and recognising innovation and excellence through the support of new work and presentation of New Zealand arts and film to New Zealanders.
19,090 - 19,090

Protection of Taonga Tuturu (M4)

Provision of services by authorised museums under the Protected Objects Act 1975 and conservation of newly found taonga tuturu.
79 100 179

Public Broadcasting Services (M8)

This appropriation is limited to providing funding for New Zealand television and radio programmes, music, archiving, broadcasting and transmission coverage; maintenance of codes and determination of complaints on broadcasting standards; and funding a national Pacific radio network and international radio and television services to the Pacific.
161,820 (10,128) 151,692

Total Non-Departmental Output Expenses

240,553 (10,028) 230,525

Non-Departmental Other Expenses

     

Commonwealth War Graves (M4)

This appropriation is limited to contributing to the Commonwealth War Graves Commission New Zealand's agreed contribution to the costs of its work in caring for the graves of the war dead.
3,243 (569) 2,674

Contribution to a Fund for Canterbury Heritage Buildings (M4)

This appropriation is limited to the payment of matched donations to a fund for the repair, restoration and strengthening of heritage buildings damaged during the Canterbury earthquake.
- 10,000 10,000

Development and Maintenance of War Graves, Historic Graves and Monuments (M4)

This appropriation is limited to development and maintenance of war graves, historic graves and monuments in New Zealand and overseas.
527 - 527

Preservation and Display of Taonga Pukaki (M4)

This appropriation is limited to the preservation and display of the taonga Pukaki.
100 - 100

Regional Museums (M4)

This appropriation is limited to providing contributions to capital construction projects at Regional Museums.
6,667 - 6,667

Treaty of Waitangi Commemorations (M4)

This appropriation is limited to providing grants towards Treaty of Waitangi commemorations held at Waitangi and within communities elsewhere in New Zealand.
288 - 288

Total Non-Departmental Other Expenses

10,825 9,431 20,256

Departmental Capital Expenditure

     

Ministry for Culture and Heritage - Capital Expenditure PLA (M4)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry for Culture and Heritage, as authorised by section 24(1) of the Public Finance Act 1989.
415 315 730

Total Departmental Capital Expenditure

415 315 730

Non-Departmental Capital Expenditure

     

Museum of New Zealand Te Papa Tongarewa (M4)

Capital expenditure for museum operations, exhibition research and development, and acquisition of collection items.
9,000 - 9,000

New Zealand Memorial Park (M4)

Capital expenditure for the establishment of a New Zealand Memorial Park in Wellington.
- 450 450

Total Non-Departmental Capital Expenditure

9,000 450 9,450

Total Annual and Permanent Appropriations

276,587 7,730 284,317

Details of Multi-Year Appropriations

Multi-Year Appropriations - Arts, Culture and Heritage
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Departmental Output Expenses

   

Cultural Diplomacy International Programme (M4)

This appropriation is limited to management and delivery of an international cultural diplomacy programme through a series of projects and activities primarily focused on Asia and in locations where New Zealand is pursuing free trade agreements.

Commences: 1 July 2010

Expires: 30 June 2015

Original Appropriation 9,740
Adjustments for 2009/10 -
Adjustments to 2010/11 -
Adjusted Appropriation 9,740
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 3,567
Estimated Actual for 2011/12 1,689
Estimated Appropriation Remaining 4,484

Non-Departmental Other Expenses

   

New Zealand Screen Production Incentive Fund (M4)

This appropriation is limited to grant payments for eligible producers of New Zealand feature film, television or other format screen productions that meet the qualifying tests as set by the New Zealand Film Commission, and co-investment by the New Zealand Film Commission in such productions.

Commences: 1 July 2008

Expires: 30 June 2013

Original Appropriation 68,500
Adjustments for 2009/10 -
Adjustments to 2010/11 -
Adjusted Appropriation 68,500
Actual to 2009/10 Year End 14,530
Estimated Actual for 2010/11 18,893
Estimated Actual for 2011/12 17,538
Estimated Appropriation Remaining 17,539

Details of Projected Movements in Departmental
Net Assets

Ministry for Culture and Heritage

Ministry for Culture and Heritage - Details of Projected Movements in Departmental Net Assets - Arts, Culture and Heritage
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 1,132 1,132 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections - 315 An operating to capital appropriation swap was approved (from the Departmental Output Expense - Delivery of Digital Switchover Programme) to fund vehicle purchases required to support the Going Digital project.
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

1,132 1,447  

Information Supporting the Supplementary Estimates Vote Arts, Culture and Heritage

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Arts, Culture and Heritage (M4), Minister of Broadcasting (M8)

ADMINISTERING DEPARTMENT: Ministry for Culture and Heritage

MINISTER RESPONSIBLE FOR MINISTRY FOR CULTURE AND HERITAGE: Minister for Arts, Culture and Heritage

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Arts, Culture and Heritage
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 256,347 11,129 (10,028) 1,101 257,448
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 29,356 - 9,793 9,793 39,149
Capital Expenditure 9,415 315 450 765 10,180
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

295,118 11,444 215 11,659 306,777

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A 7 7 7
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A 7 7 7

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Cultural Diplomacy International Programme (M4)

Scope of Appropriation and Expenses

Multi-Year Appropriations - Arts, Culture and Heritage
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Departmental Output Expenses

   

Cultural Diplomacy International Programme (M4)

This appropriation is limited to management and delivery of an international cultural diplomacy programme through a series of projects and activities primarily focused on Asia and in locations where New Zealand is pursuing free trade agreements.

Commences: 1 July 2010

Expires: 30 June 2015

Original Appropriation 9,740
Adjustments for 2009/10 -
Adjustments to 2010/11 -
Adjusted Appropriation 9,740
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 3,567
Estimated Actual for 2011/12 1,689
Estimated Appropriation Remaining 4,484

Revenue

Revenue - Cultural Diplomacy International Programme (M4) - Arts, Culture and Heritage
  Budget
$000
Revenue from the Crown to end of 2011/12 5,256
Revenue from Others to end of 2011/12 -
Total Revenue 5,256

Reasons for Change in Appropriation

The International Cultural Diplomacy appropriation was renamed Cultural Diplomacy International Programme, and changed from an annual to a multi-year appropriation starting 1 July 2010. This technical change was fiscally neutral.

Output Performance Measures and Standards

Output Performance Measures and Standards - Cultural Diplomacy International Programme (M4) - Arts, Culture and Heritage
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Projects completed N/A N/A 90% on time and 100%within budget

Conditions on Use of Appropriation

Conditions on Use of Appropriation - Cultural Diplomacy International Programme (M4) - Arts, Culture and Heritage
Reference Conditions
Cabinet decision Strategic - focused on priority countries or regions, using a multi-year, sustained approach
Targeted at key sectors of the population or key events in the region
Planned well in advance, possibly with two to three years lead-time
Suited to advancing New Zealand's diplomatic and trade interests

Delivery of Going Digital Programme (M8)

Scope of Appropriation

This appropriation is limited to services to support the transition to digital switchover by December 2013.

Expenses and Revenue

Expenses and Revenue - Delivery of Going Digital Programme (M8) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 10,330 10,330
Revenue from Crown - 10,330 10,330
Revenue from Other - - -

Reasons for Change in Appropriation

A new appropriation was established during 2010/11 to fund the Going Digital project. The appropriation was provided to fund an information campaign, community outreach activity, programme office management, DTT extension and a regional content broadcaster (if required).

Output Performance Measures and Standards

Output Performance Measures and Standards - Delivery of Going Digital Programme (M8) - Arts, Culture and Heritage
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Prompted awareness of digital switchover N/A Increases each quarter Increases each quarter
Percentage of households that have converted to digital television N/A Increases each quarter Increases each quarter
Number of community contacts made N/A 2,160 2,160
DTT extension will be complete N/A 100% 100%

Heritage Services (M4)

Scope of Appropriation

Management of new memorial projects, national monuments, war and historic graves; administration of legislation and grants; and research, writing and publication of New Zealand history and reference works including the on-line encyclopedia of New Zealand.

Expenses and Revenue

Expenses and Revenue - Heritage Services (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 7,575 40 7,615
Revenue from Crown 7,459 (77) 7,382
Revenue from Other 116 117 233

Reasons for Change in Appropriation

This appropriation increased as a result of overheads being adjusted to reflect the expected incurrence of the costs of producing these outputs, and to a lesser extent expense transfers, adjustment of revenue dependent activities, and Vote re-prioritisation.

International Cultural Diplomacy (M4)

Scope of Appropriation

Management and delivery of an international cultural diplomacy programme through a series of projects and activities primarily focused on Asia, and in particular North Asia.

Expenses and Revenue

Expenses and Revenue - International Cultural Diplomacy (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 2,090 (2,090) -
Revenue from Crown 2,089 (2,089) -
Revenue from Other 1 (1) -

Reasons for Change in Appropriation

The International Cultural Diplomacy appropriation was renamed Cultural Diplomacy International Programme, and changed from an annual to a multi-year appropriation starting 1 July 2010. This technical change was fiscally neutral.

Output Performance Measures and Standards

Output Performance Measures and Standards - International Cultural Diplomacy (M4) - Arts, Culture and Heritage
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Projects completed 90% on time and 100%within budget N/A N/A

Policy Advice and Monitoring of Funded Agencies (M4)

Scope of Appropriation

This appropriation is limited to providing policy advice on arts, culture, heritage and broadcasting issues; monitoring the Crown's interests in sector agencies; and providing negotiated services to the Minister for Arts, Culture and Heritage and the Minister of Broadcasting.

Expenses and Revenue

Expenses and Revenue - Policy Advice and Monitoring of Funded Agencies (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 6,129 (718) 5,411
Revenue from Crown 6,030 (728) 5,302
Revenue from Other 99 10 109

Reasons for Change in Appropriation

This appropriation decreased as a result of Vote re-prioritisation which included the fiscally neutral transfer of Going Digital funding from the Policy Advice and Monitoring of Funded Agencies appropriation to the new Departmental Output Expense - Delivery of Digital Switchover Programme. Contributing to a lesser extent were overheads being adjusted to reflect the expected incurrence of the costs of producing these outputs, expense transfers, and the adjustment of revenue dependent activities.

Part 2.2 - Non-Departmental Output Expenses

Protection of Taonga Tuturu (M4)

Scope of Appropriation

Provision of services by authorised museums under the Protected Objects Act 1975 and conservation of newly found taonga tuturu.

Expenses

Expenses - Protection of Taonga Tuturu (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 79 100 179

Reasons for Change in Appropriation

Funding of $100,000 was re-prioritised within the Vote to fund increased cost for conservation services. As these services are legislatively required and demand driven, volumes are difficult to anticipate in advance and the ability to reduce or defer expenditure is limited.

Public Broadcasting Services (M8)

Scope of Appropriation

This appropriation is limited to providing funding for New Zealand television and radio programmes, music, archiving, broadcasting and transmission coverage; maintenance of codes and determination of complaints on broadcasting standards; and funding a national Pacific radio network and international radio and television services to the Pacific.

Expenses

Expenses - Public Broadcasting Services (M8) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 161,820 (10,128) 151,692

Reasons for Change in Appropriation

The appropriation decreased by $10.128 million in 2010/11 because of two expense transfers.

Firstly, In 2007 $25 million was allocated to Freeview for Digital television platform funding. Costs were expected to amount to $5 million per year over five years; however, in the first two years the full $5 million allocated was not required. Funding was transferred as far as possible into outyears. In 2010/11 the remaining $4.628 million of additional funding was transferred into 2011/12 to allow support for the Freeview platform to continue during the period of digital switchover.

Secondly, In April 2010 the government agreed to TVNZ's proposal to commercialise one of two advertising-free digital channels that were being directly funded through the Ministry for Culture and Heritage. Funding had been appropriated for the two channels TVNZ 6 and 7 until 30 June 2012. With the commercialisation of 6, the remaining balance of the funding has been applied to TVNZ 7 only, and the payment schedule for the period 1 March 2011 - 30 June 2012 was revised accordingly resulting in $5.500 million being transferred from 2010/11 into 2011/12.

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 5.2 NonDepartmental Other Expenses - Arts, Culture and Heritage
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: Increasing preservation of New Zealand's culture, heritage and traditions.
Impact: National symbols, cultural objects and intellectual heritage are protected and retained; increased awareness and use of heritage memorial sites.
Contribution to a Fund for Canterbury Heritage Buildings

Commonwealth War Graves (M4)

Scope of Appropriation

This appropriation is limited to contributing to the Commonwealth War Graves Commission New Zealand's agreed contribution to the costs of its work in caring for the graves of the war dead.

Expenses

Expenses - Commonwealth War Graves (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 3,243 (569) 2,674

Reasons for Change in Appropriation

Due to a favourable foreign exchange movement, the full appropriation was not required during 2010/11. The Commonwealth War Graves appropriation funding was re-prioritised to partially fund the establishment of a World War One commemorations office to co-ordinate New Zealand's WW1 commemorations over the next 5 years (funded via the Departmental Output Expense - Heritage Services). This required the surplus funding to be not only transferred between appropriations but also transferred from 2010/11 into 2011/12.

Contribution to a Fund for Canterbury Heritage Buildings (M4)

Scope of Appropriation

This appropriation is limited to the payment of matched donations to a fund for the repair, restoration and strengthening of heritage buildings damaged during the Canterbury earthquake.

Expenses

Expenses - Contribution to a Fund for Canterbury Heritage Buildings (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 0 10,000 10,000

Reasons for Change in Appropriation

Following the Canterbury earthquake in September 2010 the government agreed to match funding from donations for the repair, restoration and strengthening of earthquake damaged heritage buildings up to a maximum of $10 million. As a result this new one-off appropriation was established during 2010/11.

New Zealand Screen Production Incentive Fund (M4)

Scope of Appropriation and Expenses

Multi-Year Appropriations - Arts, Culture and Heritage
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Non-Departmental Other Expenses

   

New Zealand Screen Production Incentive Fund (M4)

This appropriation is limited to grant payments for eligible producers of New Zealand feature film, television or other format screen productions that meet the qualifying tests as set by the New Zealand Film Commission, and co-investment by the New Zealand Film Commission in such productions.

Commences: 1 July 2008

Expires: 30 June 2013

Original Appropriation 68,500
Adjustments for 2009/10 -
Adjustments to 2010/11 -
Adjusted Appropriation 68,500
Actual to 2009/10 Year End 14,530
Estimated Actual for 2010/11 18,893
Estimated Actual for 2011/12 17,538
Estimated Appropriation Remaining 17,539

Reasons for Change in Appropriation

This multi-year appropriation was adjusted during 2010/11 to reflect the latest forecasts from the New Zealand Film Commission.

Reporting Mechanisms

Reporting Mechanisms - Reporting Mechanisms - Arts, Culture and Heritage
Appropriation Reporting Mechanism
Commonwealth War Graves Annual report of the Ministry for Culture and Heritage
Commonwealth War Graves Commission annual report and corporate plan
Contribution to a Fund for Canterbury Heritage Buildings Annual report of the Ministry for Culture and Heritage
New Zealand Screen Production Incentive Fund Annual report of the Ministry for Culture and Heritage
Annual report of the New Zealand Film Commission

The above table indicates the mechanisms to be used for reporting actual performance for each non-departmental other expenses appropriation.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Ministry for Culture and Heritage - Capital Expenditure PLA (M4)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry for Culture and Heritage, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Ministry for Culture and Heritage Capital Expenditure PLA (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 390 - 390
Intangibles 25 15 40
Other - 300 300

Total Appropriation

415 315 730

Reasons for Change in Appropriation

A fiscally neutral operating to capital funding swap of $315,000 was approved during 2010/11 to purchase vehicles and some minor office equipment for the new Digital Switchover project.

Part 6.2 - Non-Departmental Capital Expenditure

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 6.2 NonDepartmental Capital Expenditure - Arts, Culture and Heritage
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: Increasing preservation of New Zealand's culture, heritage and traditions. New Zealand Memorial Park

New Zealand Memorial Park (M4)

Scope of Appropriation

Capital expenditure for the establishment of a New Zealand Memorial Park in Wellington.

Capital Expenditure

Capital Expenditure - New Zealand Memorial Park (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 450 450

Reasons for Change in Appropriation

$450,000 of the total $10 million Memorial Park appropriation was brought forward from 2013/14 into 2010/11 to allow interim landscape work to be completed.

Expected Results

Expected Results - New Zealand Memorial Park (M4) - Arts, Culture and Heritage
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Complete interim landscaping N/A 100% 100%

Reporting Mechanisms

Reporting Mechanisms - Reporting Mechanisms - Arts, Culture and Heritage
Appropriation Reporting Mechanism
New Zealand Memorial Park Annual report of the Ministry for Culture and Heritage

The above table indicates the mechanisms to be used for reporting actual results for each non-departmental capital expenditure appropriation.

Vote Attorney-General

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Attorney-General (M5)

ADMINISTERING DEPARTMENT: Crown Law Office

MINISTER RESPONSIBLE FOR CROWN LAW OFFICE: Attorney-General

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Attorney-General
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Conduct of Criminal Appeals (M5)

Conducting appeals arising from criminal trials on indictment and from Crown appeals against sentence.
3,329 - 3,329

Legal Advice and Representation (M5)

Providing legal advice and representation services to central government departments and Crown agencies.
22,900 - 22,900

Supervision and Conduct of Crown Prosecutions (M5)

The provision of a national Crown prosecution service that undertakes criminal trials on indictment and appeals to the High Court; the supervision of the network of Crown Solicitors who deliver the prosecution service; and the provision of advice on criminal law matters to other government agencies and Crown Solicitors.
36,742 10,699 47,441

The Exercise of Principal Law Officer Functions (M5)

Providing legal advice, representation services and administrative services to the Attorney-General and Solicitor-General to assist them in the exercise of their Principal Law Officer functions; and the provision of legal and constitutional advice to the Government, Ministers, and the judiciary.
2,948 24 2,972

Total Departmental Output Expenses

65,919 10,723 76,642

Departmental Capital Expenditure

     

Crown Law Office - Capital Expenditure PLA (M5)

This appropriation is limited to the purchase or development of assets by and for the use of the Crown Law Office, as authorised by section 24(1) of the Public Finance Act 1989.
891 (477) 414

Total Departmental Capital Expenditure

891 (477) 414

Total Annual and Permanent Appropriations

66,810 10,246 77,056

Details of Projected Movements in Departmental
Net Assets

Crown Law Office

Crown Law Office - Details of Projected Movements in Departmental Net Assets - Attorney-General
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 2,979 1,530 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections - 3,227 To restore taxpayers funds to an appropriate level. The net loss of $3.227 million for 2009/10 financial year was written off against tax payer funds.
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) (916) - Forecast increase in revenue Department.
Other Movements - -  

Closing Balance

2,063 4,757  

Information Supporting the Supplementary Estimates Vote Attorney-General

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Attorney-General (M5)

ADMINISTERING DEPARTMENT: Crown Law Office

MINISTER RESPONSIBLE FOR CROWN LAW OFFICE: Attorney-General

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Attorney-General
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 65,919 10,723 - 10,723 76,642
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses - - - - -
Capital Expenditure 891 (477) - (477) 414
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

66,810 10,246 - 10,246 77,056

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Conduct of Criminal Appeals (M5)

Scope of Appropriation

Conducting appeals arising from criminal trials on indictment and from Crown appeals against sentence.

Output Performance Measures and Standards

Output Performance Measures and Standards - Conduct of Criminal Appeals (M5) - Attorney-General
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
The success rate of Crown appeals N/A 60%
(see Note 1)
60%
(see Note 1)
Key stakeholders are kept informed of significant legal impacts of judgements received N/A 100% 100%

Note 1 - Some appeals may be taken to clarify points of law.

Legal Advice and Representation (M5)

Scope of Appropriation

Providing legal advice and representation services to central government departments and Crown agencies.

Output Performance Measures and Standards

Output Performance Measures and Standards - Legal Advice and Representation (M5) - Attorney-General
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Percentage of written opinion/advice are peer reviewed in accordance with professional standards N/A 90% 90%
Percentage of litigation management plans are completed for litigation matters in accordance with professional standards N/A 90% 90%
Percentage of responses from government lawyers surveyed about Crown Law legal seminars and conferences that rate as "meets expectation" or better N/A 100% 100%
All advice and litigation matters are completed within appropriate timeframes or justified reason is recorded N/A 100% 100%

Supervision and Conduct of Crown Prosecutions (M5)

Scope of Appropriation

The provision of a national Crown prosecution service that undertakes criminal trials on indictment and appeals to the High Court; the supervision of the network of Crown Solicitors who deliver the prosecution service; and the provision of advice on criminal law matters to other government agencies and Crown Solicitors.

Expenses and Revenue

Expenses and Revenue - Supervision and Conduct of Crown Prosecutions (M5) - Attorney-General
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 36,742 10,699 47,441
Revenue from Crown 36,742 10,699 47,441
Revenue from Other - - -

Reasons for Change in Appropriation

This appropriation will increase by $10.699 million to $47.441 million for 2010/11. The increase relates to:

  • increased demand and associated costs for the supervision and conduct of Crown prosecutions ($10.675 million)
  • increase in GSF employer rates ($24,000).

The Exercise of Principal Law Officer Functions (M5)

Scope of Appropriation

Providing legal advice, representation services and administrative services to the Attorney-General and Solicitor-General to assist them in the exercise of their Principal Law Officer functions; and the provision of legal and constitutional advice to the Government, Ministers, and the judiciary.

Expenses and Revenue

Expenses and Revenue - The Exercise of Principal Law Officer Functions (M5) - Attorney-General
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 2,948 24 2,972
Revenue from Crown 2,928 24 2,952
Revenue from Other 20 - 20

Reasons for Change in Appropriation

This appropriation will increase by $24,000 to $2.972 million for 2010/11. The increase relates to the increase in GSF employer rates.

Output Performance Measures and Standards

Output Performance Measures and Standards - The Exercise of Principal Law Officer Functions (M5) - Attorney-General
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Weekly written briefings are provided to the Attorney-General regarding significant legal matters affecting the Crown N/A 100% 100%
Percentage of written opinion/advice are peer reviewed in accordance with professional standards N/A 90% 90%

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Crown Law Office - Capital Expenditure PLA (M5)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Crown Law Office, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Crown Law Office Capital Expenditure PLA (M5) - Attorney-General
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 631 (381) 250
Intangibles 260 (96) 164
Other - - -

Total Appropriation

891 (477) 414

Reasons for Change in Appropriation

The reduction in capital expenditure in 2010/11 relates to the rescheduling of projects to 2011/12.

Vote Audit

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Speaker of the House of Representatives (M78)

ADMINISTERING DEPARTMENT: Controller and Auditor-General

MINISTER RESPONSIBLE FOR CONTROLLER AND AUDITOR-GENERAL: Speaker of the House of Representatives

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Audit
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Audit and Assurance Services RDA (M78)

This appropriation is limited to the performance of audit and related assurance services as required or authorised by statute. The Auditor-General is required to audit the financial statements of the Government, public entities' financial statements and other information that must be audited. The Auditor-General is also enabled to perform other services reasonable and appropriate for an auditor to perform and to audit other quasi-public entities.
61,705 3,092 64,797

Audit and Assurance Services (M78)

This appropriation is limited to the performance of audit and related assurance services as required or authorised by statute for smaller entities such as cemetery trusts and reserve boards.
150 - 150

Statutory Auditor Function MCOA (M78)

9,047 - 9,047
Performance Audits and Inquiries
This output class is limited to undertaking and reporting on performance audits and inquiries relating to public entities under the Public Audit Act 2001 and responding to requests for approvals in relation to pecuniary interest questions regulated by the Local Authorities Members' Interests Act 1968.
6,587 - 6,587
Supporting Accountability to Parliament
This output class is limited to reporting to Parliament and others as appropriate on matters arising from annual and appropriation audits, reporting to and advising select committees, and advising other agencies on the requirements of parliamentary and related accountability systems, to support Parliament in its holding the executive to account for its use of public resources.
2,460 - 2,460

Total Departmental Output Expenses

70,902 3,092 73,994

Departmental Other Expenses

     

Remuneration of Auditor-General and Deputy Auditor-General PLA (M78)

This appropriation is limited to remuneration expenses for both the Auditor-General and the Deputy Auditor-General as authorised by clause 5 of the Third Schedule of the Public Audit Act 2001.
751 52 803

Total Departmental Other Expenses

751 52 803

Departmental Capital Expenditure

     

Controller and Auditor-General - Capital Expenditure PLA (M78)

This appropriation is limited to the purchase or development of assets by and for the use of the Controller and Auditor-General, as authorised by section 24(1) of the Public Finance Act 1989.
1,552 (507) 1,045

Total Departmental Capital Expenditure

1,552 (507) 1,045

Total Annual and Permanent Appropriations

73,205 2,637 75,842

Details of Projected Movements in Departmental
Net Assets

Controller and Auditor-General

Controller and Auditor-General - Details of Projected Movements in Departmental Net Assets - Audit
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 3,521 3,521 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections 500 500  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

4,021 4,021  

Information Supporting the Supplementary Estimates Vote Audit

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Speaker of the House of Representatives (M78)

ADMINISTERING DEPARTMENT: Controller and Auditor-General

MINISTER RESPONSIBLE FOR CONTROLLER AND AUDITOR-GENERAL: Speaker of the House of Representatives

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Audit
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 70,902 3,092 - 3,092 73,994
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 751 52 - 52 803
Capital Expenditure 1,552 (507) - (507) 1,045
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

73,205 2,637 - 2,637 75,842

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Audit and Assurance Services RDA (M78)

Scope of Appropriation

This appropriation is limited to the performance of audit and related assurance services as required or authorised by statute. The Auditor-General is required to audit the financial statements of the Government, public entities' financial statements and other information that must be audited. The Auditor-General is also enabled to perform other services reasonable and appropriate for an auditor to perform and to audit other quasi-public entities.

Expenses and Revenue

Expenses and Revenue - Audit and Assurance Services RDA (M78) - Audit
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 61,705 3,092 64,797
Revenue from Crown - - -
Revenue from Other 61,705 3,092 64,797

Reasons for Change in Appropriation

The increase in output expenses relates to additional work arising from the transition audits relating to the merger of Auckland Councils, the inclusion of Treasury's 2011 Departmental Internal Control Evaluation (not previously budgeted) and updated forecasts as audit fees are finalised and the flow of work across financial years crystallises.

Part 5 - Details and Expected Results for Other Expenses

Part 5.1 - Departmental Other Expenses

Remuneration of Auditor-General and Deputy Auditor-General PLA (M78)

Scope of Appropriation

This appropriation is limited to remuneration expenses for both the Auditor-General and the Deputy Auditor-General as authorised by clause 5 of the Third Schedule of the Public Audit Act 2001.

Expenses

Expenses - Remuneration of AuditorGeneral and Deputy AuditorGeneral PLA (M78) - Audit
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 751 52 803

Reasons for Change in Appropriation

The appropriation has increased to reflect the actual remuneration expenses incurred following the 2010 remuneration determinations.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Controller and Auditor-General - Capital Expenditure PLA (M78)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Controller and Auditor-General, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Controller and AuditorGeneral Capital Expenditure PLA (M78) - Audit
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 693 (210) 483
Intangibles 350 (222) 128
Other 509 (75) 434

Total Appropriation

1,552 (507) 1,045

Reasons for Change in Appropriation

The changes in appropriation reflect revised timing of purchases of equipment, vehicles and software across financial years.

Vote Biosecurity

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Biosecurity (M7)

ADMINISTERING DEPARTMENT: Ministry of Agriculture and Forestry

MINISTER RESPONSIBLE FOR MINISTRY OF AGRICULTURE AND FORESTRY: Minister of Agriculture

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Biosecurity
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Biosecurity Policy Advice (M7)

This appropriation is limited to policy advice and analysis on biosecurity, and ministerial servicing.
11,411 (314) 11,097

Border Biosecurity Risk Management MCOA (M7)

89,842 (7,227) 82,615
Border Biosecurity Monitoring and Clearance
This output class is limited to biosecurity monitoring and clearance programmes that manage the biosecurity risk associated with international trade and travel.
75,095 (9,018) 66,077
Border Biosecurity Systems Development and Maintenance
This output class is limited to the development and maintenance of standards and systems that manage biosecurity risk associated with imports and exports.
14,747 1,791 16,538

Domestic Biosecurity Risk Management MCOA (M7)

54,362 4,997 59,359
Biosecurity Incursion Response and Long Term Pest Management
This output class is limited to the assessment, containment and possible eradication of suspected risk organisms within New Zealand.
12,495 3,844 16,339
Domestic Biosecurity Surveillance
This output class is limited to domestic biosecurity surveillance activities.
41,867 1,153 43,020

Total Departmental Output Expenses

155,615 (2,544) 153,071

Non-Departmental Output Expenses

     

Control of TB Vectors (M7)

This appropriation is limited to the Crown's contribution to the implementation of the Bovine Tuberculosis National Pest Management Strategy.
30,505 (1,240) 29,265

Total Non-Departmental Output Expenses

30,505 (1,240) 29,265

Non-Departmental Other Expenses

     

Response to the Kiwifruit disease Pseudomonas syringae pv. actinidiae (M7)

This appropriation is limited to supporting an industry-led programme for the kiwifruit disease Pseudomonas syringae pv. actinidiae.
- 17,500 17,500

Subscriptions to International Organisations (M7)

This appropriation is limited to New Zealand's membership of biosecurity related international organisations.
330 - 330

Total Non-Departmental Other Expenses

330 17,500 17,830

Total Annual and Permanent Appropriations

186,450 13,716 200,166

Information Supporting the Supplementary Estimates Vote Biosecurity

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Biosecurity (M7)

ADMINISTERING DEPARTMENT: Ministry of Agriculture and Forestry

MINISTER RESPONSIBLE FOR MINISTRY OF AGRICULTURE AND FORESTRY: Minister of Agriculture

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Biosecurity
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 186,120 (2,544) (1,240) (3,784) 182,336
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 330 - 17,500 17,500 17,830
Capital Expenditure - - - - -
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

186,450 (2,544) 16,260 13,716 200,166

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 850 N/A 745 745 1,595
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

850 N/A 745 745 1,595

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Biosecurity Policy Advice (M7)

Scope of Appropriation

This appropriation is limited to policy advice and analysis on biosecurity, and ministerial servicing.

Expenses and Revenue

Expenses and Revenue - Biosecurity Policy Advice (M7) - Biosecurity
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 11,411 (314) 11,097
Revenue from Crown 11,074 (98) 10,976
Revenue from Other 337 (216) 121

Reasons for Change in Appropriation

This appropriation will decrease by $314,000 to $11.097 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($377,000); a decrease in third party funded activity ($147,000); and reduced services to other public sector agencies ($69,000). These changes are offset by: an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($29,000); and an expense transfer from 2009/10 to meet cost of amalgamation of New Zealand Food Safety Authority ($250,000).

Output Performance Measures and Standards

Output Performance Measures and Standards - Biosecurity Policy Advice (M7) - Biosecurity
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Development and provision of biosecurity-related policy advice

     
It is important to receive an independent assessment of the quality of MAF policy advice and MAF will submit a sample of work to the New Zealand Institute of Economic Research (NZIER) for review at least once a year.      
NZIER's mean rating of MAF policy advice on a scale of 1 to 10 New Measure 7 7
The Cabinet Office measures the timeliness and 'structural quality' (length and presence of summaries) of all papers that are submitted to Cabinet or Cabinet Committees. They provide agencies with analysis of how their performance compares to overall averages.      
Percentage of MAF Cabinet papers deemed to meet Cabinet Office report back deadlines. New Measure 95% 95%
The Cabinet Office manual stipulates that "an executive summary must be provided if a paper is more than 4 pages long, or the paper is particularly complex".      
Percentage of MAF cabinet papers that include executive summaries when required. New Measure 100% 100%
The Government requires that regulatory proposals are subject to impact analysis to ensure any proposed regulation is in the public interest. MAF therefore needs to ensure its regulatory advice meets standards of best practice and demonstrates this in the development of regulatory impact statements. Only significant Regulatory Impact Statements are assessed by Treasury.      
Percentage of MAF Regulatory Impact Statements assessed by Treasury that meet the regulatory assessment requirements. New Measure 100% 100%
Complaints about the quality of MAF regulations can be made to the Parliamentary Regulations Review Committee (PRRC) which can, if substantiated, make recommendations to the House under standing orders for changes to MAF's regulations.      
Percentage of MAF regulations which the PRRC considers follows good practice and that are not brought to the attention of the House in accordance with Standing Orders. New Measure 100% 100%

Border Biosecurity Risk Management MCOA (M7)

Scope of Appropriation

Border Biosecurity Monitoring and Clearance
This output class is limited to biosecurity monitoring and clearance programmes that manage the biosecurity risk associated with international trade and travel.
Border Biosecurity Systems Development and Maintenance
This output class is limited to the development and maintenance of standards and systems that manage biosecurity risk associated with imports and exports.

Explanation for Use of Multi-Class Output Expense Appropriation

This multi-class output appropriation contains output classes that contribute to preventing harmful organisms from crossing New Zealand's borders, with the assurance that trade and tourism are maintained.

Expenses and Revenue

Expenses and Revenue - Border Biosecurity Risk Management MCOA (M7) - Biosecurity
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Total Appropriation

89,842 (7,227) 82,615
Border Biosecurity Monitoring and Clearance 75,095 (9,018) 66,077
Border Biosecurity Systems Development and Maintenance 14,747 1,791 16,538

Revenue from Crown

57,860 (5,535) 52,325
Border Biosecurity Monitoring and Clearance 46,589 (4,749) 41,840
Border Biosecurity Systems Development and Maintenance 11,271 (786) 10,485

Revenue from Other

31,982 (824) 31,158
Border Biosecurity Monitoring and Clearance 28,506 (5,193) 23,313
Border Biosecurity Systems Development and Maintenance 3,476 4,369 7,845

Reasons for Change in Appropriation

This appropriation will decrease by $7.227 million to $82.615 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($5.629 million); a decrease in third party funded activity ($1 million); and reduced services to other public sector agencies ($692,000). These changes are offset by an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($94,000).

Output Performance Measures and Standards

Output Performance Measures and Standards - Border Biosecurity Risk Management MCOA (M7) - Biosecurity
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Border Biosecurity Systems Development and Maintenance

     

Import Systems Development and Maintenance

     
A Standard is developed by government in consultation with stakeholders. It articulates a list of requirements that must be met and procedures that must be carried out for particular types of goods to enter New Zealand. Certain standards can be classified as 'high importance' if the risks addressed pose a greater threat than others to New Zealand's biosecurity.      
The number of incursions of notifiable pests that occurred because of an inaccurate or unclear standard. New measure 0 0
A new standard format has been introduced to ensure standards are more easily understood by importers and other stakeholders.      
15% of the current 350 standards are completed in the new format and in accordance with the Border Systems Manual by July 2011. New measure Complete Complete

Export Systems Development and Maintenance

     
MAF is responsible for ensuring exported New Zealand goods do not contain potential biosecurity risks. If a biosecurity risk found in another country is proved to have come from goods imported from New Zealand then all future goods of that type from New Zealand could be blocked or 'closed'.      
Number of market closures due to assurance systems failures. New measure 0 0
Ensuring all New Zealand Export Certificates meet the importing country's requirements is vital to ensuring New Zealand exporters maintain or extend their market access.      
Percentage of export certificates meeting importing country requirements. New measure 95-100% 95-100%

Border Biosecurity Monitoring and Clearance

     

Profiling and Intelligence

     
MAF will maintain an effective Biosecurity system that prevents the introduction and establishment of serious notifiable organisms that can be managed.      
Number of incursions of notifiable organisms through pathways that can be managed. New measure 0 0

Passenger and aircraft clearance

     
Percentage of MAF end user survey respondents rating satisfaction with MAF's quality of service when crossing border as 4 or better on a scale of 1 to 5 (where 1 represents poor and 5 represents excellent). New measure 75-85% 75-85%
Percentage of passengers that comply with biosecurity requirements across New Zealand airports. New measure 98.5-100% 98.5-100%

Vessels and Goods Clearance

     
Number of sea vessels arriving in New Zealand. New measure 6,500-7,000 6,500-7,000
Number of sea vessels inspected by MAF. New measure 2,700-2,900 2,700-2,900
Number of Containers (loaded and empty) entering New Zealand. New measure 550,000-600,000 550,000-600,000
Number of cargo consignments (via air and sea) imported in to New Zealand which are of interest to MAF. New measure 80,000-120,000 80,000-120,000
Number of cargo consignments inspected by MAF. New measure 50,000-60,000 50,000-60,000
Goods entering New Zealand require a Biosecurity Authority Clearance Certificate (BACC) to obtain biosecurity clearance. BACCs are also used to direct goods for additional inspection, treatment or other measures required of the importer.      
Number of BACC applications received by MAF. New measure 180,000-200,000 180,000-200,000
Import companies are surveyed annually to determine if they are satisfied with the level of service being provided by MAF.      
Percentage rating satisfaction with overall service as 4 or better on a scale where 1 represents poor performance and 5 represents excellent performance. New measure 70-75% 70-75%

Mail Clearance

     
Number of mail items processed. New measure 38,000,000-41,000,000 38,000,000-41,000,000
Number of mail items inspected. New measure 80,000-90,000 80,000-90,000
Percentage of AO and Parcel class mail items through the Auckland International Mail Centre that comply with biosecurity requirements. New measure 96-98% 96-98%
Mail and courier companies are surveyed annually to determine if they are satisfied with the level of service being provided by MAF.      
Percentage of mail and courier companies satisfied with level of service provided by MAF. New measure 75-85% 75-85%

Facilities Approvals and Assurance

     
Percentage of scheduled facility assessments against required standard completed. New measure 90-100% 90-100%
Percentage of facility inspections resulting in a 'pass'. New measure 70-80% 70-80%
Facility operators are surveyed annually to judge whether their interactions with MAF have been satisfactory.      
Percentage rating satisfaction with overall service as 4 or better on a scale of 1 to 5 where 1 represents poor performance and 5 represents excellent performance. New measure 70-75% 70-75%
Percentage of accurate and complete stakeholder-submitted applications processed within six weeks of receipt. New measure 95-100% 95-100%

Biosecurity Enforcement

     

Investigations of Alleged Breaches of the Biosecurity Act and the Hazardous Substances and New Organisms Act

     
Percentage of complaints received that are correctly evaluated and categorised within the provided timeframe. New measure 90% 90%
This ensures MAF completes activities requiring investigation responses for both 'Lower Threshold Criminal Behaviour' (category II) and 'Serious Criminal Behaviour' (category III) within reasonable timeframes.      
Percentage of Category II - 'Lower Threshold Criminal Behaviour' investigations are 'Marked as Closed' or 'Forwarded for Prosecution' within 6 months of complaint's receipt. New measure 75% 75%
Percentage of Category III - 'Serious Criminal Behaviour'' investigations are 'Marked as Closed' or 'Forwarded for Prosecution' within 18 months of complaint's receipt. New measure 75% 75%

Prosecution of Alleged Breaches of the Biosecurity Act and the Hazardous Substances and New Organisms Act

     
Prosecution of offenders is a key tool MAF can use to incentivise compliance. This measure also ensures prosecutions of both 'Lower Threshold Criminal Behaviour' (category II) and 'Organised Illegal Activity' (category III) are carried out in a timely manner.      
Percentage of Category II - 'Lower Threshold Criminal Behaviour' files 'Forwarded for Prosecution' are also assessed for 'public good evaluation' within 6 months. New measure 100% 100%
Percentage of Category III - 'Serious Criminal Behaviour' files 'Forwarded for Prosecution' are also assessed for 'public good evaluation' within 18 months. New measure 100% 100%
This measure ensures MAF does not unnecessarily take cases to the courts.      
Percentage of cases submitted for 'Public Good Assessment' that receive 'Public Good Clearance'. New measure 90% 90%

Memorandum Account

Memorandum Account - Border Biosecurity Risk Management MCOA (M7) - Biosecurity
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Phytosanitary Exports Account

     
Opening Balance at 1 July 1,205 65 1,270
Revenue 2,168 (655) 1,513
Expenses (2,168) 425 (1,743)
Transfers and Adjustments - - -
Closing Balance at 30 June 1,205 (165) 1,040

Sea Container Levy Account

     
Opening Balance at 1 July 345 (564) (219)
Revenue 8,375 (8,375) -
Expenses (8,375) 8,375 -
Transfers and Adjustments - 219 219
Closing Balance at 30 June 345 (345) -

Risk Screen Levy Screening Account

     
Opening Balance at 1 July (1,355) 452 (903)
Revenue 4,191 (4,191) -
Expenses (4,191) 4,191 -
Transfers and Adjustments - 903 903
Closing Balance at 30 June (1,355) 1,355 -

Imported Used Vehicle Inspection Account

     
Opening Balance at 1 July (4,208) 1,203 (3,005)
Revenue 2,458 (2,458) -
Expenses (2,458) 2,458 -
Transfers and Adjustments - 3,005 3,005
Closing Balance at 30 June (4,208) 4,208 -

Biosecurity Clearance Fees Account

     
Opening Balance at 1 July (837) 393 (444)
Revenue 7,159 (7,159) -
Expenses (7,159) 7,159 -
Transfers and Adjustments - 444 444
Closing Balance at 30 June (837) 837 -

Border Biosecurity Clearance Fees Account

     
Opening Balance at 1 July - - -
Revenue - 25,318 25,318
Expenses - (22,697) (22,697)
Transfers and Adjustments - (4,571) (4,571)
Closing Balance at 30 June - (1,950) (1,950)

On 1 July a changed fee structure was implemented for border clearance activities to reflect changes in the way the border operates, including the increased focus on a risk based as opposed to an inspection based approach. The Phytosanitary Exports Account which does not relate to border clearance activities is unaffected. The other pre-existing memorandum accounts have been closed and balances transferred to a new memorandum account entitled Border Biosecurity Clearance Fees Account.

Domestic Biosecurity Risk Management MCOA (M7)

Scope of Appropriation

Biosecurity Incursion Response and Long Term Pest Management
This output class is limited to the assessment, containment and possible eradication of suspected risk organisms within New Zealand.
Domestic Biosecurity Surveillance
This output class is limited to domestic biosecurity surveillance activities.

Explanation for Use of Multi-Class Output Expense Appropriation

This multi-class output appropriation contains output classes that contribute to reducing the unwanted harm caused by organisms already established in New Zealand.

Expenses and Revenue

Expenses and Revenue - Domestic Biosecurity Risk Management MCOA (M7) - Biosecurity
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Total Appropriation

54,362 4,997 59,359
Biosecurity Incursion Response and Long Term Pest Management 12,495 3,844 16,339
Domestic Biosecurity Surveillance 41,867 1,153 43,020

Revenue from Crown

51,006 6,514 57,520
Biosecurity Incursion Response and Long Term Pest Management 12,271 4,003 16,274
Domestic Biosecurity Surveillance 38,735 2,511 41,246

Revenue from Other

3,356 (1,517) 1,839
Biosecurity Incursion Response and Long Term Pest Management 224 (159) 65
Domestic Biosecurity Surveillance 3,132 (1,358) 1,774

Reasons for Change in Appropriation

This appropriation will increase by $4.997 million to $59.359 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($3.560 million); an expense transfer from 2009/10 for the write-down of foot and mouth vaccine ($2.200 million); an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($45,000); transfer from non-departmental other expense 'Response to kiwifruit disease Pseudomonas syringae pv. actinidiae' for MAF's direct response costs ($2.500 million); and an expense transfer from 2009/10 for the National Animal Identification and Traceability (NAIT) project ($400,000). These changes are offset by: a saving due to Cabinets decision to discontinue the elimination programme for the Mediterranean fanworm ($838,000); a decrease in third party funded activity ($1.445 million); reduced services to other public sector agencies ($72,000); and an expense transfer to 2011/12 for the NAIT project ($1.353 million).

Output Performance Measures and Standards

Output Performance Measures and Standards - Domestic Biosecurity Risk Management MCOA (M7) - Biosecurity
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Domestic Biosecurity Surveillance

     

Incursion Investigation and Diagnostics

     
Number of notifications of suspected risk organisms diverted by the 0800 hotlines for further expert screening and assessment by MAF staff. New measure 2,500 2,500
Number of incursion investigations where a positive result for a 'New to NZ' or 'Risk Organism' is determined - including those associated with risk goods. New measure 200 200
Percentage of Incursion Investigation Group decisions 'Not to Open an Investigation' that are challenged and have the decision reversed. New measure Less than 1% Less than 1%
Percentage of processing, testing and reporting carried out in accordance with Laboratory standard operating procedures. New measure 100% 100%
International Accreditation New Zealand (IANZ) ensures scientific laboratories - and the staff that work within them - meet appropriate competence levels.      
NZS/ISO/IEC 17025 accreditation maintained. New measure Maintain Maintain
Key industry customers are satisfied with the process, and timeframes for receiving a response from laboratory services. New measure Overall satisfaction is 70% or greater Overall satisfaction is 70% or greater
Percentage of cases where the initial assessment of risk and decision to 'Open an Investigation' is completed within 24 hours of receipt of notification. New measure 100% 100%
Percentage of Animal Health Laboratory (AHL) exotic disease investigation and response submissions that are closed within 20 working days of receiving samples. New measure 50% 50%
Percentage of Plant Health Environment Laboratory (PHEL) testing reports that are issued within timeframes agreed in MAF's standard operating procedures. New measure 80% 80%
Percentage of investigations that reach an investigation outcome decision within 30 working days. Cases taking longer than 30 days will generally relate to either priority decisions or to biological or diagnostic factors. New measure 95% 95%

Surveillance Programmes

     
All services delivered under the Surveillance Procurement Panel meet consistent requirements including clear, agreed, and monitored:
  • objectives
  • deliverables/milestones
  • key service indicators.
New measure 100% 100%
All surveillance programmes are based on best practice and/or meet relevant international standards or requirements (i.e. World Organisation for Animal Health (OIE), International Plant Protection Convention (IPPC) standards). New measure 100% 100%

Biosecurity Incursion Response and Long Term Pest Management

     

Response Preparedness

     
Number of Response Programmes. New measure 18-23 18-23
Percentage of responses that have achieved their primary objective. New measure 80% 80%
It is MAF's responsibility to limit (as much as is practical) the damage caused by a biosecurity risk that has breached New Zealand's borders.      
Urgent measures in either the investigation or early response phase will eliminate the biosecurity risk in at least 55 percent of new incursions. New measure 55% 55%

Long Term Management

     
Where response activities have failed to eradicate a pest of national significance, MAF may implement and lead a Long Term Management (LTM) Programme. MAF may also implement a LTM programme for a pest that has been established in NZ for some time, where pest behaviour or spread has resulted in increased and emerging risks at a national scale. LTM programmes generally aim to slow the spread of pests and minimise their impacts.      
Number of long term management programmes in place. New measure 2 2
The on-ground delivery of Long Term Management programmes is largely undertaken by partner agencies and organisations, therefore it is important to have a shared understanding of programme outcomes, and clearly identified critical milestones and deliverables so that MAF and partners achieve those outcomes.      
All critical long term management programmes milestones are achieved. New measure 100% 100%
The involvement and ongoing support of other pest management agencies and organisations is critical to the successful delivery of Long Term Management programmes within a collective model. Annual measurement of the didymo and kauri dieback programmes will identify the level of public confidence with the programme.      
Programme partners are satisfied with the programme, MAF's leadership of the programme, and the relationships between partners. New measure 75% 75%
Long Term Management programmes are underpinned by behaviour change messaging to target audiences, eg, river or forest users. Annual didymo programme surveys show a high degree of awareness and compliance with the Check Clean Dry message. The kauri dieback programme is currently being established and an initial benchmarking survey has indicated a relatively low level, eg, 20 - 30%, of awareness and compliance with hygiene messages.      
Percentage of target audiences that are aware of pest risks, report uptake of desired behaviours and that have changed their behaviour (ie, taken at least one action) to prevent spread
  • Kauri Dieback programme (first year of operation)
  • All other programmes
New measure 30-40% Kauri
80% Other
30-40% Kauri
80% Other

Part 2.2 - Non-Departmental Output Expenses

Control of TB Vectors (M7)

Scope of Appropriation

This appropriation is limited to the Crown's contribution to the implementation of the Bovine Tuberculosis National Pest Management Strategy.

Reasons for Change in Appropriation

This appropriation will decrease by $1.240 million to $29.265 million in 2010/11. Expense transfers are used to align the appropriation to the incurrence of expenditure against annual work programmes that are delayed and extend into the next financial year. Expense transfers of $260,000 from 2009/10 and $1.500 million to 2011/12 were required.

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Response to the Kiwifruit disease Pseudomonas syringae pv. actinidiae (M7)

Scope of Appropriation

This appropriation is limited to supporting an industry-led programme for the kiwifruit disease Pseudomonas syringae pv. actinidiae.

Expenses

Expenses - Response to the Kiwifruit disease Pseudomonas syringae pv. actinidiae (M7) - Biosecurity
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 17,500 17,500

Reasons for Change in Appropriation

In November 2010, the Government approved $25 million in Crown funding, including MAF's direct response costs (excluding staff time), to support the kiwifruit industry-led programme for responding to the kiwifruit disease Pseudomonas syringae pv. actinidiae. A transfer of $2.500 million was made to departmental output expense Domestic Biosecurity Risk Management MCOA to cover MAF's direct response costs. The remaining $22.500 million is payable to the body established by industry "Kiwifruit Vine Health Inc" (KVH) as costs are incurred. An expense transfer of $5 million has been made to 2011/12.

Expected Results

Expected Results - Response to the Kiwifruit disease Pseudomonas syringae pv. actinidiae (M7) - Biosecurity
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
MAF has developed a funding agreement with Kiwifruit Vine Health Inc (KVH) to ensure the money is allocated to relevant activities.      
Kiwi Fruit Vine Health Inc will meet the terms and conditions in the Funding Agreement dated 18 February 2011 for Financial Support to the industry-led programme for responding to Pseudomonas syringae pv. actinidias (PSA). New measure Conditions met Conditions met

Vote Canterbury Earthquake Recovery

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Canterbury Earthquake Recovery (M85)

ADMINISTERING DEPARTMENT: Canterbury Earthquake Recovery Authority

MINISTER RESPONSIBLE FOR CANTERBURY EARTHQUAKE RECOVERY AUTHORITY: Minister for Canterbury Earthquake Recovery

Overview of the Vote

The Minister for Canterbury Earthquake Recovery is responsible for appropriations in Vote Canterbury Earthquake Recovery for the 2010/11 financial year of nearly $4 million to plan and administer the implementation for the earthquake recovery.

Details of these appropriations are set out in Parts 2-6 for Vote Canterbury Earthquake Recovery in the Information Supporting the Supplementary Estimates.

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Canterbury Earthquake Recovery
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Implementation for the Recovery (M85)

This appropriation is limited to expenses incurred in implementing the recovery from the Canterbury earthquakes.
- 979 979

Planning for the Recovery (M85)

This appropriation is limited to expenses incurred in planning the recovery from the Canterbury Earthquake.
- 2,936 2,936

Total Departmental Output Expenses

- 3,915 3,915

Departmental Capital Expenditure

     

Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

This appropriation is limited to the purchase or development of assets by and for the use of the Canterbury Earthquake Recovery Authority, as authorised by section 24(1) of the Public Finance Act 1989.
- 20 20

Total Departmental Capital Expenditure

- 20 20

Total Annual and Permanent Appropriations

- 3,935 3,935

Details of Projected Movements in Departmental
Net Assets

Canterbury Earthquake Recovery Authority

Canterbury Earthquake Recovery Authority - Details of Projected Movements in Departmental Net Assets - Canterbury Earthquake Recovery
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance - - Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections - 50  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

- 50  

Information Supporting the Supplementary Estimates Vote Canterbury Earthquake Recovery

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Canterbury Earthquake Recovery (M85)

ADMINISTERING DEPARTMENT: Canterbury Earthquake Recovery Authority

MINISTER RESPONSIBLE FOR CANTERBURY EARTHQUAKE RECOVERY AUTHORITY: Minister for Canterbury Earthquake Recovery

Part 1 - Summary of the Vote

Part 1.1 - Overview of the Vote

The Minister for Canterbury Earthquake Recovery is responsible for appropriations in Vote Canterbury Earthquake Recovery for the 2010/11 financial year of nearly $4 million to plan and administer the implementation for the earthquake recovery.

Details of these appropriations are set out in Parts 2-6 below.

Part 1.2 - High-Level Objectives of the Vote

Government Priorities and Outcomes - Links to Appropriations

Government Priorities and Outcomes - Links to Appropriations - Canterbury Earthquake Recovery
Government Priorities Government Outcomes Appropriations
A Stronger Economy
Building a strong economy, based on real enduring growth, will provide New Zealanders the jobs, improved incomes, and improved living standards they desire and deserve.
Economic Development and Infrastructure Sector
To facilitate the recovery of Canterbury following the Canterbury Earthquake on 4 September 2010 and the subsequent aftershocks, including the 22 February 2011 aftershock.
Planning for the Recovery
Implementation for the Recovery

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Canterbury Earthquake Recovery
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses - 3,915 - 3,915 3,915
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses - - - - -
Capital Expenditure - 20 - 20 20
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

- 3,935 - 3,935 3,935

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Analysis of Significant Trends

Canterbury Earthquake Recovery Authority (CERA) was established on 29 March 2011 to facilitate the recovery of Canterbury following the Canterbury Earthquake on 4 September 2010 and the subsequent aftershocks, including the 22 February 2011 aftershock. It was funded nearly $4 million for costs to be incurred in 2010/11.

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 2.1 Departmental Output Expenses - Canterbury Earthquake Recovery
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: Improved economic performance.
Impact: Economic Development and Infrastructure Sector - To facilitate the recovery of Canterbury following the Canterbury Earthquake on 4 September 2010 and the subsequent aftershocks, including the 22 February 2011 aftershock.
Planning for the Recovery
Implementation for the Recovery

Implementation for the Recovery (M85)

Scope of Appropriation

This appropriation is limited to expenses incurred in implementing the recovery from the Canterbury earthquakes.

Expenses and Revenue

Expenses and Revenue - Implementation for the Recovery (M85) - Canterbury Earthquake Recovery
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 979 979
Revenue from Crown - 979 979
Revenue from Other - - -

Reasons for Change in Appropriation

Canterbury Earthquake Recovery Authority (CERA) was established on 29 March 2011 to facilitate the recovery of Canterbury following the Canterbury Earthquake on 4 September 2010 and the subsequent aftershocks, including the 22 February 2011 aftershock, with $979,000 provided for administering the implementation for the recovery.

Output Performance Measures and Standards

Output Performance Measures and Standards - Implementation for the Recovery (M85) - Canterbury Earthquake Recovery
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Provide advice and updates to the Minister for Canterbury Earthquake Recovery. N/A The Minister reports satisfaction with the quality of reporting and policy advice received. The Minister reports satisfaction with the quality of reporting and policy advice received.

Planning for the Recovery (M85)

Scope of Appropriation

This appropriation is limited to expenses incurred in planning the recovery from the Canterbury Earthquake.

Expenses and Revenue

Expenses and Revenue - Planning for the Recovery (M85) - Canterbury Earthquake Recovery
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 2,936 2,936
Revenue from Crown - 2,936 2,936
Revenue from Other - - -

Reasons for Change in Appropriation

Canterbury Earthquake Recovery Authority (CERA) was established on 29 March 2011 to facilitate the recovery of Canterbury following the Canterbury Earthquake on 4 September 2010 and the subsequent aftershocks, including the 22 February 2011 aftershock, with $2.936 million provided for planning for the recovery.

Output Performance Measures and Standards

Output Performance Measures and Standards - Planning for the Recovery (M85) - Canterbury Earthquake Recovery
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Provide advice and updates to the Minister for Canterbury Earthquake Recovery. N/A The Minister reports satisfaction with the quality of reporting and policy advice received. The Minister reports satisfaction with the quality of reporting and policy advice received.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 6.1 Departmental Capital Expenditure - Canterbury Earthquake Recovery
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: Economic Development and Infrastructure Sector - to facilitate the recovery of Canterbury following the Canterbury Earthquake on 4 September 2010 and the subsequent aftershocks, including the 22 February 2011 aftershock.
Impact: Resources in the State sector are effectively and efficiently managed.
Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Canterbury Earthquake Recovery Authority, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Canterbury Earthquake Recovery Authority Capital Expenditure PLA (M85) - Canterbury Earthquake Recovery
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment - 20 20
Intangibles - - -
Other - - -

Total Appropriation

- 20 20

Reasons for Change in Appropriation

The anticipated capital costs for the Canterbury Earthquake Recovery Authority are still being developed during the initial planning stages of the Authority. In 2010/11 funding of $50,000 has been provided but at this stage only $20,000 is required for the purchase of a motor vehicle.

Expected Results

Capital expenditure in 2010/11 will be used for the purchase of a motor vehicle.

Vote Climate Change

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Climate Change Issues (M12)

ADMINISTERING DEPARTMENT: Ministry for the Environment

MINISTER RESPONSIBLE FOR MINISTRY FOR THE ENVIRONMENT: Minister for the Environment

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Climate Change
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Policy Advice - Climate Change (M12)

This appropriation is limited to policy advice and implementation, operational costs and fulfilling international obligations to support the Government's commitment on Climate Change under the Kyoto Protocol; and Ministerial servicing.
11,594 1,145 12,739

Total Departmental Output Expenses

11,594 1,145 12,739

Non-Departmental Output Expenses

     

Administration of New Zealand Units held on Trust (M12)

This appropriation is limited to the application for and holding on trust of New Zealand Units on behalf of the future owners of Crown Forest Licensed land.
- 297 297

Total Non-Departmental Output Expenses

- 297 297

Non-Departmental Other Expenses

     

Allocation of New Zealand Units (M12)

This appropriation is limited to the granting of New Zealand Units to sectors of the New Zealand Economy.
1,033,977 481,028 1,515,005

Climate Change Development Fund (M12)

This appropriation is limited to supporting international projects to assist developing countries address climate change issues.
300 - 300

Framework Convention on Climate Change (M12)

New Zealand's contribution to the United Nations Framework Convention on Climate Change.
127 - 127

Impairment of Debt Relating to the New Zealand Emissions Trading Scheme (M12)

This appropriation is limited to the impairment and write-down of debt arising from the collection of revenue under the New Zealand Emissions Trading Scheme.
- 1,000 1,000

Issue of New Zealand Assigned Amount Units to Permanent Forest Sink Initiative Participants (M12)

This appropriation is limited to the granting of New Zealand Assigned Amount Units to Permanent Forest Sink Initiative participants for eligible afforestation.
7,814 (314) 7,500

Purchase of Units under the New Zealand Emissions Trading Scheme (M12)

This appropriation is limited to the purchase and surrender of units under Section 159 of the Climate Change Response Act 2002.
- 1,000 1,000

Total Non-Departmental Other Expenses

1,042,218 482,714 1,524,932

Non-Departmental Capital Expenditure

     

Purchase of PRE Units (M12)

Purchasing of PRE emission units by the Crown from the Projects to Reduce Emissions (PRE) portfolio.
2,248 1,204 3,452

Total Non-Departmental Capital Expenditure

2,248 1,204 3,452

Total Annual and Permanent Appropriations

1,056,060 485,360 1,541,420

Details of Multi-Year Appropriations

Multi-Year Appropriations - Climate Change
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Departmental Output Expenses

   

Land Use and Carbon Analysis System (M12)

This appropriation is limited to developing a national carbon accounting system that will contribute to meeting of New Zealand's greenhouse gas reporting obligations under the Kyoto Protocol and the UNFCCC.

Commences: 1 July 2010

Expires: 30 June 2014

Original Appropriation 28,981
Adjustments for 2009/10 -
Adjustments to 2010/11 600
Adjusted Appropriation 29,581
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 6,500
Estimated Actual for 2011/12 12,300
Estimated Appropriation Remaining 10,781

Information Supporting the Supplementary Estimates Vote Climate Change

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Climate Change Issues (M12)

ADMINISTERING DEPARTMENT: Ministry for the Environment

MINISTER RESPONSIBLE FOR MINISTRY FOR THE ENVIRONMENT: Minister for the Environment

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Climate Change
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 20,894 (1,655) 297 (1,358) 19,536
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 1,042,218 - 482,714 482,714 1,524,932
Capital Expenditure 2,248 - 1,204 1,204 3,452
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

1,065,360 (1,655) 484,215 482,560 1,547,920

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 377,539 N/A 206,374 206,374 583,913
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

377,539 N/A 206,374 206,374 583,913

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 5.2 NonDepartmental Other Expenses - Crown Research Institutes
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Reimburse CRIs for the cost of cleaning up contaminated sites Crown Residual Liabilities

Crown Residual Liabilities (M84)

Scope of Appropriation

Payments made in relation to indemnities provided by the Crown to CRIs when they were established, relating to settling legal claims against the former science departments, cleaning up contaminated sites, meeting various statutory requirements, and reimbursing CRIs for redundancy payments in relation to staff not retained.

Expenses

Expenses - Crown Residual Liabilities (M84) - Crown Research Institutes
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 755 755

Reasons for Change in Appropriation

The clean up and other costs incurred in relation to residual liabilities reimbursed under this appropriation were not fully completed in the 2009/10 year, therefore an expense transfer to 2010/11 was required.

Vote Customs

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Customs (M21)

ADMINISTERING DEPARTMENT: New Zealand Customs Service

MINISTER RESPONSIBLE FOR NEW ZEALAND CUSTOMS SERVICE: Minister of Customs

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Customs
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Clearance and Enforcement Services Related to Craft (M21)

This appropriation is limited to the provision of services relating to craft arriving in and departing from New Zealand, including clearance of craft, and protection of New Zealand's interests through interventions, investigations and enforcement.
7,132 (130) 7,002

Clearance and Enforcement Services Related to Goods (M21)

This appropriation is limited to the provision of services relating to goods crossing the border, including clearance of goods, assessment and audit of revenue, trade compliance and supply chain security assurance, and protection of New Zealand's interests through interventions, audits, investigations and enforcement.
59,592 (1,202) 58,390

Clearance and Enforcement Services Related to Passengers and Crew (M21)

This appropriation is limited to the provision of services relating to passengers and crew crossing the border, including collecting information, clearance of people and their possessions, and protection of New Zealand's interests through interventions, investigations and enforcement.
47,478 577 48,055

Information and Intelligence Services (M21)

This appropriation is limited to the provision of information, intelligence and risk assessment services to external clients, and the operation of the National Maritime Coordination Centre.
6,569 547 7,116

Policy Advice and International Services (M21)

This appropriation is limited to the provision of ministerial support, policy advice and international services, obligations and assistance.
7,676 1,627 9,303

Revenue Collection (M21)

This appropriation is limited to the provision of services relating to receipt and processing of revenues owing to the Crown and other agencies, revenue assurance, credit and debt management.
5,299 14 5,313

Total Departmental Output Expenses

133,746 1,433 135,179

Non-Departmental Other Expenses

     

Change in Doubtful Debt Provision (M21)

Provisioning of Doubtful Debts on Customs Crown Revenue.
2,000 - 2,000

World Customs Organisation (M21)

New Zealand's contribution to the operating budget of the WCO.
88 (34) 54

Total Non-Departmental Other Expenses

2,088 (34) 2,054

Departmental Capital Expenditure

     

New Zealand Customs Service - Capital Expenditure PLA (M21)

This appropriation is limited to the purchase or development of assets by and for the use of the New Zealand Customs Service, as authorised by section 24(1) of the Public Finance Act 1989.
48,536 (26,771) 21,765

Total Departmental Capital Expenditure

48,536 (26,771) 21,765

Total Annual and Permanent Appropriations

184,370 (25,372) 158,998

Details of Projected Movements in Departmental
Net Assets

New Zealand Customs Service

New Zealand Customs Service - Details of Projected Movements in Departmental Net Assets - Customs
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 50,413 51,164 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections 37,144 5,315 Automated Passenger Processing Technology and Digital Tracking and Surveillance Technology.
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

87,557 56,479  

Information Supporting the Supplementary Estimates Vote Customs

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Customs (M21)

ADMINISTERING DEPARTMENT: New Zealand Customs Service

MINISTER RESPONSIBLE FOR NEW ZEALAND CUSTOMS SERVICE: Minister of Customs

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Customs
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 133,746 1,433 - 1,433 135,179
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 2,088 - (34) (34) 2,054
Capital Expenditure 48,536 (26,771) - (26,771) 21,765
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

184,370 (25,338) (34) (25,372) 158,998

Crown Revenue and Capital Receipts

         
Tax Revenue 10,823,000 N/A (83,000) (83,000) 10,740,000
Non-Tax Revenue 80 N/A - - 80
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

10,823,080 N/A (83,000) (83,000) 10,740,080

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Clearance and Enforcement Services Related to Craft (M21)

Scope of Appropriation

This appropriation is limited to the provision of services relating to craft arriving in and departing from New Zealand, including clearance of craft, and protection of New Zealand's interests through interventions, investigations and enforcement.

Expenses and Revenue

Expenses and Revenue - Clearance and Enforcement Services Related to Craft (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 7,132 (130) 7,002
Revenue from Crown 6,958 (166) 6,792
Revenue from Other 174 34 208

Reasons for Change in Appropriation

This appropriation will decrease by $130,000 to $7.002 million. This decrease mainly recognises latest costing information and prioritised resource allocations within the New Zealand Customs Service to enable the Service to meet performance standards across all its areas of responsibilities.

Clearance and Enforcement Services Related to Goods (M21)

Scope of Appropriation

This appropriation is limited to the provision of services relating to goods crossing the border, including clearance of goods, assessment and audit of revenue, trade compliance and supply chain security assurance, and protection of New Zealand's interests through interventions, audits, investigations and enforcement.

Expenses and Revenue

Expenses and Revenue - Clearance and Enforcement Services Related to Goods (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 59,592 (1,202) 58,390
Revenue from Crown 20,268 (1,497) 18,771
Revenue from Other 39,324 296 39,620

Reasons for Change in Appropriation

This appropriation will decrease by $1.202 million to $58.390 million. This decrease mainly recognises latest costing information and prioritised resource allocations within the New Zealand Customs Service to enable the Service to meet performance standards across all its areas of responsibilities.

Clearance and Enforcement Services Related to Passengers and Crew (M21)

Scope of Appropriation

This appropriation is limited to the provision of services relating to passengers and crew crossing the border, including collecting information, clearance of people and their possessions, and protection of New Zealand's interests through interventions, investigations and enforcement.

Expenses and Revenue

Expenses and Revenue - Clearance and Enforcement Services Related to Passengers and Crew (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 47,478 577 48,055
Revenue from Crown 46,316 (1) 46,315
Revenue from Other 1,162 578 1,740

Reasons for Change in Appropriation

This appropriation will decrease by $577,000 to $48.055 million. This decrease mainly recognises latest costing information and prioritised resource allocations within the New Zealand Customs Service to enable the Service to meet performance standards across all its areas of responsibilities.

Information and Intelligence Services (M21)

Scope of Appropriation

This appropriation is limited to the provision of information, intelligence and risk assessment services to external clients, and the operation of the National Maritime Coordination Centre.

Expenses and Revenue

Expenses and Revenue - Information and Intelligence Services (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 6,569 547 7,116
Revenue from Crown 5,583 1,207 6,790
Revenue from Other 986 (660) 326

Reasons for Change in Appropriation

This appropriation will increase by $547,000 to $7.116 million. This increase mainly recognises latest costing information and prioritised resource allocations within the New Zealand Customs Service to enable the Service to meet performance standards across all its areas of responsibilities.

Policy Advice and International Services (M21)

Scope of Appropriation

This appropriation is limited to the provision of ministerial support, policy advice and international services, obligations and assistance.

Expenses and Revenue

Expenses and Revenue - Policy Advice and International Services (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 7,676 1,627 9,303
Revenue from Crown 7,363 446 7,809
Revenue from Other 313 1,181 1,494

Reasons for Change in Appropriation

This appropriation will increase by $1.627 million to $9.303 million. This increase recognises latest costing information and prioritised resource allocations within the New Zealand Customs Service to enable the Service to meet performance standards across all its areas of responsibilities. It also includes additional funding for advancing Free Trade Agreements and projects to assist other Customs administrations in the Pacific.

Revenue Collection (M21)

Scope of Appropriation

This appropriation is limited to the provision of services relating to receipt and processing of revenues owing to the Crown and other agencies, revenue assurance, credit and debt management.

Expenses and Revenue

Expenses and Revenue - Revenue Collection (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 5,299 14 5,313
Revenue from Crown 4,993 45 5,038
Revenue from Other 306 (30) 276

Reasons for Change in Appropriation

This appropriation will increase by $14,000 to $5.313 million. This increase mainly recognises latest costing information and prioritised resource allocations within the New Zealand Customs Service to enable the Service to meet performance standards across all its areas of responsibilities.

Output Performance Measures and Standards

Output Performance Measures and Standards - Revenue Collection (M21) - Customs
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Revenue collected on behalf of the Crown, as advised by Treasury $10,823 million $10,575million $10,575 million

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

New Zealand Customs Service - Capital Expenditure PLA (M21)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the New Zealand Customs Service, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - New Zealand Customs Service Capital Expenditure PLA (M21) - Customs
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 18,575 (3,667) 14,908
Intangibles 29,961 (23,104) 6,857
Other - - -

Total Appropriation

48,536 (26,771) 21,765

Reasons for Change in Appropriation

This decrease of $26.771 million to $21.765 million recognises the timing of the New Zealand Customs Service's capital expenditure programme with some approved and planned capital projects, in particular the Joint Border Management System, being completed in or deferred to 2011/12.

Vote Defence

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Defence (M22)

ADMINISTERING DEPARTMENT: Ministry of Defence

MINISTER RESPONSIBLE FOR MINISTRY OF DEFENCE: Minister of Defence

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Defence
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Audit and Assessment of Performance (M22)

This appropriation is limited to audits and assessments of the New Zealand Defence Force and the Ministry of Defence.
1,906 (172) 1,734

Management of Equipment Procurement (M22)

Managing procurement or refurbishment, on behalf of the Crown, of various items of equipment contributing to a capability of the New Zealand Defence Force.
3,930 198 4,128

Policy Advice (M22)

Policy advice, management of international defence relations and services to the Minister.
3,955 1,081 5,036

Total Departmental Output Expenses

9,791 1,107 10,898

Departmental Capital Expenditure

     

Ministry of Defence - Capital Expenditure PLA (M22)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Defence, as authorised by section 24(1) of the Public Finance Act 1989.
315 - 315

Total Departmental Capital Expenditure

315 - 315

Non-Departmental Capital Expenditure

     

Defence Equipment (M22)

This appropriation is limited to the purchase, modification or refurbishment of major items of defence equipment for the New Zealand Defence Force.
228,753 (57,194) 171,559

Total Non-Departmental Capital Expenditure

228,753 (57,194) 171,559

Total Annual and Permanent Appropriations

238,859 (56,087) 182,772

Details of Projected Movements in Departmental
Net Assets

Ministry of Defence

Ministry of Defence - Details of Projected Movements in Departmental Net Assets - Defence
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 3,416 3,416  
Capital Injections - -  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

3,416 3,416  

Information Supporting the Supplementary Estimates Vote Defence

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Defence (M22)

ADMINISTERING DEPARTMENT: Ministry of Defence

MINISTER RESPONSIBLE FOR MINISTRY OF DEFENCE: Minister of Defence

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Defence
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 9,791 1,107 - 1,107 10,898
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses - - - - -
Capital Expenditure 229,068 - (57,194) (57,194) 171,874
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

238,859 1,107 (57,194) (56,087) 182,772

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 200 N/A - - 200
Capital Receipts 328,722 N/A (192,925) (192,925) 135,797

Total Crown Revenue and Capital Receipts

328,922 N/A (192,925) (192,925) 135,997

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Audit and Assessment of Performance (M22)

Scope of Appropriation

This appropriation is limited to audits and assessments of the New Zealand Defence Force and the Ministry of Defence.

Expenses and Revenue

Expenses and Revenue - Audit and Assessment of Performance (M22) - Defence
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 1,906 (172) 1,734
Revenue from Crown 1,839 (172) 1,667
Revenue from Other 67 - 67

Reasons for Change in Appropriation

This appropriation will decrease by $172,000 due to an increase in the Government Super Employer Contribution of $13,000 and a reallocation of overheads of $185,000.

Management of Equipment Procurement (M22)

Scope of Appropriation

Managing procurement or refurbishment, on behalf of the Crown, of various items of equipment contributing to a capability of the New Zealand Defence Force.

Expenses and Revenue

Expenses and Revenue - Management of Equipment Procurement (M22) - Defence
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 3,930 198 4,128
Revenue from Crown 3,862 48 3,910
Revenue from Other 68 150 218

Reasons for Change in Appropriation

The appropriation will increase by $198,000 which is due to an increase of $150,000 for a Naval Helicopter study, an increase of $2.250 million for phase one of Project Protector remediation, a decrease of $712,000 for realignment of overheads and a decrease of $1.490 million due to an expense transfer for the Protector Remediation.

Policy Advice (M22)

Scope of Appropriation

Policy advice, management of international defence relations and services to the Minister.

Expenses and Revenue

Expenses and Revenue - Policy Advice (M22) - Defence
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 3,955 1,081 5,036
Revenue from Crown 3,887 1,081 4,968
Revenue from Other 68 - 68

Reasons for Change in Appropriation

The appropriation will increase by $1.081 million due to an increase of $19,000 in the Government Super Fund employer contribution, an increase of $165,000 for the Value for Money study associated with the Defence Review and a reallocation of $897,000 of corporate overheads.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Ministry of Defence - Capital Expenditure PLA (M22)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Defence, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Ministry of Defence Capital Expenditure PLA (M22) - Defence
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 195 (35) 160
Intangibles 120 35 155
Other - - -

Total Appropriation

315 - 315

Reasons for Change in Appropriation

There is no change in the appropriation this year. There has been reclassification between plant, property and equipment and intangible assets of $35,000. 

Part 6.2 - Non-Departmental Capital Expenditure

Defence Equipment (M22)

Scope of Appropriation

This appropriation is limited to the purchase, modification or refurbishment of major items of defence equipment for the New Zealand Defence Force.

Capital Expenditure

Capital Expenditure - Defence Equipment (M22) - Defence
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 228,753 (57,194) 171,559

Reasons for Change in Appropriation

The reduction in the appropriation is due to an increase of $7.6 million for the Platform Systems Upgrade Phase II, an increase of $6.635 million for the first phase of the Protector Remediation project and a decrease of $71.429 million due to a change in revenue from the New Zealand Defence Force on the sale of equipment

Vote Defence Force

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Defence (M22)

ADMINISTERING DEPARTMENT: New Zealand Defence Force

MINISTER RESPONSIBLE FOR NEW ZEALAND DEFENCE FORCE: Minister of Defence

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Defence Force
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Fixed Wing Transport Forces (M22)

Provision of the capabilities of No 40 Squadron RNZAF (Boeing 757-200 and C-130 Hercules aircraft) prepared to conduct strategic and tactical air transport operations, including aeromedical evacuation, in accordance with NZDF Output Plan specifications, and to contribute support services to the community.
244,441 4,402 248,843

Land Combat Forces (M22)

Provision of the capabilities of the Land Combat Forces (command, control, intelligence and manoeuvre force elements) prepared to conduct land operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.
405,762 (15,873) 389,889

Land Combat Service Support Forces (M22)

Provision of the capabilities of the Land Combat Service Support Forces (transport, medical, supply, repair and movements force elements) prepared to support land operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.
154,720 (583) 154,137

Land Combat Support Forces (M22)

Provision of the capabilities of the Land Combat Support Forces (artillery, engineers, communications and military police force elements) prepared to conduct land operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.
211,524 188 211,712

Maritime Patrol Forces (M22)

Provision of the capabilities of No 5 Squadron RNZAF (P-3K Orion aircraft) prepared to conduct maritime surveillance of New Zealand's EEZ, the Pacific region and the Southern Ocean, to conduct search and rescue missions, and to conduct maritime air operations, in accordance with NZDF Output Plan specifications. This output expense also includes some support services to the community.
178,708 (13,058) 165,650

Military Hydrography, and Hydrographic Data Collection and Processing for LINZ (M22)

Provision of the capabilities of the hydrographic and oceanographic survey vessel, HMNZS RESOLUTION, specialist personnel and support infrastructure to conduct military hydrography in accordance with NZDF Output Plan specifications, and hydrographic data collection and processing that meets contractual commitments to Land Information New Zealand (LINZ). This output expense is supported by the Hydrographic Business Unit.
16,360 (976) 15,384

Military Policy Development, Coordination and Advice (M22)

Provision of advice to the Minister of Defence on military contributions to New Zealand's foreign policy and military responses to contingencies, in accordance with NZDF Output Plan specifications. This output expense also includes military intelligence, responses to ministerial correspondence, select committee and parliamentary questions, Official Information Act inquiries, and Ombudsmen correspondence.
16,334 (539) 15,795

Mine Countermeasures (MCM) and MCM Diving Forces (M22)

Provision of the capabilities of the Mine Countermeasures (MCM) Forces, HMNZS MANAWANUI, prepared to conduct route surveys and conditioning of selected New Zealand ports, and the provision of the Operational Diving Team prepared to support MCM operations and to conduct independent diving tasks, in accordance with NZDF Output Plan specifications. This output expense also includes some support services to the community.
24,854 (262) 24,592

Miscellaneous Support Activities MCOA (M22)

25,517 1,217 26,734
Support to Mutual Assistance Programme (MAP)
This output class is limited to the provision of training, technical advice and resources to the defence forces and law enforcement agencies of participant countries under the Mutual Assistance Programme (MAP), both in New Zealand and in MAP countries.
2,388 422 2,810
Support to New Zealand Cadet Forces
This output class is limited to the provision of leadership and skills training for all approved New Zealand Cadet Force (NZCF) units.
3,399 156 3,555
Support to Service Military Museums
This output class is limited to collection development, collection management and exhibits related to New Zealand's military history.
6,260 (62) 6,198
Support to Youth Development
This output class is limited to New Zealand Defence Force support to government initiated youth development schemes in New Zealand, being the conduct of Limited Service Volunteer courses and contributions to Youth Life Skills programmes (Service Academies and Military-style Activity Camps).
13,470 701 14,171

Naval Combat Forces (M22)

Provision of the capabilities of the frigates, HMNZ Ships TE KAHA and TE MANA, prepared to conduct maritime operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.
398,139 4,365 402,504

Naval Helicopter Forces (M22)

Provision of the capabilities of No 6 Squadron RNZAF (Seasprite SH-2G helicopters) prepared to conduct maritime operations in support of other Output Expenses, especially the Naval Combat Forces, Naval Support Forces and Naval Patrol Forces, in accordance with NZDF Output Plan specifications.
87,939 1,806 89,745

Naval Patrol Forces (M22)

Provision of the capabilities of the Offshore and Inshore Patrol Vessels (OPVs, IPVs) prepared for the conduct of maritime operations in support of Multi-Agency Operations and Tasks (MAO&T), and for the security and protection of New Zealand's economic border and EEZ, in accordance with NZDF Output Plan specifications. Once in service the OPVs will also be prepared to conduct sovereignty and resource protection patrol operations in the Southern Ocean, Ross Dependency, South Pacific region and further afield when directed.
127,452 (1,929) 125,523

Naval Support Forces (M22)

Provision of the capabilities of the Fleet Replenishment Ship, HMNZS ENDEAVOUR, and the Multi-Role Vessel, HMNZS CANTERBURY, prepared to conduct maritime logistic support and amphibious sealift operations for deployed military forces, in accordance with NZDF Output Plan specifications. This output expense also includes contributions to a range of services provided to Government and the community.
106,026 (1,177) 104,849

Operationally Deployed Forces Annual (M22)

The provision of deployed force elements on military tasks, including the commitments agreed by Government under which the NZDF contributes to peace support and other operations conducted in support of the United Nations and other international agencies. It includes the provision of individuals, observers, advisers, instructors, headquarters staff, and complete force elements and contingents.
78,446 (151) 78,295

Rotary Wing Transport Forces (M22)

Provision of the capabilities of No 3 Squadron RNZAF (Iroquois helicopters) prepared to conduct tactical air transport, including aeromedical evacuation, and counter-terrorist operations, and to contribute support services to the community, in accordance with NZDF Output Plan specifications.
131,988 (8,963) 123,025

Special Operations Forces (M22)

Provision of the capabilities of the Special Operations Forces prepared to conduct special forces operations in support of land operations, counter-terrorist operations, and the provision of Chemical, Biological, Radiological, Explosive, Improvised Explosive Device Disposal (CBRE IEDD) that threaten public safety or national interests, in accordance with NZDF Output Plan specifications.
71,251 2,379 73,630

Total Departmental Output Expenses

2,279,461 (29,154) 2,250,307

Departmental Other Expenses

     

Disposal of Decommissioned Assets (M22)

This appropriation is limited to the disposal costs of decommissioned assets.
- 500 500

Maintenance of Assets Awaiting Sale (M22)

This appropriation is limited to costs necessary to keep assets awaiting sale in a saleable condition.
- 2,750 2,750

Total Departmental Other Expenses

- 3,250 3,250

Departmental Capital Expenditure

     

New Zealand Defence Force - Capital Expenditure PLA (M22)

This appropriation is limited to the purchase or development of assets by and for the use of the New Zealand Defence Force, as authorised by section 24(1) of the Public Finance Act 1989.
572,914 (172,914) 400,000

Total Departmental Capital Expenditure

572,914 (172,914) 400,000

Total Annual and Permanent Appropriations

2,852,375 (198,818) 2,653,557

Details of Projected Movements in Departmental
Net Assets

New Zealand Defence Force

New Zealand Defence Force - Details of Projected Movements in Departmental Net Assets - Defence Force
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 5,721,842 5,652,726 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections - 6,635 The increase reflects agreement during 2010/11 to provide for the Protector Remediation Programme.
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - (3,250) Technical changes to provide for expensing the cost of asset disposal ($500,000) and assets awaiting sale ($2.750 million) during 2010/11.
Other Movements 93,300 (2,297) Technical increases of $3.250 million required to maintain the Departmental Net Asset value if a forecast 2010/11 deficit does not occur, offset by asset revaluation decreases of $5.547 million.

Closing Balance

5,815,142 5,653,814  

Information Supporting the Supplementary Estimates Vote Defence Force

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Defence (M22)

ADMINISTERING DEPARTMENT: New Zealand Defence Force

MINISTER RESPONSIBLE FOR NEW ZEALAND DEFENCE FORCE: Minister of Defence

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Defence Force
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 2,279,461 (29,154) - (29,154) 2,250,307
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses - 3,250 - 3,250 3,250
Capital Expenditure 572,914 (172,914) - (172,914) 400,000
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

2,852,375 (198,818) - (198,818) 2,653,557

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Fixed Wing Transport Forces (M22)

Scope of Appropriation

Provision of the capabilities of No 40 Squadron RNZAF (Boeing 757-200 and C-130 Hercules aircraft) prepared to conduct strategic and tactical air transport operations, including aeromedical evacuation, in accordance with NZDF Output Plan specifications, and to contribute support services to the community.

Reasons for Change in Appropriation

This appropriation will increase by $4.402 million to $248.843 million for 2010/11. This increase relates to:

  • a technical increase as a result of asset revaluation ($24,000)
  • an expense transfer ($2.047 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase to provide for the government superannuation fund rate increase ($212,000)
  • an increase for the tax treatment of non operational allowances ($710,000)
  • an increase in input costs met from NZDF resource reprioritisation ($6.567 million)
  • an expense transfer ($1.769 million) to 2011/12 for savings initiatives
  • a decrease for a cross Vote initiative ($1.178 million), and
  • an expense transfer ($2.211 million) to provide for a 2011/12 capital injection.

Land Combat Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Land Combat Forces (command, control, intelligence and manoeuvre force elements) prepared to conduct land operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will decrease by $15.873 million to $389.889 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($1.366 million)
  • an expense transfer ($3.972 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase to provide for the government superannuation fund rate increase ($418,000)
  • an increase for the tax treatment of non operational allowances ($1.401 million)
  • a decrease in input costs identified for NZDF resource reprioritisation ($10.307 million)
  • a decrease for a cross Vote initiative ($2.271 million)
  • an expense transfer ($3.431 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($4.289 million) to provide for a 2011/12 capital injection.

Land Combat Service Support Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Land Combat Service Support Forces (transport, medical, supply, repair and movements force elements) prepared to support land operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will decrease by $583,000 to $154.137 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($505,000)
  • an expense transfer ($1.611 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase to provide for the government superannuation fund rate increase ($144,000)
  • an increase for the tax treatment of non operational allowances ($481,000)
  • an increase in input costs met from NZDF resource reprioritisation ($1.708 million)
  • an expense transfer ($1.788 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($2.234 million) to provide for a 2011/12 capital injection.

Land Combat Support Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Land Combat Support Forces (artillery, engineers, communications and military police force elements) prepared to conduct land operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will increase by $188,000 to $211.712 million for 2010/11. This increase relates to:

  • a technical decrease as a result of asset revaluation ($524,000)
  • an expense transfer ($2.158 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase to provide for the government superannuation fund rate increase ($177,000)
  • an increase for the tax treatment of non operational allowances ($593,000)
  • an increase in input costs met from NZDF resource reprioritisation ($3.207 million)
  • an expense transfer ($2.410 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($3.013 million) to provide for a 2011/12 capital injection.

Maritime Patrol Forces (M22)

Scope of Appropriation

Provision of the capabilities of No 5 Squadron RNZAF (P-3K Orion aircraft) prepared to conduct maritime surveillance of New Zealand's EEZ, the Pacific region and the Southern Ocean, to conduct search and rescue missions, and to conduct maritime air operations, in accordance with NZDF Output Plan specifications. This output expense also includes some support services to the community.

Reasons for Change in Appropriation

This appropriation will decrease by $13.058 million to $165.650 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($466,000)
  • an expense transfer ($1.324 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase to provide for the government superannuation fund rate increase ($98,000)
  • an increase for the tax treatment of non operational allowances ($328,000)
  • a decrease in input costs identified for NZDF resource reprioritisation ($11.036 million)
  • an expense transfer ($1.469 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($1.837 million) to provide for a 2011/12 capital injection.

Military Hydrography, and Hydrographic Data Collection and Processing for LINZ (M22)

Scope of Appropriation

Provision of the capabilities of the hydrographic and oceanographic survey vessel, HMNZS RESOLUTION, specialist personnel and support infrastructure to conduct military hydrography in accordance with NZDF Output Plan specifications, and hydrographic data collection and processing that meets contractual commitments to Land Information New Zealand (LINZ). This output expense is supported by the Hydrographic Business Unit.

Reasons for Change in Appropriation

This appropriation will decrease by $976,000 to $15.384 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($31,000)
  • an expense transfer ($46,000) from 2009/10 as a result of 2010/11 operating pressures
  • a decrease in input costs identified for NZDF resource reprioritisation ($875,000)
  • an expense transfer ($52,000) to 2011/12 for savings initiatives, and
  • an expense transfer ($64,000) to provide for a 2011/12 capital injection.

Military Policy Development, Coordination and Advice (M22)

Scope of Appropriation

Provision of advice to the Minister of Defence on military contributions to New Zealand's foreign policy and military responses to contingencies, in accordance with NZDF Output Plan specifications. This output expense also includes military intelligence, responses to ministerial correspondence, select committee and parliamentary questions, Official Information Act inquiries, and Ombudsmen correspondence.

Reasons for Change in Appropriation

This appropriation will decrease by $539,000 to $15.795 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($12,000)
  • a decrease for a cross Vote initiative ($87,000), and
  • a decrease in input costs identified for NZDF resource reprioritisation ($440,000).

Mine Countermeasures (MCM) and MCM Diving Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Mine Countermeasures (MCM) Forces, HMNZS MANAWANUI, prepared to conduct route surveys and conditioning of selected New Zealand ports, and the provision of the Operational Diving Team prepared to support MCM operations and to conduct independent diving tasks, in accordance with NZDF Output Plan specifications. This output expense also includes some support services to the community.

Reasons for Change in Appropriation

This appropriation will decrease by $262,000 to $24.592 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($89,000)
  • an expense transfer ($161,000) from 2009/10 as a result of 2010/11 operating pressures
  • an increase in input costs met from NZDF resource reprioritisation ($67,000)
  • an expense transfer ($178,000) to 2011/12 for savings initiatives, and
  • an expense transfer ($223,000) to provide for a 2011/12 capital injection.

Miscellaneous Support Activities MCOA (M22)

Scope of Appropriation

Support to Limited Service Volunteer Scheme
This output class is limited to the conduct of Limited Service Volunteer courses for unemployed or disadvantaged youth, selected by the Ministry of Social Development, to encourage these youth towards employment.
Support to Mutual Assistance Programme (MAP)
This output class is limited to the provision of training, technical advice and resources to the defence forces and law enforcement agencies of participant countries under the Mutual Assistance Programme (MAP), both in New Zealand and in MAP countries.
Support to New Zealand Cadet Forces
This output class is limited to the provision of leadership and skills training for all approved New Zealand Cadet Force (NZCF) units.
Support to Service Military Museums
This output class is limited to collection development, collection management and exhibits related to New Zealand's military history.
Support to Youth Development
This output class is limited to New Zealand Defence Force support to government initiated youth development schemes in New Zealand, being the conduct of Limited Service Volunteer courses and contributions to Youth Life Skills programmes (Service Academies and Military-style Activity Camps).

Explanation for Use of Multi-Class Output Expense Appropriation

Outputs of a miscellaneous and disparate nature that do not individually justify separate Departmental Output Expense recognition have been grouped to provide for improved transparency and accountability.

Reasons for Change in Appropriation

This appropriation will increase by $1.217 million to $26.734 million for 2010/11. This increase relates to:

  • an increase of $422,000 in Support to Mutual Assistance Programme (MAP) input costs
  • a technical decrease of $1,000 as a result of asset revaluation for Support to New Zealand Cadet Forces
  • an increase of $157,000 in Support to New Zealand Cadet Forces input costs
  • a technical increase of $233,000 as a result of asset revaluation for Support to Service Military Museums
  • a decrease of $295,000 in Support to Service Military Museums input costs
  • a technical decrease of $12,000 as a result of asset revaluation for Support to Youth Development
  • an increase of $25,000 in Support to Youth Development input costs, and
  • an increase of $688,000 in Support to Youth Development to extend the Limited Service and Youth Life Skills programme.

Naval Combat Forces (M22)

Scope of Appropriation

Provision of the capabilities of the frigates, HMNZ Ships TE KAHA and TE MANA, prepared to conduct maritime operations and to contribute support services to the community, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will increase by $4.365 million to $402.504 million for 2010/11. This increase relates to:

  • a technical decrease as a result of asset revaluation ($1.679 million)
  • an expense transfer ($4.055 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase to provide for the government superannuation fund rate increase ($502,000)
  • an increase for the tax treatment of non operational allowances ($1.687 million)
  • an increase in input costs met from NZDF resource reprioritisation ($10.008 million)
  • an expense transfer ($3.768 million) to 2011/12 for savings initiatives
  • a decrease ($1.730 million) for a cross Vote initiative, and
  • an expense transfer ($4.710 million) to provide for a 2011/12 capital Injection.

Naval Helicopter Forces (M22)

Scope of Appropriation

Provision of the capabilities of No 6 Squadron RNZAF (Seasprite SH-2G helicopters) prepared to conduct maritime operations in support of other Output Expenses, especially the Naval Combat Forces, Naval Support Forces and Naval Patrol Forces, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will increase by $1.806 million to $89.745 million for 2010/11. This increase relates to:

  • a technical decrease as a result of asset revaluation ($381,000)
  • an expense transfer ($645,000) from 2009/10 as a result of 2010/11 operating pressures
  • an increase in input costs met from NZDF resource reprioritisation ($3.153 million)
  • an expense transfer ($716,000) to 2011/12 for savings initiatives, and
  • an expense transfer ($895,000) to provide for a 2011/12 capital injection.

Naval Patrol Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Offshore and Inshore Patrol Vessels (OPVs, IPVs) prepared for the conduct of maritime operations in support of Multi-Agency Operations and Tasks (MAO&T), and for the security and protection of New Zealand's economic border and EEZ, in accordance with NZDF Output Plan specifications. Once in service the OPVs will also be prepared to conduct sovereignty and resource protection patrol operations in the Southern Ocean, Ross Dependency, South Pacific region and further afield when directed.

Reasons for Change in Appropriation

This appropriation will decrease by $1.929 million to $125.523 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($427,000)
  • an expense transfer ($1.209 million) from 2009/10 as a result of 2010/11 operating pressures
  • a decrease for a cross Vote initiative ($47,000)
  • an increase in input costs met from NZDF resource reprioritisation ($356,000)
  • an expense transfer ($1.342 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($1.678 million) to provide for a 2011/12 capital injection.

Naval Support Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Fleet Replenishment Ship, HMNZS ENDEAVOUR, and the Multi-Role Vessel, HMNZS CANTERBURY, prepared to conduct maritime logistic support and amphibious sealift operations for deployed military forces, in accordance with NZDF Output Plan specifications. This output expense also includes contributions to a range of services provided to Government and the community.

Reasons for Change in Appropriation

This appropriation will decrease by $1.177 million to $104.849 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($484,000)
  • an expense transfer ($1.196 million) from 2009/10 as a result of 2010/11 operating pressures
  • a capital charge related increase ($249,000)
  • an increase in input costs met from NZDF resource reprioritisation ($848,000)
  • an expense transfer ($1.327 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($1.659 million) to provide for a 2011/12 capital injection.

Operationally Deployed Forces Annual (M22)

Scope of Appropriation

The provision of deployed force elements on military tasks, including the commitments agreed by Government under which the NZDF contributes to peace support and other operations conducted in support of the United Nations and other international agencies. It includes the provision of individuals, observers, advisers, instructors, headquarters staff, and complete force elements and contingents.

Reasons for Change in Appropriation

This appropriation will decrease by $151,000 to $78.295 million for 2010/11. This decrease relates to:

  • a technical increase as a result of asset revaluation ($11,000)
  • an expense transfer ($17 million) of a 2009/10 under spend to ensure the tagged funding remained available for future deployed force activity
  • a decrease for a cross Vote initiative ($162,000), and
  • an expense transfer ($17 million) from 2010/11 to 2011/12 for future deployed force activity.

Rotary Wing Transport Forces (M22)

Scope of Appropriation

Provision of the capabilities of No 3 Squadron RNZAF (Iroquois helicopters) prepared to conduct tactical air transport, including aeromedical evacuation, and counter-terrorist operations, and to contribute support services to the community, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will decrease by $8.963 million to $123.025 million for 2010/11. This decrease relates to:

  • a technical decrease as a result of asset revaluation ($517,000)
  • an expense transfer ($540,000) from 2009/10 as a result of 2010/11 operating pressures
  • a decrease in input costs identified for NZDF resource reprioritisation ($7.637 million)
  • an expense transfer ($600,000) to 2011/12 for savings initiatives, and
  • an expense transfer ($749,000) to provide for a 2011/12 capital injection.

Special Operations Forces (M22)

Scope of Appropriation

Provision of the capabilities of the Special Operations Forces prepared to conduct special forces operations in support of land operations, counter-terrorist operations, and the provision of Chemical, Biological, Radiological, Explosive, Improvised Explosive Device Disposal (CBRE IEDD) that threaten public safety or national interests, in accordance with NZDF Output Plan specifications.

Reasons for Change in Appropriation

This appropriation will increase by $2.379 million to $73.630 million for 2010/11. This increase relates to:

  • a technical decrease as a result of asset revaluation ($141,000)
  • an expense transfer ($1.036 million) from 2009/10 as a result of 2010/11 operating pressures
  • an increase in input costs met from NZDF resource reprioritisation ($4.072 million)
  • an expense transfer ($1.150 million) to 2011/12 for savings initiatives, and
  • an expense transfer ($1.438 million) to provide for a 2011/12 capital injection.

Part 5 - Details and Expected Results for Other Expenses

Part 5.1 - Departmental Other Expenses

Disposal of Decommissioned Assets (M22)

Scope of Appropriation

This appropriation is limited to the disposal costs of decommissioned assets.

Reasons for Change in Appropriation

This appropriation will increase by $500,000 to $500,000 in 2010/11. This increase relates to:

  • a technical increase ($1 million) to expense costs for the disposal of decommissioned assets, and
  • an expense transfer ($500,000) to 2011/12.

Maintenance of Assets Awaiting Sale (M22)

Scope of Appropriation

This appropriation is limited to costs necessary to keep assets awaiting sale in a saleable condition.

Reasons for Change in Appropriation

This appropriation will increase by $2.750 million to $2.750 million for 2010/11. This increase relates to:

  • a technical increase ($5 million) to expense costs for assets awaiting sale, and
  • an expense transfer ($2.250 million) to 2011/12.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

New Zealand Defence Force - Capital Expenditure PLA (M22)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the New Zealand Defence Force, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - New Zealand Defence Force Capital Expenditure PLA (M22) - Defence Force
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 569,914 (171,914) 398,000
Intangibles 3,000 (1,000) 2,000
Other - - -

Total Appropriation

572,914 (172,914) 400,000

Reasons for Change in Appropriation

This appropriation will decrease by $172.914 million to $400 million in 2010/11, mainly as a result of less than expected payments to the Ministry of Defence, for purchases of Specialist Military Equipment (SME).

Vote Economic Development

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Economic Development (M25), Minister for Industry and Regional Development (M39), Minister for Small Business (M62), Minister for the Rugby World Cup (M79)

ADMINISTERING DEPARTMENT: Ministry of Economic Development

MINISTER RESPONSIBLE FOR MINISTRY OF ECONOMIC DEVELOPMENT: Minister for Economic Development

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Economic Development
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Policy Advice - Small Business (M62)

This appropriation is limited to policy advice on issues relating to lifting the capability and performance of Small to Medium Enterprises (SMEs), including ministerial servicing and advice on the development, coordination and implementation of policies and programmes that affect SMEs.
1,531 1 1,532

Policy Advice and Sector Leadership - Firm Capability, Sectoral and Regional Development (M25)

This appropriation is limited to the purchase of policy advice, ministerial servicing and programme management for the development, evaluation and overview of economic, industry and regional development policies and initiatives to achieve short and long term economic growth and stability, and improving and leading the public sector procurement policy and practises.
19,431 7,582 27,013

Total Departmental Output Expenses

20,962 7,583 28,545

Non-Departmental Output Expenses

     

Analysis and Development Services for Firms (M25)

The appropriation is limited to customised advice and support to firms based on analysis of opportunities, issues and risks facing them in their growth and internationalisation, including advice and support for firms to access business assistance grants.
16,242 4,204 20,446

Canterbury Earthquake Recovery Commission (M25)

This appropriation is limited to the payment of fees and reimbursement of expenses to the four appointed commissioners of the Canterbury Earthquake Recovery Commission.
- 350 350

Identification and Coordination of International Market Opportunities (M25)

This appropriation is limited to the identification and coordination of international market opportunities for firms through market analysis and intelligence, facilitation into international business networks and marketing and support of New Zealand's presence at significant international events.
69,450 10,963 80,413

International Investment Facilitation Services (M25)

This appropriation is limited to coordination and analysis of opportunities for investment into New Zealand and investment by New Zealand firms into international markets.
13,613 (3) 13,610

Investment Fund Management (M25)

Operational costs of the Venture Investment and Seed Co-investment Funds.
2,330 - 2,330

Regional and Sector Development Services (M25)

This appropriation is limited to customised advice and support to regional institutions for the development of regional economic development strategies, and to sectoral industry bodies and groups of firms for the development and implementation of plans to improve the performance of sectors.
39,022 (7,649) 31,373

Rugby World Cup (M79)

This appropriation is limited to performance of the functions relating to the Rugby World Cup Authority.
- 2,492 2,492

Stadium Development (GST component) (M39)

GST on preliminary work and pre-staging activities associated with the Eden Park project.
- 27,873 27,873

Standardised Training and Advisory Services (M25)

This appropriation is limited to standardised training and advisory services provided by third parties to firms on a range of business development needs including business incubation, capital acquisition, finance brokering and exporting.
15,565 (4,156) 11,409

Total Non-Departmental Output Expenses

156,222 34,074 190,296

Non-Departmental Other Expenses

     

Canterbury Earthquake Recovery - Business Support (M25)

This appropriation is limited to providing support for the recovery of businesses affected by the Canterbury Earthquake.
- 4,050 4,050

Depreciation on Auckland's Queens Wharf (M25)

This appropriation is limited to depreciation expenses associated with Auckland's Queens Wharf.
- 2,000 2,000

Establishment and operation of the Food Innovation Network New Zealand (M25)

This appropriation is limited to the establishment and operation of the Food Innovation Network New Zealand.
9,015 5,765 14,780

Film New Zealand (M25)

Operation of an independent structure for Film NZ, development of a marketing plan for the film sector and coordination of regional film offices.
833 - 833

International Biotechnology Partnerships (M25)

Facilitation of joint ventures between Australia and New Zealand companies in biotechnology development, manufacturing and marketing.
1,700 (1,700) -

International Growth Fund (M25)

This appropriation is limited to support for high growth firms to undertake additional market development and business capability activities required for growth in new markets, that deliver benefits for both the firm and the wider New Zealand economy.
30,027 (10,000) 20,027

Large Budget Screen Production Fund (M25)

Assistance to film and television productions that spend over $15 million in New Zealand.
35,556 91,724 127,280

Major Events Development Fund (M25)

Support for major events that provide economic, social, cultural and international profiling benefits to New Zealand.
5,821 4,529 10,350

Management Development Fund (M25)

Assistance to address the management capability gap in New Zealand, through the commissioning of research, stimulation of business interest and supply of management development services.
756 (249) 507

Promotion of New Zealand Associated with the America's Cup (M25)

This appropriation is limited to meeting costs associated with the proposed sponsorship of Team New Zealand's participation in the next multi-challenger America's Cup.
18,250 (16,250) 2,000

Regional and Industry Development Fund (M25)

Support of industry and regional specific projects that are likely to have the ability to contribute to government economic objectives and to unlock high growth potential, including support of Buy Kiwi Made sectoral and regional initiatives.
600 - 600

Regional Partnerships and Facilitation (M25)

Provision of advice and grants to support the development of business incubators and regional clusters, and to support regional partnerships to develop and implement sustainable economic growth strategies.
8,613 (4,057) 4,556

Rugby World Cup Free-to-Air Broadcasting Right (M79)

This appropriation is limited to meeting the government contribution to the joint bid by the Maori Television Service, Television New Zealand and Mediaworks for the Rugby World Cup free-to-air broadcasting right.
1,600 - 1,600

Sector Strategies and Facilitation (M25)

Assistance with the facilitation of specific sector initiatives, particularly in the areas of major events, pre-feasibility and feasibility studies and guarantees for significant projects to access funding through other government programmes and cash grants.
1,204 - 1,204

Square Kilometre Array (M25)

This appropriation is limited to supporting New Zealand's contribution to the joint bid with Australia to host the Square Kilometre Array.
1,000 - 1,000

Total Non-Departmental Other Expenses

114,975 75,812 190,787

Departmental Capital Expenditure

     

Ministry of Economic Development - Capital Expenditure PLA (M25)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Economic Development, as authorised by section 24(1) of the Public Finance Act 1989.
5,400 10,482 15,882

Total Departmental Capital Expenditure

5,400 10,482 15,882

Non-Departmental Capital Expenditure

     

New Zealand Trade and Enterprise (M25)

To increase NZTE's in-market assistance for New Zealand firms in China, India and Japan.
147 - 147

Seed Co-investment Fund (M25)

Support the development of the market for early stage equity finance.
8,000 1,300 9,300

Temporary Rugby World Cup showcase and festival building on Auckland's Queens Wharf (M25)

This appropriation is limited to the construction and removal of a temporary Rugby World Cup showcase and festival building on Auckland's Queens Wharf.
- 8,000 8,000

Venture Investment Fund (M25)

Capital Investment to accelerate the development of the New Zealand Venture Capital Market. Public funds will be co-invested with the private sector to increase the rate of formation of new businesses based on high added value goods and services.
- 19,350 19,350

Total Non-Departmental Capital Expenditure

8,147 28,650 36,797

Total Annual and Permanent Appropriations

305,706 156,601 462,307

Details of Multi-Year Appropriations

Multi-Year Appropriations - Economic Development
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Non-Departmental Output Expenses

   

New Zealand's Participation at Expo 2010 Shanghai, China (M25)

This appropriation is limited to New Zealand's participation at Expo 2010 in Shanghai, China.

Commences: 1 July 2008

Expires: 30 June 2011

Original Appropriation 26,600
Adjustments for 2009/10 9,756
Adjustments to 2010/11 (2,600)
Adjusted Appropriation 33,756
Actual to 2009/10 Year End 23,179
Estimated Actual for 2010/11 10,577
Estimated Actual for 2011/12 -
Estimated Appropriation Remaining -

Non-Departmental Other Expenses

   

Rugby World Cup Leverage and Legacy Programmes (M25)

This appropriation is limited to the provision of Rugby World Cup leverage and legacy programmes (both offshore and onshore).

Commences: 1 July 2010

Expires: 30 June 2012

Original Appropriation 11,250
Adjustments for 2009/10 -
Adjustments to 2010/11 1,000
Adjusted Appropriation 12,250
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 5,750
Estimated Actual for 2011/12 6,500
Estimated Appropriation Remaining -

Transformational Initiatives Fund (M25)

Funding for the implementation of policy on transformational initiatives as agreed by Cabinet.

Commences: 1 March 2009

Expires: 30 June 2013

Original Appropriation 9,766
Adjustments for 2009/10 520
Adjustments to 2010/11 (3,500)
Adjusted Appropriation 6,786
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 3,986
Estimated Actual for 2011/12 1,100
Estimated Appropriation Remaining 1,700

Details of Projected Movements in Departmental
Net Assets

Ministry of Economic Development

Ministry of Economic Development - Details of Projected Movements in Departmental Net Assets - Economic Development
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 26,742 24,918 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections 3,400 12,500  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) (3,000) (3,000)  
Other Movements - -  

Closing Balance

27,142 34,418  

Information Supporting the Supplementary Estimates Vote Economic Development

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Economic Development (M25), Minister for Industry and Regional Development (M39), Minister for Small Business (M62), Minister for the Rugby World Cup (M79)

ADMINISTERING DEPARTMENT: Ministry of Economic Development

MINISTER RESPONSIBLE FOR MINISTRY OF ECONOMIC DEVELOPMENT: Minister for Economic Development

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Economic Development
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 182,144 7,583 39,691 47,274 229,418
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 122,795 - 78,228 78,228 201,023
Capital Expenditure 13,547 10,482 28,650 39,132 52,679
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

318,486 18,065 146,569 164,634 483,120

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Policy Advice - Small Business (M62)

Scope of Appropriation

This appropriation is limited to policy advice on issues relating to lifting the capability and performance of Small to Medium Enterprises (SMEs), including ministerial servicing and advice on the development, coordination and implementation of policies and programmes that affect SMEs.

Expenses and Revenue

Expenses and Revenue - Policy Advice Small Business (M62) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 1,531 1 1,532
Revenue from Crown 1,506 1 1,507
Revenue from Other 25 - 25

Reasons for Change in Appropriation

This appropriation increased by $1,000 to reflect the increase in the GSF non-funding employer contribution rates.

Policy Advice and Sector Leadership - Firm Capability, Sectoral and Regional Development (M25)

Scope of Appropriation

This appropriation is limited to the purchase of policy advice, ministerial servicing and programme management for the development, evaluation and overview of economic, industry and regional development policies and initiatives to achieve short and long term economic growth and stability, and improving and leading the public sector procurement policy and practises.

Expenses and Revenue

Expenses and Revenue - Policy Advice and Sector Leadership Firm Capability, Sectoral and Regional Development (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 19,431 7,582 27,013
Revenue from Crown 19,109 1,982 21,091
Revenue from Other 322 5,600 5,922

Reasons for Change in Appropriation

This appropriation increased by $8.082 million as a result of:

  • funding of $5.600 million to reflect a Cabinet decision relating to the "Government Procurement Reform Agenda - Year One Outcomes and Future Reform Programme" paper
  • funding of $1.250 million to reflect a Cabinet decision relating to the "Canterbury Earthquake National Level Co-ordination Mechanisms" paper
  • expense transfers from 2009/10 of $1.012 million to reflect the delays for the following projects:
    • "Wine to the World" and "Access to Ohakea" - $350,000
    • ongoing development and management of a Volunteer website for events - $260,000
    • Government's procurement reform training initiatives - $208,000
    • Auckland's research programme - $163,000, and
    • Cross Departmental Research Pool funded project - $31,000.
  • funding of $184,000 to reflect a Cabinet decision relating to the "Rugby World Cup 2011 (Empowering) Act 2010: Proposed Regulations" paper, and
  • GSF non-funding employer contribution increase in rates of $36,000.

These increases are partially offset by a decrease of $500,000 transferred to Vote Canterbury Earthquake Recovery.

Part 2.2 - Non-Departmental Output Expenses

Analysis and Development Services for Firms (M25)

Scope of Appropriation

The appropriation is limited to customised advice and support to firms based on analysis of opportunities, issues and risks facing them in their growth and internationalisation, including advice and support for firms to access business assistance grants.

Expenses

Expenses - Analysis and Development Services for Firms (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 16,242 4,204 20,446

Reasons for Change in Appropriation

This appropriation increased by $4.204 million as a result of:

  • $4.200 million fiscal neutral adjustment in the Primary Sector Initiatives, Business Opportunities in Australia and Support for export-focused firms, and
  • $4,000 as a result of a foreign exchange movement adjustment.

Canterbury Earthquake Recovery Commission (M25)

Scope of Appropriation

This appropriation is limited to the payment of fees and reimbursement of expenses to the four appointed commissioners of the Canterbury Earthquake Recovery Commission.

Expenses

Expenses - Canterbury Earthquake Recovery Commission (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 350 350

Reasons for Change in Appropriation

This appropriation was established during 2010/11 as a result of a Cabinet decision relating to the "Canterbury Earthquake National Level Co-ordination Mechanisms" paper.

Output Performance Measures and Standards

Output Performance Measures and Standards - Canterbury Earthquake Recovery Commission (M25) - Economic Development
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Commissioners are appointed and managed in accordance with the Canterbury Earthquake Response and Recovery Act 2010 and the Canterbury Earthquake Recovery Commission: Terms of Reference. 100% achieved 100% achieved 100% achieved

Identification and Coordination of International Market Opportunities (M25)

Scope of Appropriation

This appropriation is limited to the identification and coordination of international market opportunities for firms through market analysis and intelligence, facilitation into international business networks and marketing and support of New Zealand's presence at significant international events.

Expenses

Expenses - Identification and Coordination of International Market Opportunities (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 69,450 10,963 80,413

Reasons for Change in Appropriation

This appropriation increased by $10.963 million as a result of:

  • $5.500 million funding through a fiscal neutral adjustment relating to the Primary Sector Initiatives, Business Opportunities in Australia and Support for export-focused firms
  • $2.140 million reflecting the Cabinet decision relating to the "Supporting the Delivery of a Successful Rugby World Cup 2011" paper
  • $2 million transfer from the Standardised Training and Advisory Services appropriation to assist with New Zealand exporters' operations based in Christchurch following the 22 February earthquake via the Christchurch Market Connections Fund
  • expense transfer of $1.100 million from 2009/10 to reflect the delays in leveraging the Shanghai Expo
  • transfer of $179,000 from Vote Foreign Affairs and Trade to assist with WTO and FTA/CEP negotiations, and
  • $44,000 through a foreign exchange movement adjustment.

International Investment Facilitation Services (M25)

Scope of Appropriation

This appropriation is limited to coordination and analysis of opportunities for investment into New Zealand and investment by New Zealand firms into international markets.

Expenses

Expenses - International Investment Facilitation Services (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 13,613 (3) 13,610

Reasons for Change in Appropriation

This appropriation decreased by $3,000 as a result of foreign exchange movement adjustments.

New Zealand's Participation at Expo 2010 Shanghai, China (M25)

Scope of Appropriation and Expenses

Multi-Year Appropriations - Economic Development
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Non-Departmental Output Expenses

   

New Zealand's Participation at Expo 2010 Shanghai, China (M25)

This appropriation is limited to New Zealand's participation at Expo 2010 in Shanghai, China.

Commences: 1 July 2008

Expires: 30 June 2011

Original Appropriation 26,600
Adjustments for 2009/10 9,756
Adjustments to 2010/11 (2,600)
Adjusted Appropriation 33,756
Actual to 2009/10 Year End 23,179
Estimated Actual for 2010/11 10,577
Estimated Actual for 2011/12 -
Estimated Appropriation Remaining -

Reasons for Change in Appropriation

This appropriation increased by $8.217 million as a result of an expense transfer of 2009/10 unspent funds.

Regional and Sector Development Services (M25)

Scope of Appropriation

This appropriation is limited to customised advice and support to regional institutions for the development of regional economic development strategies, and to sectoral industry bodies and groups of firms for the development and implementation of plans to improve the performance of sectors.

Expenses

Expenses - Regional and Sector Development Services (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 39,022 (7,649) 31,373

Reasons for Change in Appropriation

This appropriation decreased by $7.649 million as a result of:

  • transfer of $9.544 million to other non-departmental expense appropriations to assist with the Primary Sector Initiatives, Business Opportunities in Australia and Support for export-focused firms, and
  • $590,000 transferred to the non-departmental output expense appropriation: Identification and Coordination of International Market Opportunities to reflect a Cabinet decision relating to the "Supporting the Delivery of a Successful Rugby World Cup 2011" initiative.

These decreases are partially offset by the following increases:

  • expense transfer of $2.474 million from 2009/10 to reflect the delay in completing the Food and Beverage Taskforce initiatives, and
  • $11,000 through foreign exchange adjustments.

Rugby World Cup (M79)

Scope of Appropriation

This appropriation is limited to performance of the functions relating to the Rugby World Cup Authority.

Expenses

Expenses - Rugby World Cup (M79) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 2,492 2,492

Reasons for Change in Appropriation

This appropriation was established during 2010/11 as a result of a Cabinet decision relating to the "Rugby World Cup 2011 (Empowering) Act 2010: Proposed Regulations" paper.

Output Performance Measures and Standards

Output Performance Measures and Standards - Rugby World Cup (M79) - Economic Development
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
The Rugby World Cup Authority is established and performs its functions under the Rugby World Cup 2011 (Empowering) Act 2010. 100% achieved 100% achieved 100% achieved

Conditions on Use of Appropriation

Conditions on Use of Appropriation - Rugby World Cup (M79) - Economic Development
Reference Conditions
Ministry of Economic Development Rugby World Cup 2011 (Empowering) Act 2010

Stadium Development (GST component) (M25)

Scope of Appropriation

GST on preliminary work and pre-staging activities associated with the Eden Park project.

Expenses

Expenses - Stadium Development (GST component) (M39) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 27,873 27,873

Reasons for Change in Appropriation

This appropriation incurred a one-off cost of $27.873 million as a result of milestones being met by the Eden Park Redevelopment Board (EPRB) via a loan agreement with the Crown. Upon EPRB meeting these milestones, the loan would be forgiven and that it would become revenue to the EPRB and the GST would be payable. The Crown needs to fund this GST component as an Input Tax and the EPDB will be paying the Output Tax to the Inland Revenue Department. This impact is therefore neutral to the Crown.

Standardised Training and Advisory Services (M25)

Scope of Appropriation

This appropriation is limited to standardised training and advisory services provided by third parties to firms on a range of business development needs including business incubation, capital acquisition, finance brokering and exporting.

Expenses

Expenses - Standardised Training and Advisory Services (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 15,565 (4,156) 11,409

Reasons for Change in Appropriation

This appropriation decreased by $4.156 million as a result of:

  • $6 million being transferred to the non-departmental output expense appropriation: Identification and Coordination of International Market Opportunities to reflect:
    • a Cabinet decision for funding of $4 million to assist with the "Supporting the Delivery of a Successful Rugby World Cup 2011" initiative, and
    • a transfer of $2 million to the Identification and Coordination of International Market Opportunities appropriation to assist with New Zealand exporters' operations based in Christchurch following the 22 February earthquake via the Christchurch Market Connections Fund.

This decrease is partially offset by the following increases:

  • $1.244 million transferred to assist with the Primary Sector Initiatives, Business Opportunities in Australia and Support for export-focused firms, and
  • expense transfer of $600,000 from 2009/10 to reflect the delays in the "Deferral of Global Mindset" project.

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Canterbury Earthquake Recovery - Business Support (M25)

Scope of Appropriation

This appropriation is limited to providing support for the recovery of businesses affected by the Canterbury Earthquake.

Expenses

Expenses - Canterbury Earthquake Recovery Business Support (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 4,050 4,050

Reasons for Change in Appropriation

This appropriation was established during 2010/11 as a result of a Cabinet decision relating to the "Canterbury Earthquake Business Support Package: Capability Development, Promotions and RWC Support" and "Christchurch Earthquake - Short to Medium Term Business Support Measures" papers.

Expected Results

Expected Results - Canterbury Earthquake Recovery Business Support (M25) - Economic Development
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Following the Canterbury earthquakes that occurred on 4 September 2010 and 22 February 2011, business recovery support packages were developed and made available to affected businesses, in conjunction with Canterbury Employers' Chamber of Commerce and Canterbury Development Corporation. 100% achieved 100% achieved 100% achieved

Depreciation on Auckland's Queens Wharf (M25)

Scope of Appropriation

This appropriation is limited to depreciation expenses associated with Auckland's Queens Wharf.

Expenses

Expenses - Depreciation on Auckland's Queens Wharf (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 2,000 2,000

Reasons for Change in Appropriation

This appropriation was established during 2010/11 to reflect the Cabinet decision relating to the "Queens Wharf Development" paper.

Expected Results

Expected Results - Depreciation on Auckland's Queens Wharf (M25) - Economic Development
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
This appropriation is a technical requirement and reflects the depreciation expense associated with the Rugby World Cup (RWC) showcase and festival building asset base Recognised in accordance with Crown accounting policies Recognised in accordance with Crown accounting policies Recognised in accordance with Crown accounting policies

Establishment and operation of the Food Innovation Network New Zealand (M25)

Scope of Appropriation

This appropriation is limited to the establishment and operation of the Food Innovation Network New Zealand.

Expenses

Expenses - Establishment and operation of the Food Innovation Network New Zealand (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 9,015 5,765 14,780

Reasons for Change in Appropriation

This appropriation increased by $5.765 million as a result of:

  • an expense transfer of $4.865 million from 2009/10 unspent funds, and
  • $900,000 funding to reflect a Cabinet decision relating to the "Scaled Up Proposal for the Waikato Food Innovation Hub" paper.

International Biotechnology Partnerships (M25)

Scope of Appropriation

Facilitation of joint ventures between Australia and New Zealand companies in biotechnology development, manufacturing and marketing.

Expenses

Expenses - International Biotechnology Partnerships (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 1,700 (1,700) -

Reasons for Change in Appropriation

This appropriation has decreased by $1.700 million as a result of:

  • $1 million transfer to assist with the Rugby World Cup Legacy programme (MYA)
  • 600,000 to reflect a Cabinet decision relating to the "Canterbury Earthquake Business Support Package" paper, transferring this amount to the non-departmental output expense: Canterbury Earthquake Recovery Commission appropriation, and
  • $100,000 in savings returned to the Crown.

International Growth Fund (M25)

Scope of Appropriation

This appropriation is limited to support for high growth firms to undertake additional market development and business capability activities required for growth in new markets, that deliver benefits for both the firm and the wider New Zealand economy.

Expenses

Expenses - International Growth Fund (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 30,027 (10,000) 20,027

Reasons for Change in Appropriation

This appropriation decreased by $10 million as a result:

  • $5 million reprioritised to Square Kilometre Array, Rugby World Cup and Procurement
  • $2.957 million in savings returned to the Crown, and
  • $2.043 million to reflect a Cabinet decision relating to the "Canterbury Earthquake Business Support Package" paper, transferring this amount to the non-departmental other expense: Canterbury Earthquake Recovery - Business Support appropriation.

Large Budget Screen Production Fund (M25)

Scope of Appropriation

Assistance to film and television productions that spend over $15 million in New Zealand.

Expenses

Expenses - Large Budget Screen Production Fund (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 35,556 91,724 127,280

Reasons for Change in Appropriation

This appropriation has increased by $91.724 million as a result of:

  • forecast adjustment of $71.104 million for the Cabinet decision relating to the "Issues Concerning New Zealand as the Possible Location for the Filming of The Hobbit" paper
  • $20.037 million to reflect a Cabinet decision relating to the "Warner Brothers Memorandum of Understanding" paper, and
  • expense transfer of $583,000 from 2009/10 unspent funds.

Major Events Development Fund (M25)

Scope of Appropriation

Support for major events that provide economic, social, cultural and international profiling benefits to New Zealand.

Expenses

Expenses - Major Events Development Fund (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 5,821 4,529 10,350

Reasons for Change in Appropriation

This appropriation increased by $4.529 million as a result of:

  • $6.679 million to reflect a Cabinet decision relating to the "Increasing the Benefit to New Zealand from Major Events" paper, and
  • expense transfer of $2.500 million from 2009/10 to reflect the delays in the work relating to the Volunteers Programme - RWC 2011.

This is partially offset by the following decreases of:

  • $4 million expense transfer to 2011/12 to reflect the delays in the funding application process for Major Event initiatives, and
  • $650,000 transferred to Vote Sport and Recreation to reflect a Cabinet decision relating to the "World Rowing Championships 2010 (Karapiro 2010 Ltd) Loan" paper.

Management Development Fund (M25)

Scope of Appropriation

Assistance to address the management capability gap in New Zealand, through the commissioning of research, stimulation of business interest and supply of management development services.

Expenses

Expenses - Management Development Fund (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 756 (249) 507

Reasons for Change in Appropriation

This appropriation decreased by $249,000 as a result of a $600,000 expense transfer to 2011/12 to reflect the delays in the Prime Minister's Business Scholarships programme.

This is partially offset by the following increases:

  • expense transfer of $316,000 from 2009/10 to reflect the delays in the PLATO Business Pilot programme, and
  • expense transfer of $35,000 from 2009/10 to reflect the delay in funding the Prime Minister's Business Scholarships.

Promotion of New Zealand Associated with the America's Cup (M25)

Scope of Appropriation

This appropriation is limited to meeting costs associated with the proposed sponsorship of Team New Zealand's participation in the next multi-challenger America's Cup.

Expenses

Expenses - Promotion of New Zealand Associated with the America's Cup (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 18,250 (16,250) 2,000

Reasons for Change in Appropriation

This appropriation decreased by $16.250 million as a result of an expense transfer of $19.750 million to 2011/12 reflecting the delay in the America's Cup. This is partially offset by an increase of $3.500 million as a result of an expense transfer from 2009/10.

Regional Partnerships and Facilitation (M25)

Scope of Appropriation

Provision of advice and grants to support the development of business incubators and regional clusters, and to support regional partnerships to develop and implement sustainable economic growth strategies.

Expenses

Expenses - Regional Partnerships and Facilitation (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 8,613 (4,057) 4,556

Reasons for Change in Appropriation

This appropriation decreased by $4.057 million as a result of:

  • $2.157 million funding relating to a Cabinet decision for the "Canterbury Earthquake: Short to Medium Term Business Support Measures" paper
  • $1 million funding relating to a Cabinet decision for the "Canterbury Earthquake Business Support Package: Capability Development, Promotions and RWC Support" paper
  • $1 million to assist with the Primary Sector Initiatives, Business Opportunities in Australia and Support for export-focused firms, and
  • $900,000 transfer to the non-departmental output other expense: Establishment and Operation of Food Innovation New Zealand appropriation, relating to the Cabinet decision for the "Scaled Up Proposal for the Waikato Food Innovation Hub" paper.

These decreases were partially offset by the following increases:

  • expense transfer of $800,000 from 2009/10 to reflect the delays in the expansion of the Primary Sector initiatives work, and
  • expense transfer of $200,000 from 2009/10 to reflect the delays in the redevelopment of the Project Link website.

Rugby World Cup Leverage and Legacy Programmes (M25)

Scope of Appropriation and Expenses

Multi-Year Appropriations - Economic Development
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Non-Departmental Other Expenses

   

Rugby World Cup Leverage and Legacy Programmes (M25)

This appropriation is limited to the provision of Rugby World Cup leverage and legacy programmes (both offshore and onshore).

Commences: 1 July 2010

Expires: 30 June 2012

Original Appropriation 11,250
Adjustments for 2009/10 -
Adjustments to 2010/11 1,000
Adjusted Appropriation 12,250
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 5,750
Estimated Actual for 2011/12 6,500
Estimated Appropriation Remaining -

Reasons for Change in Appropriation

This appropriation increased by $1 million as a result of:

  • $250,000 transfer from the non-departmental other expense: International Biotechnology Partnerships appropriation to assist with the Rugby World Cup legacy programme.

Transformational Initiatives Fund (M25)

Scope of Appropriation and Expenses

Multi-Year Appropriations - Economic Development
Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Non-Departmental Other Expenses

   

Transformational Initiatives Fund (M25)

Funding for the implementation of policy on transformational initiatives as agreed by Cabinet.

Commences: 1 March 2009

Expires: 30 June 2013

Original Appropriation 9,766
Adjustments for 2009/10 520
Adjustments to 2010/11 (3,500)
Adjusted Appropriation 6,786
Actual to 2009/10 Year End -
Estimated Actual for 2010/11 3,986
Estimated Actual for 2011/12 1,100
Estimated Appropriation Remaining 1,700

Reasons for Change in Appropriation

This appropriation reduced by $3.500 million as result of a transfer to the Regional and Industry Development Fund appropriation to assist with the contribution to the "West Coast Economic Support Package" initiative.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Ministry of Economic Development - Capital Expenditure PLA (M25)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Economic Development, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Ministry of Economic Development Capital Expenditure PLA (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 3,500 (947) 2,553
Intangibles 1,900 11,429 13,329
Other - - -

Total Appropriation

5,400 10,482 15,882

Reasons for Change in Appropriation

This appropriation increased by $10.482 million as a result of the following:

  • capital expenditure PLA update in 2010/11 OBU for all projects - $3 million
  • capital expenditure PLA forecast change in 2010/11 Supplementary's for all projects - $3.982 million
  • capital transfer from 2009/10 to reflect the delays in the Emissions Trading Scheme project - $3.500 million, and
  • capital transfer from 2009/10 to reflect the delays in the Compass project - $4.500 million.

These increases have been offset by the following decreases:

  • transfer of $2 million to 2011/12 to reflect the delays in the Emissions Trading Scheme project
  • transfer of $2 million to 2011/12 to reflect the delays in the Compass project, and
  • technical adjustment of $500,000 to correct an entry processed in error via the 2010 October Baseline Update for the Compass project.

Part 6.2 - Non-Departmental Capital Expenditure

Seed Co-investment Fund (M25)

Scope of Appropriation

Support the development of the market for early stage equity finance.

Capital Expenditure

Capital Expenditure - Seed Coinvestment Fund (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 8,000 1,300 9,300

Reasons for Change in Appropriation

This appropriation increased by $1.300 million as a result of a $16.988 million capital transfer of 2009/10 unspent funds. This was partially offset by a technical adjustment of $15.688 million to reflect the correct phasing of this fund in this year and in the outyears.

Temporary Rugby World Cup showcase and festival building on Auckland's Queens Wharf (M25)

Scope of Appropriation

This appropriation is limited to the construction and removal of a temporary Rugby World Cup showcase and festival building on Auckland's Queens Wharf.

Capital Expenditure

Capital Expenditure - Temporary Rugby World Cup showcase and festival building on Auckland's Queens Wharf (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 8,000 8,000

Reasons for Change in Appropriation

This appropriation was established during the 2010/11 year to reflect the Cabinet decision on the "Queens Wharf Development" paper.

Expected Results

Expected Results - Temporary Rugby World Cup showcase and festival building on Auckland's Queens Wharf (M25) - Economic Development
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
'Cloud' structure designed, construction commenced and project completed to timeline and budget. Met Met Met

Venture Investment Fund (M25)

Scope of Appropriation

Capital Investment to accelerate the development of the New Zealand Venture Capital Market. Public funds will be co-invested with the private sector to increase the rate of formation of new businesses based on high added value goods and services.

Capital Expenditure

Capital Expenditure - Venture Investment Fund (M25) - Economic Development
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 19,350 19,350

Reasons for Change in Appropriation

This appropriation has been reactivated as a result of a capital transfer of $66.968 million of 2009/10 unspent funds, which is partially offset by a decrease of $47.618 million as a result of a technical adjustment to reflect the correct phasing of this fund in this year and in the outyears.

Vote Education

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Education (M26), Minister for Tertiary Education (M68)

ADMINISTERING DEPARTMENT: Ministry of Education

MINISTER RESPONSIBLE FOR MINISTRY OF EDUCATION : Minister of Education

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Education
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Interventions for Target Student Groups (M26)

Expenditure on policies and services focused on targeted student groups' or individuals' participation in education. This includes providing services to individuals with special education and developmental needs, providing additional funding for the support of students with special education needs, providing alternative education options, working with individuals and relevant stakeholders to resolve participation issues, and administering scholarships and awards for individuals.
237,396 4,998 242,394

School Property Portfolio Management (M26)

Expenditure on goods and services focused on providing the land, buildings and other facilities that make up the property portfolio of the State school sector. This includes purchasing and constructing new property, upgrading existing property to maintain the quality of the portfolio, disposing of surplus property, and managing teacher and caretaker housing.
1,364,193 (105,786) 1,258,407

Strategic Leadership in the Sector (M26)

Expenditure on policies and services focused on the Ministry's leadership role in the education sector. This includes enhancing the Ministry's coordination with other sector and Government agencies and forums, undertaking research and analysis, developing sector policy, monitoring the sector and select crown entities, and supporting the Minister of Education and Associate Minister to meet their obligations to Parliament.
31,476 2,605 34,081

Strategic Leadership in the Tertiary System (M68)

Expenditure on policies and services focused on the Ministry's leadership role in the tertiary system. This includes enhancing coordination with sector and Government agencies and forums, undertaking research and analysis, developing sector policy, monitoring the system, providing information on tertiary and international education services, representing the education sector internationally, supporting international students, and supporting Ministers to meet their obligations to Parliament.
13,890 2,402 16,292

Support and Resources for Education Providers (M26)

Expenditure on policies, regulations and services focused on the governance, management and operation of education providers. This includes managing regulations, administering the distribution of resources, delivering services that support school management - including industrial relations and education payroll, and working with providers to resolve underperformance.
85,669 (10,917) 74,752

Support and Resources for Teachers (M26)

Expenditure on policies and services focused on supporting the work and enhancing the capability of teachers. This includes providing curriculum and achievement standards, teaching resources, professional development, and administering scholarships and awards for existing teachers and principals.
59,528 3,522 63,050

Support and Resources for the Community (M26)

Expenditure on policies and programmes focused on the community's knowledge of and participation in the education system. This includes engaging with, providing information and support to, and delivering education courses to the community.
14,378 (813) 13,565

Total Departmental Output Expenses

1,806,530 (103,989) 1,702,541

Non-Departmental Output Expenses

     

Centres of Research Excellence (M68)

Purchase of cooperative and collaborative tertiary research in areas of research strength in the tertiary education sector through the contestable Centres of Research Excellence Fund.
33,488 - 33,488

Curriculum Support (M26)

Purchase of supplementary educational programmes for schools and communities to ensure wider access to these opportunities.
65,207 (1,372) 63,835

Education Research Initiatives (M26)

Purchase of research about teaching and learning in our educational institutions and independent research on education issues, policies and practices.
2,980 28 3,008

International Education Programmes (M68)

This appropriation is limited to delivery of services in respect to international education, including promotion, information, research and professional development, both in New Zealand and overseas, for the purpose of managing and increasing the flow of international students and promoting international education linkages.
6,006 - 6,006

Managing the Government's Investment in the Tertiary Education Sector (M68)

This appropriation is limited to developing, implementing and managing an investment system that aligns planning, funding, monitoring and quality assurance of tertiary education in accordance with the provisions of the Education Act 1989 and other relevant legislation.
34,530 1,550 36,080

Ownership Monitoring of Tertiary Education Institutions (M68)

This appropriation is limited to monitoring and advisory services - including interventions - on the government's ownership interest in tertiary education institutions.
2,567 - 2,567

Professional Development and Support (M26)

Delivery of professional development and advisory support to staff, managers and parents in early childhood education services and in schools, to support effective teaching and enhance self-management.
91,385 - 91,385

Provision of Information and Advisory Services (M26)

Providing information on government education policy and programmes, general information, advisory programmes, and services to the public, community groups, industry and the education community.
22,342 205 22,547

Qualifications Support Structures (M26)

Provision for the New Zealand Qualifications Authority to oversee the setting of standards and standards based qualifications. It also includes standard-setting responsibility, recognition and review of qualifications, records management processes to support the Register of Quality Assured Qualifications and National Qualifications Framework, and participation in the promotion of the New Zealand National Qualifications system to key education and immigration partner countries.
6,049 13 6,062

Quality Assurance (M26)

Provision for the New Zealand Qualifications Authority to provide quality assurance services to support the New Zealand qualifications system that include ongoing development and management of quality assurance processes, monitoring and supporting providers at risk and the ongoing refinement and maintenance of the quality assurance framework.
4,370 - 4,370

School Transport (M26)

Purchase of services to transport eligible students to and from State and integrated schools. Also included are payments to schools that manage their own transport services and payments to parents/caregivers to compensate for the costs of taking children to school where other transport services are unsuitable or unavailable.
160,272 1,906 162,178

Secondary School Assessments (M26)

Provision for the New Zealand Qualifications Authority to oversee assessment for national secondary school qualifications including the National Certificate of Educational Achievement and Scholarship examinations, and the moderation of internal and external school assessments.
26,480 - 26,480

Service Academies (M26)

This appropriation is limited to providing military-focused programmes for disengaged or disengaging senior students in secondary schools.
1,440 - 1,440

Supporting Parenting (M26)

This appropriation is limited to purchasing delivery of specific programmes, and providing advice and support which enhance the role of parents/caregivers in the development of their children and promote the value of quality education experiences.
5,258 (1,490) 3,768

Tertiary Education and Training Policy Advice (M68)

This appropriation is limited to providing advice and support to Ministers on the tertiary sector and tertiary education and training issues.
5,637 (1,091) 4,546

Tertiary Education: Student Achievement Component (M68)

This appropriation is limited to teaching and learning services for enrolled students in approved courses at tertiary education organisations to achieve recognised tertiary qualifications.
1,827,487 7,381 1,834,868

Training for Designated Groups (M68)

Purchasing training linked to the National Qualifications Framework and the purchase of both on-job and off-job training places including delivery of fully or partially funded training places.
304,407 (35,900) 268,507

Total Non-Departmental Output Expenses

2,599,905 (28,770) 2,571,135

Benefits and Other Unrequited Expenses

     

Boarding Allowances and Bursaries (M26)

Provides an annual allowance to subsidise boarding fees and some travel costs of primary and secondary students who must live away from home to receive their education, either because of the distance of the nearest school or bus service from their home, or because certain approved subjects are not available at their local school. Bursaries are awarded according to the School Boarding Bursaries Regulations 1972.
8,069 - 8,069

Home Schooling Allowances (M26)

Provides an allowance payable to parents/caregivers of children in full-time correspondence programmes for primary and secondary education and to parents/caregivers of children receiving their primary and secondary education at home (where a certificate of exemption from enrolment has been approved under section 21 of the Education Act 1989).
5,550 - 5,550

International Student Scholarship Scheme (M68)

Scholarships available to international students wishing to study in New Zealand. Details of the criteria and selection process for the scheme are available from Education New Zealand.
2,200 - 2,200

Maori and Pacific Island Scholarships and Bursaries (M68)

Programmes to provide scholarships and bursaries to Maori and Pasifika students, according to established criteria. The programmes include Maori Education Trust and Polynesian and Pacific Island Education Foundation Scholarships, Ngarimu VC and 28th (Maori) Battalion Memorial Scholarship Fund and Maori and Polynesian Scholarships.
1,037 - 1,037

Mapihi Pounamu (M26)

Assistance to at-risk secondary school-aged students aged 14 and above, who face barriers to learning to ensure that they participate and achieve in education. The scheme is administered by the Ministry of Education.
3,250 - 3,250

National Study Awards (M26)

Provision for the costs of study awards, sabbaticals and fellowships for teachers, including replacement of the teacher while on study leave. Awards include those linked to teachers' collective agreements and approved prestigious awards. Priorities, criteria and selection processes are published by the Ministry of Education.
24,646 35 24,681

Queen Elizabeth II Study Awards (M68)

Awards for training assistance in a Commonwealth country provided to technicians under The Queen Elizabeth II Technicians' Study Award Act 1970.
100 - 100

Scholarships for Students to Attend Private Schools (M26)

Assistance to students from low-income families to attend private schools.
2,914 - 2,914

Study Abroad Awards (M68)

Awards granted to provide assistance to top scholars, researchers and teachers to undertake placements abroad and to participate in reciprocal education exchange arrangements with partner countries in selected areas of priority study, teaching and research. The criteria and selection process are available from Education New Zealand and AFS Intercultural Programmes New Zealand.
1,290 - 1,290

Targeted Education and Training Grants (M68)

Initiatives to provide living support for students at risk who need to move away from home to pursue alternative education options. The criteria and process for these grants are available from the Tertiary Education Commission.
40 - 40

Teacher Trainee Scholarships (M26)

Scholarships and allowances for students undertaking teacher training education, and loan support payments to teachers. The criteria and process for awarding scholarships are published by the Ministry of Education.
7,027 (3,000) 4,027

Tertiary Scholarships (M68)

This appropriation is limited to providing scholarships for tertiary students. The criteria and process for the awards are available from the Tertiary Education Commission.
16,915 (656) 16,259

Tertiary Teaching Awards (M68)

Awards to recognise outstanding tertiary education teachers as selected by a committee appointed by the Minister of Education and according to approved criteria and guidelines as published by the Tertiary Education Commission.
200 - 200

United World Scholarships (M26)

Scholarships for attendance at United World Colleges.
50 - 50

Total Benefits and Other Unrequited Expenses

73,288 (3,621) 69,667

Departmental Other Expenses

     

Recovery from February 2011 Christchurch Earthquake (M26)

This appropriation is limited to writing off, or making good damage to, departmental assets and re-establishing school operations in Christchurch following the 22 February 2011 earthquake.
- 14,720 14,720

Total Departmental Other Expenses

- 14,720 14,720

Non-Departmental Other Expenses

     

Adult and Community Education (M68)

This appropriation is limited to providing funding for delivery of community and adult education courses including literacy and English for speakers of other languages training through tertiary education institutions, schools and other agencies.
69,653 (582) 69,071

Early Childhood Education (M26)

Subsidising early childhood education services for children under six years of age from licensed and chartered early childhood education services (including centres and chartered home-based care networks) and from licence-exempt and certificated centres. Also included are several targeted funds.
1,263,908 121,486 1,385,394

Early Childhood Grants (M26)

Assistance is provided to early childhood education groups for developing accommodation including the establishment of new centres, or to increase the capacity or improve the standard of accommodation in existing centres. The criteria and selection process are published by the Ministry of Education.
13,783 (13,783) -

Integrated Schools Property (M26)

Provision for modernisation of existing property at integrated schools as part of a funding regime negotiated with the proprietors of integrated schools. Funding to assist in the expansion of the network is also included.
49,255 5,796 55,051

Interest Subsidy for Schools (M26)

Provides a subsidy on interest payments for borrowing by private and state integrated schools for approved property-related projects. Administration costs are also included.
440 (220) 220

New Zealand Teachers Council (M26)

Operating grant to assist the Teachers Council to carry out its leadership function.
178 - 178

Performance Based Research Fund (M68)

This appropriation is limited to funding research and research-based teaching on the basis of measured research quality in tertiary education organisations.
250,000 - 250,000

Primary Education (M26)

Delivering the curriculum for Years 0 to 8 (new entrant to Form 2) to pupils of State, integrated, private schools and The Correspondence School. Provides roll-based operations funding to schools, teacher and management salaries, support costs and supplementary funding programmes.
2,606,700 93,564 2,700,264

Remission of Fees (M26)

Payment to the New Zealand Qualifications Authority for student examination fees remitted in cases of hardship.
1,288 - 1,288

School Transport (M26)

Payments to teachers who, as Bus Controllers, assist in the provision of school transport assistance.
839 (22) 817

Schooling Improvement (M26)

School support and schooling improvement projects to improve the capability of schools and clusters and their responsiveness to the needs of their communities. These include iwi-strengthening education projects.
13,572 (4,309) 9,263

Secondary Education (M26)

Delivering the curriculum for Years 9 to 13 (Forms 3 to 7) to pupils of State, integrated, private schools and The Correspondence School. Provides roll-based operations funding to schools, teacher and management salaries, support costs and supplementary funding programmes.
1,948,932 43,177 1,992,109

Special Needs Support (M26)

Providing additional resources to enable students with special education needs to participate in education including supplementary resources for special education needs, residential services, English for Speakers of Other Languages and alternative education programmes.
308,288 4,096 312,384

Support for Early Childhood Education Providers (M26)

This appropriation is limited to assisting early childhood education services and other bodies corporate in provision of child places for early childhood education. Priority will be given to providers in communities that have low levels of participation in early childhood education, to increase the number of child places and therefore availability of early childhood education. The criteria and selection process for each type of assistance are published by the Ministry of Education.
- 12,000 12,000

Support for International Students (M68)

This appropriation is limited to provision of additional support to international students and their families affected by the Christchurch earthquake, including grants toward costs not covered by ACC, insurance or other support and refunds of tuition and other fees.
- 2,000 2,000

Tertiary Education Grants and Other Funding (M68)

This appropriation is limited to providing contestable funding and miscellaneous funding to tertiary education organisations.
21,231 5,209 26,440

Tertiary Education Institutions Merger Support (M68)

This appropriation is limited to providing support toward the additional costs related to the merger of particular tertiary education institutions.
- 5,000 5,000

Tertiary Education Organisation Component - Capability Fund (M68)

This appropriation is limited to financial contributions to the cost of tertiary education organisations maintaining and enhancing their capability to deliver quality and relevance, and to develop their specific and distinctive roles in the network of tertiary education provision.
194,326 1,130 195,456

UNESCO (M26)

Annual membership contribution to United Nations Educational, Scientific and Cultural Organisation's international administration and a programme of activities of the National Commission including participation in regional and international activities.
2,083 - 2,083

University of Auckland Starpath Project (M68)

Funding under the Partnerships for Excellence programme to support the Starpath initiatives at the University of Auckland.
5,650 (4,440) 1,210

Total Non-Departmental Other Expenses

6,750,126 270,102 7,020,228

Departmental Capital Expenditure

     

Ministry of Education - Capital Expenditure PLA (M26)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Education, as authorised by section 24(1) of the Public Finance Act 1989.
712,592 (48,788) 663,804

Total Departmental Capital Expenditure

712,592 (48,788) 663,804

Non-Departmental Capital Expenditure

     

Property Disposal Incentives Scheme (M26)

Payments to schools of a share of the proceeds from the sale of their surplus school property assets.
5,397 (1,022) 4,375

Quality Reinvestment Programme (M68)

Support for Institutes of Technology and Polytechnics and Wananga through the Quality Reinvestment Programme to develop and maintain a high quality network of tertiary education provision aligned with the core roles of the sector as expressed in the Tertiary Education Strategy.
1,075 1,621 2,696

Redevelopment of Whitireia Community Polytechnic Porirua Campus (M68)

This appropriation is limited to redevelopment of the trades training facilities and the construction of a new Health Education and Social Services block at the Porirua campus of Whitireia Community Polytechnic.
1,080 (411) 669

School Support Project (M26)

Capital costs of implementing approved school support and schooling improvement projects (other than costs related to school property assets).
1,880 - 1,880

Schools Furniture and Equipment (M26)

Provides funds to schools for new furniture and equipment when capital works (including remodelling/upgrading of existing property and new school property) are approved.
17,610 5,961 23,571

Te Whare Wananga o Awanuiarangi Treaty Settlement (M68)

This appropriation is limited to the full and final settlement of Te Whare Wananga o Awanuiarangi in regards to the Waitangi Tribunal Claim (Wai 718) seeking Wananga capital establishment funding comparable to other tertiary education institutions and the repatriation of funds.
- 14,500 14,500

Total Non-Departmental Capital Expenditure

27,042 20,649 47,691

Total Annual and Permanent Appropriations

11,969,483 120,303 12,089,786

Details of Projected Movements in Departmental
Net Assets

Ministry of Education

Ministry of Education - Details of Projected Movements in Departmental Net Assets - Education
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 11,196,408 10,147,631 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections 254,029 208,451 Mainly owing to delays in the school property works programme, including defective buildings ($32 million) and other programmes ($21.890 million) partly offset by funding for implementation of ultra-fast broadband in schools ($8.481 million).
Capital Withdrawals (24,053) (27,263) Owing to converting capital funding to an operating stream to provide for leased accommodation rather than providing buildings.
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

11,426,384 10,328,819  

Information Supporting the Supplementary Estimates Vote Education

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Education (M26), Minister for Tertiary Education (M68)

ADMINISTERING DEPARTMENT: Ministry of Education

MINISTER RESPONSIBLE FOR MINISTRY OF EDUCATION : Minister of Education

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Education
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 4,406,435 (103,989) (28,770) (132,759) 4,273,676
Benefits and Other Unrequited Expenses 73,288 N/A (3,621) (3,621) 69,667
Borrowing Expenses - - - - -
Other Expenses 6,750,126 14,720 270,102 284,822 7,034,948
Capital Expenditure 739,634 (48,788) 20,649 (28,139) 711,495
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

11,969,483 (138,057) 258,360 120,303 12,089,786

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 69,570 N/A 13,131 13,131 82,701
Capital Receipts 1,080 N/A (411) (411) 669

Total Crown Revenue and Capital Receipts

70,650 N/A 12,720 12,720 83,370

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Interventions for Target Student Groups (M26)

Scope of Appropriation

Expenditure on policies and services focused on targeted student groups' or individuals' participation in education. This includes providing services to individuals with special education and developmental needs, providing additional funding for the support of students with special education needs, providing alternative education options, working with individuals and relevant stakeholders to resolve participation issues, and administering scholarships and awards for individuals.

Expenses and Revenue

Expenses and Revenue - Interventions for Target Student Groups (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 237,396 4,998 242,394
Revenue from Crown 234,064 4,998 239,062
Revenue from Other 3,332 - 3,332

Reasons for Change in Appropriation

This appropriation increased by $4.998 million to $242.394 million for 2010/11 mainly owing to a combination of:

  • provision for supporting 1,000 additional students aged five to eight ($4 million increase)
  • funding settlement of staff collective agreements ($1.018 million increase)
  • training additional advisors on deaf children ($600,000 increase), and
  • changes to cost allocations between departmental output expense appropriations ($1.073 million decrease).

School Property Portfolio Management (M26)

Scope of Appropriation

Expenditure on goods and services focused on providing the land, buildings and other facilities that make up the property portfolio of the State school sector. This includes purchasing and constructing new property, upgrading existing property to maintain the quality of the portfolio, disposing of surplus property, and managing teacher and caretaker housing.

Expenses and Revenue

Expenses and Revenue - School Property Portfolio Management (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 1,364,193 (105,786) 1,258,407
Revenue from Crown 1,360,904 (110,182) 1,250,722
Revenue from Other 3,289 4,396 7,685

Reasons for Change in Appropriation

This appropriation decreased by $105.786 million to $1,258.407 million for 2010/11 mainly owing to:

  • changes in capital charge, largely reflecting the impact of revaluation and impairment of defective buildings at 30 June 2010 ($77.627 million decrease)
  • delays in the school property rationalisation project with expenditure now expected to occur over the next several years ($22.959 million decrease)
  • a slower start than expected on a national survey of defective buildings, which is now due to finish at the end of next financial year ($11.501 million decrease)
  • provision for costs arising from the February 2011 earthquake ($4.396 million increase), and
  • changes to cost allocations between departmental output expense appropriations ($1.575 million increase).

Strategic Leadership in the Sector (M26)

Scope of Appropriation

Expenditure on policies and services focused on the Ministry's leadership role in the education sector. This includes enhancing the Ministry's coordination with other sector and Government agencies and forums, undertaking research and analysis, developing sector policy, monitoring the sector and select crown entities, and supporting the Minister of Education and Associate Minister to meet their obligations to Parliament.

Expenses and Revenue

Expenses and Revenue - Strategic Leadership in the Sector (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 31,476 2,605 34,081
Revenue from Crown 31,029 2,605 33,634
Revenue from Other 447 - 447

Reasons for Change in Appropriation

This appropriation increased by $2.605 million to $34.081 million for 2010/11 mainly owing to changes to cost allocations between departmental output expense appropriations ($2.755 million increase).

Strategic Leadership in the Tertiary System (M68)

Scope of Appropriation

Expenditure on policies and services focused on the Ministry's leadership role in the tertiary system. This includes enhancing coordination with sector and Government agencies and forums, undertaking research and analysis, developing sector policy, monitoring the system, providing information on tertiary and international education services, representing the education sector internationally, supporting international students, and supporting Ministers to meet their obligations to Parliament.

Expenses and Revenue

Expenses and Revenue - Strategic Leadership in the Tertiary System (M68) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 13,890 2,402 16,292
Revenue from Crown 13,882 2,402 16,284
Revenue from Other 8 - 8

Reasons for Change in Appropriation

This appropriation increased by $2.402 million to $16.292 million for 2010/11 mainly owing to:

  • changes to cost allocations between departmental output expense appropriations ($1.494 million increase), and
  • transfer of policy advice activities from the Tertiary Education Commission to the Ministry of Education ($788,000 increase).

Support and Resources for Education Providers (M26)

Scope of Appropriation

Expenditure on policies, regulations and services focused on the governance, management and operation of education providers. This includes managing regulations, administering the distribution of resources, delivering services that support school management - including industrial relations and education payroll, and working with providers to resolve underperformance.

Expenses and Revenue

Expenses and Revenue - Support and Resources for Education Providers (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 85,669 (10,917) 74,752
Revenue from Crown 83,668 (10,917) 72,751
Revenue from Other 2,001 - 2,001

Reasons for Change in Appropriation

This appropriation decreased by $10.917 million to $74.752 million for 2010/11 mainly owing to a combination of:

  • a transfer to 2011/12 as a result of delays in the schools' payroll project ($10.127 million decrease)
  • changes to cost allocations between departmental output expense appropriations ($2.912 million decrease)
  • a transfer to departmental output expense Support and Resources for Teachers to develop the Student Achievement Function ($1.063 million decrease)
  • a transfer to 2011/12 as a result of delays in the long-term work programme ($1.022 million decrease), and
  • programme management costs related to ultra-fast broadband in schools ($3.881 million increase).

Support and Resources for Teachers (M26)

Scope of Appropriation

Expenditure on policies and services focused on supporting the work and enhancing the capability of teachers. This includes providing curriculum and achievement standards, teaching resources, professional development, and administering scholarships and awards for existing teachers and principals.

Expenses and Revenue

Expenses and Revenue - Support and Resources for Teachers (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 59,528 3,522 63,050
Revenue from Crown 59,363 3,522 62,885
Revenue from Other 165 - 165

Reasons for Change in Appropriation

This appropriation increased by $3.522 million to $63.050 million for 2010/11 owing to a combination of:

  • transfers from other appropriations to develop the Student Achievement Function in order to continue to raise student achievement by directly working with schools and kura ($6.140 million increase), and
  • changes to cost allocations between departmental output expense appropriations ($2.757 million decrease).

Support and Resources for the Community (M26)

Scope of Appropriation

Expenditure on policies and programmes focused on the community's knowledge of and participation in the education system. This includes engaging with, providing information and support to, and delivering education courses to the community.

Expenses and Revenue

Expenses and Revenue - Support and Resources for the Community (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 14,378 (813) 13,565
Revenue from Crown 14,228 (813) 13,415
Revenue from Other 150 - 150

Reasons for Change in Appropriation

This appropriation decreased by $813,000 to $13.565 million for 2010/11 owing to a combination of:

  • a transfer to departmental output expense Support and Resources for Teachers for the Student Achievement Function ($2 million decrease)
  • changes to cost allocations between departmental output expense appropriations ($918,000 increase), and
  • a transfer of funding from the previous financial year after a delay in developing support material on the National Standards for parents, family and whanau ($250,000 increase).

Part 2.2 - Non-Departmental Output Expenses

Curriculum Support (M26)

Scope of Appropriation

Purchase of supplementary educational programmes for schools and communities to ensure wider access to these opportunities.

Reasons for Change in Appropriation

This appropriation decreased by $1.372 million to $63.835 million for 2010/11. This decrease is mainly owing to:

  • a transfer to departmental output expense Support and Resources for Teachers to develop the Student Achievement Function ($1.090 million decrease), and
  • a transfer to non-departmental other expense Special Needs Support for Alternative Education programmes ($765,000 decrease).

Education Research Initiatives (M26)

Scope of Appropriation

Purchase of research about teaching and learning in our educational institutions and independent research on education issues, policies and practices.

Reasons for Change in Appropriation

This appropriation increased by $28,000 to $3.008 million for 2010/11 as a result of a revision to the level of funding allocated to departmental output expense Strategic Leadership in the Sector to support the longitudinal study Growing Up in New Zealand.

Managing the Government's Investment in the Tertiary Education Sector (M68)

Scope of Appropriation

This appropriation is limited to developing, implementing and managing an investment system that aligns planning, funding, monitoring and quality assurance of tertiary education in accordance with the provisions of the Education Act 1989 and other relevant legislation.

Reasons for Change in Appropriation

This appropriation increased by $1.550 million to $36.080 million for 2010/11. This increase is owing to:

  • a transfer from 2009/10 for performance benchmarking of Tertiary Education Institutions as a consequence of delays in the programme ($1.250 million increase), and
  • provision for the detailed planning and initiation of event-driven information collection systems ($300,000 increase).

Provision of Information and Advisory Services (M26)

Scope of Appropriation

Providing information on government education policy and programmes, general information, advisory programmes, and services to the public, community groups, industry and the education community.

Reasons for Change in Appropriation

This appropriation increased by $205,000 to $22.547 million for 2010/11 as a result of expanding provision for cochlear implant habilitation.

Qualifications Support Structures (M26)

Scope of Appropriation

Provision for the New Zealand Qualifications Authority to oversee the setting of standards and standards based qualifications. It also includes standard-setting responsibility, recognition and review of qualifications, records management processes to support the Register of Quality Assured Qualifications and National Qualifications Framework, and participation in the promotion of the New Zealand National Qualifications system to key education and immigration partner countries.

Reasons for Change in Appropriation

This appropriation increased by $13,000 to $6.062 million for 2010/11 owing to a transfer from Vote Foreign Affairs and Trade for support for negotiation of international trade agreements.

School Transport (M26)

Scope of Appropriation

Purchase of services to transport eligible students to and from State and integrated schools. Also included are payments to schools that manage their own transport services and payments to parents/caregivers to compensate for the costs of taking children to school where other transport services are unsuitable or unavailable.

Reasons for Change in Appropriation

This appropriation increased by $1.906 million to $162.178 million for 2010/11. This increase relates to:

  • provisions for increased road user charges ($993,000 increase)
  • provision for additional transport costs arising from the Canterbury earthquakes ($890,000 increase)
  • higher costs for index-based adjustments ($426,000 increase), and
  • other adjustments, including the impact of lower than expected primary school rolls and lower levels of other claims ($403,000 decrease).

Supporting Parenting (M26)

Scope of Appropriation

This appropriation is limited to purchasing delivery of specific programmes, and providing advice and support which enhance the role of parents/caregivers in the development of their children and promote the value of quality education experiences.

Reasons for Change in Appropriation

This appropriation decreased by $1.490 million to $3.768 million for 2010/11 mainly as a result of delays in the Engaging Priority Families programme and a consequential transfer of funds to outyears ($1.400 million decrease).

Tertiary Education and Training Policy Advice (M68)

Scope of Appropriation

This appropriation is limited to providing advice and support to Ministers on the tertiary sector and tertiary education and training issues.

Reasons for Change in Appropriation

This appropriation decreased by $1.091 million to $4.546 million for 2010/11 mainly owing to a transfer to departmental output expense Strategic Leadership in the Tertiary System after the Tertiary Education Commission's policy function was transferred to the Ministry of Education.

Tertiary Education: Student Achievement Component (M68)

Scope of Appropriation

This appropriation is limited to teaching and learning services for enrolled students in approved courses at tertiary education organisations to achieve recognised tertiary qualifications.

Reasons for Change in Appropriation

This appropriation increased by $7.381 million to $1,834.868 million for 2010/11 to address demand pressures for additional undergraduate university places.

Training for Designated Groups (M68)

Scope of Appropriation

Purchasing training linked to the National Qualifications Framework and the purchase of both on-job and off-job training places including delivery of fully or partially funded training places.

Reasons for Change in Appropriation

This appropriation decreased by $35.900 million to $268.507 million for 2010/11 owing to a reprioritisation of the Industry Training Fund to fund additional undergraduate university places.

Part 3 - Details for Benefits and Other Unrequited Expenses

Part 3.2 - Non-Departmental Benefits and Other Unrequited Expenses

National Study Awards (M26)

Scope of Appropriation

Provision for the costs of study awards, sabbaticals and fellowships for teachers, including replacement of the teacher while on study leave. Awards include those linked to teachers' collective agreements and approved prestigious awards. Priorities, criteria and selection processes are published by the Ministry of Education.

Reasons for Change in Appropriation

This appropriation increased by $35,000 to $24.681 million for 2010/11 owing to a provision for settlement of teachers and principals' collective agreements.

Teacher Trainee Scholarships (M26)

Scope of Appropriation

Scholarships and allowances for students undertaking teacher training education, and loan support payments to teachers. The criteria and process for awarding scholarships are published by the Ministry of Education.

Reasons for Change in Appropriation

This appropriation decreased by $3 million to $4.027 million for 2010/11 owing to a transfer to Vote Social Development to enable StudyLink to continue to make scholarship payments to recipients and providers.

Tertiary Scholarships (M68)

Scope of Appropriation

This appropriation is limited to providing scholarships for tertiary students. The criteria and process for the awards are available from the Tertiary Education Commission.

Reasons for Change in Appropriation

This appropriation decreased by $656,000 to $16.259 million for 2010/11 owing to a transfer to non-departmental other expense Tertiary Education Grants and Other Funding for Adult Literacy Educator Grants.

Part 5 - Details and Expected Results for Other Expenses

Part 5.1 - Departmental Other Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 5.1 Departmental Other Expenses - Education
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: The Ministry is capable, efficient and responsive to achieve education priorities.
Impacts:
  • All children, including those with disabilities and special education needs, achieve their full potential through education.
  • Improved efficiency in the way the Ministry operates.
  • Improved cost-effectiveness of the Government's expenditure in education.
Recovery from February 2011 Christchurch Earthquake

Recovery from February 2011 Christchurch Earthquake (M26)

Scope of Appropriation

This appropriation is limited to writing off, or making good damage to, departmental assets and re-establishing school operations in Christchurch following the 22 February 2011 earthquake.

Expenses

Expenses - Recovery from February 2011 Christchurch Earthquake (M26) - Education
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 14,720 14,720

Reasons for Change in Appropriation

This new appropriaton of $14.720 million provides for making good earthquake damage to schools and writing off assets badly damaged or destroyed in the earthquake.

Expected Results

Expected Results - Recovery from February 2011 Christchurch Earthquake (M26) - Education
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Estimated value of emergency repairs - including temporary sewerage solutions ($000) - 4,720 4,720
Estimated value of assets to be written off ($000) - 10,000 10,000

Part 5.2 - Non-Departmental Other Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 5.2 NonDepartmental Other Expenses - Education
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: Relevant and efficient tertiary education provision that meets student and labour market needs.
Impacts:
  • Improved efficiency within the tertiary funding system and student support system.
  • Increased numbers of students completing tertiary qualifications at higher levels.
Support for International Students
Outcome: Increasing opportunity for children to participate in quality early childhood education.
Impacts:
  • The proportion of Maori, Pasifika and children from low socio-economic areas attending high quality early childhood education rising to levels consistent with the general population.
Support for Early Childhood Education Providers

Adult and Community Education (M68)

Scope of Appropriation

This appropriation is limited to providing funding for delivery of community and adult education courses including literacy and English for speakers of other languages training through tertiary education institutions, schools and other agencies.

Reasons for Change in Appropriation

This appropriation decreased by $582,000 to $69.071 million for 2010/11. The decrease in funding is mainly owing to a transfer to 2011/12 of funding for the Workplace Literacy Fund ($481,000).

Early Childhood Education (M26)

Scope of Appropriation

Subsidising early childhood education services for children under six years of age from licensed and chartered early childhood education services (including centres and chartered home-based care networks) and from licence-exempt and certificated centres. Also included are several targeted funds.

Reasons for Change in Appropriation

This appropriation increased by $121.486 million to $1,385.394 million for 2010/11. The increase in funding is mainly owing to a combination of:

  • increased average weekly hours attended and a higher proportion of hours being claimed by children receiving 20 Hours Early Childhood Education ($91.696 million increase)
  • higher than expected participation and an increase in average weekly hours attended by under-two-year-olds ($24.970 million increase)
  • increased average weekly hours attended by over-two-year-olds ($6.976 million increase)
  • provision for settlement of the kindergarten teachers collective agreement ($2.841 million increase), and
  • a transfer of funding to create the new non-departmental other expense Support for Early Childhood Education Providers ($6.067 million decrease).

Early Childhood Grants (M26)

Scope of Appropriation

Assistance is provided to early childhood education groups for developing accommodation including the establishment of new centres, or to increase the capacity or improve the standard of accommodation in existing centres. The criteria and selection process are published by the Ministry of Education.

Reasons for Change in Appropriation

This appropriation of $13.783 million was transferred entirely to the new non-departmental other expense Support for Early Childhood Education Providers.

Integrated Schools Property (M26)

Scope of Appropriation

Provision for modernisation of existing property at integrated schools as part of a funding regime negotiated with the proprietors of integrated schools. Funding to assist in the expansion of the network is also included.

Reasons for Change in Appropriation

This appropriation increased by $5.796 million to $55.051 million for 2010/11. The increase is mainly owing to additional funding for the School Network Upgrade Project ($5.350 million).

Macro Economic Policy Advice & Management MCOA (M31)

Scope of Appropriation

Economic and Tax Forecasting
This output class is limited to the preparation of economic and tax forecasts, and monitoring of and reporting on economic and tax conditions.
Fiscal Management
This output class is limited to the development of the Budget strategy and advice, and activities of the annual Budget process.
Fiscal Reporting
This output class is limited to preparing fiscal forecasts, monitoring of and reporting on fiscal conditions, preparing the financial statements of the Government, providing advice on the application and development of generally accepted accounting practice as it applies to the Crown, and monitoring the adequacy of departmental financial management controls.
Management of Crown Lending and Crown Bank Accounts
This output class is limited to the management of Crown lending and Crown and Departmental bank accounts.
Policy Advice: Fiscal and Macroeconomic
This output class is limited to the provision of fiscal and macroeconomic policy advice.

Explanation for Use of Multi-Class Output Expense Appropriation

These output classes all contribute to the outcome of a stable and sustainable macroeconomic environment in New Zealand.

Expenses and Revenue

Expenses and Revenue - Macro Economic Policy Advice & Management MCOA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Total Appropriation

14,910 (1,060) 13,850
Economic and Tax Forecasting 2,691 (210) 2,481
Fiscal Management 3,290 (962) 2,328
Fiscal Reporting 3,588 (506) 3,082
Management of Crown Lending and Crown Bank Accounts 540 12 552
Policy Advice: Fiscal and Macroeconomic 4,801 606 5,407

Revenue from Crown

14,674 (1,043) 13,631
Economic and Tax Forecasting 2,641 (201) 2,440
Fiscal Management 3,240 (943) 2,297
Fiscal Reporting 3,530 (494) 3,036
Management of Crown Lending and Crown Bank Accounts 534 9 543
Policy Advice: Fiscal and Macroeconomic 4,729 586 5,315

Revenue from Other

236 (17) 219
Economic and Tax Forecasting 50 (9) 41
Fiscal Management 50 (19) 31
Fiscal Reporting 58 (12) 46
Management of Crown Lending and Crown Bank Accounts 6 3 9
Policy Advice: Fiscal and Macroeconomic 72 20 92

Reasons for Change in Appropriation

This multi-class output expense appropriation has decreased due to:

  • efficiency savings of $274,000 in 2010/11 to transfer into 2011/12 to address emerging cost pressures for crown balance sheet work, and
  • a reclassification of current activity. The reduction in Fiscal Management recognises a reclassification of Vote Analyst work during the Budget process from Fiscal Management into the other Policy Advice output classes. Efficiencies have also been made in the Budget production process. The increase in Policy Advice: Fiscal and Macroeconomic relates to Crown Balance Sheet advice which, given its advisory nature and focus on ownership mix was reclassified from the Management of Liabilities, Claims Against the Crown and Crown Properties output class.

State Sector and Economic Performance Policy Advice and Management MCOA (M31)

Scope of Appropriation

Crown Deposit Guarantee Scheme
This output class is limited to the implementation and operation of the Crown's deposit guarantee scheme excluding expenses incurred in connection with administering claims under a guarantee or indemnity given under the scheme.
Crown Wholesale Guarantee Facility
This output class is limited to the implementation and operation of the Crown's wholesale guarantee facility.
Management of Liabilities, Claims Against the Crown and Crown Properties
Management of contractual or Treaty of Waitangi related claims against the Crown and the management of New Zealand House, London.
New Zealand Export Credit Office
Implementation of the Government's Export Credit Guarantees policy and operation of the New Zealand Export Credit Office.
Policy Advice: Economic Performance
Policy advice on the Government's economic strategy and policy settings and their effect on New Zealand's economic growth.
Policy Advice: State Sector Performance
Policy advice on the effective and efficient use of state resources including improved decision-making and performance management systems and the efficient management of Crown assets.

Explanation for Use of Multi-Class Output Expense Appropriation

These output classes all contribute to the outcomes of improving New Zealand's overall economic performance and improving state sector performance.

Expenses and Revenue

Expenses and Revenue - State Sector and Economic Performance Policy Advice and Management MCOA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Total Appropriation

34,271 (870) 33,401
Crown Deposit Guarantee Scheme - - -
Crown Wholesale Guarantee Facility - - -
Management of Liabilities, Claims Against the Crown and Crown Properties 1,922 (1,269) 653
New Zealand Export Credit Office 3,631 (376) 3,255
Policy Advice: Economic Performance 14,875 970 15,845
Policy Advice: State Sector Performance 13,843 (195) 13,648

Revenue from Crown

33,664 (1,285) 32,379
Crown Deposit Guarantee Scheme - - -
Crown Wholesale Guarantee Facility - - -
Management of Liabilities, Claims Against the Crown and Crown Properties 1,898 (1,253) 645
New Zealand Export Credit Office 3,580 (408) 3,172
Policy Advice: Economic Performance 14,623 959 15,582
Policy Advice: State Sector Performance 13,563 (583) 12,980

Revenue from Other

607 415 1,022
Crown Deposit Guarantee Scheme - - -
Crown Wholesale Guarantee Facility - - -
Management of Liabilities, Claims Against the Crown and Crown Properties 24 (16) 8
New Zealand Export Credit Office 51 32 83
Policy Advice: Economic Performance 252 11 263
Policy Advice: State Sector Performance 280 388 668

Reasons for Change in Appropriation

This multi-class expense appropriation has decreased overall due to range of decreases greater than the increases during the year.

Increases are due to:

  • new funding of $440,000 was provided in Policy Advice: State Sector Performance for Phase two of the Better Administration and Support Services project. This was funded through recoveries from other agencies, and
  • a reallocation of resources to reflect Ministerial priorities in 2010/11 output plan. Policy Advice: Economic Performance was given a higher level of resource to deliver on additional work eg, Savings Working Group, and other priority areas including Regulation, Tax Strategy and Highly Skilled Workforce. State Sector Performance was increased to fund priority projects and fiscal risks around State sector reform work.

Decreases are due to:

  • identified efficiency savings of $940,000 in 2010/11 to transfer into 2011/12 to address emerging cost pressures in crown balance sheet work
  • funds being returned to the Crown from New Zealand Export Credit Office. This resulted from slower than expected deal flow giving rise to less third-party costs, such as legal and surety bond fees associated with these deals, and
  • reclassification of activities. The Crown Balance Sheet work on Vote Finance entities was previously funded from Management of Liabilities, Claims Against the Crown and Crown Properties. This work was reclassified into Policy Advice: Fiscal and Macroeconomic.

Part 2.2 - Non-Departmental Output Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 2.2 NonDepartmental Output Expenses - Finance
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Funding of the New Zealand Productivity Commission in accordance with the New Zealand Productivity Commission Act 2010. Inquiries into Productivity - Related Matters
  Research into and Promotion of Productivity - Related Matters

2025 Productivity Taskforce (M31)

Scope of Appropriation

This appropriation is limited to the fees and expenses of members of the Taskforce appointed to carry forward work on the productivity gap with Australia, and the fees and expenses for any other advice that the Taskforce may commission.

Expenses

Expenses - 2025 Productivity Taskforce (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 81 67 148

Reasons for Change in Appropriation

The outstanding balance of the appropriation in 2009/10 was carried forward to 2010/11 to address the ongoing work programme of the Taskforce.

Output Performance Measures and Standards

Output Performance Measures and Standards - 2025 Productivity Taskforce (M31) - Finance
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Second taskforce report providing further analysis and recommendations and assessing progress delivered by 31 October 2010. Achieved Achieved Achieved

Enquiries, Reviews and Research Into Productivity Matters (M31)

Scope of Appropriation

This appropriation is limited to enquiries, reviews and research into productivity related activities.

Expenses

Expenses - Enquiries, Reviews and Research Into Productivity Matters (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 655 (655) -

Reasons for Change in Appropriation

A new Multi-class Output Appropriation (MCOA) has been established in Vote Finance for the activities of the New Zealand Productivity Commission. This will allow for a higher level of oversight and best reflects the segregation of outputs being purchased. The funding from this original appropriation has been transferred to the new MCOA and the output performance measures and standards have been reported there.

Inquiries and Research into Productivity Related Matters MCOA (M31)

Scope of Appropriation

Inquiries into Productivity - Related Matters
This output class is limited to inquiries undertaken by the New Zealand Productivity Commission in accordance with the New Zealand Productivity Commission Act 2010.
Research into and Promotion of Productivity - Related Matters
This output class is limited to the New Zealand Productivity Commission undertaking research into and promoting public understanding of productivity related matters in accordance with the New Zealand Productivity Commission Act 2010.

Explanation for Use of Multi-Class Output Expense Appropriation

The two output classes are limited to inquiries, research and promotion of productivity related matters.

Expenses

Expenses - Inquiries and Research into Productivity Related Matters MCOA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 1,210 1,210
Inquiries into Productivity - Related Matters - 1,160 1,160
Research into and Promotion of Productivity - Related Matters - 50 50

Reasons for Change in Appropriation

This new Multi-class Output Appropriation (MCOA) has been established in Vote Finance for the activities of the New Zealand Productivity Commission. This will allow for a higher level of oversight and best reflects the segregation of outputs that the Minister is purchasing. Funding has been transferred in 2010/11 to these output classes from the original Non-Departmental Output class (Enquiries, Reviews and Research Into Productivity Matters) and from the unspent portion of the Departmental Output Class (Establishment of the New Zealand Productivity Commission).

Output Performance Measures and Standards

Output Performance Measures and Standards - Inquiries and Research into Productivity Related Matters MCOA (M31) - Finance
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Work on the first inquiry referred to the Commission is underway within one month of the Commission becoming operational on 1 April 2011. N/A Achieved Achieved

Conditions on Use of Appropriation

New Zealand Productivity Commission will complete a Statement of Intent for the period 1 April 2011 to 30 June 2012 by 30 June 2011. This document will set out the measures and standards against which the New Zealand Productivity Commission will be assessed during the period to 30 June 2012.

Management of New Zealand House, London (M31)

Scope of Appropriation

This appropriation is limited to the property management services in respect of New Zealand House, London.

Expenses

Expenses - Management of New Zealand House, London (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 1,000 (400) 600

Reasons for Change in Appropriation

The appropriation has been reduced by $400,000, partially due to the change in exchange rates during the year and has been returned to the Crown. Rental revenue has been revised down by the same amount, making this change fiscally neutral.

Output Performance Measures and Standards

Output Performance Measures and Standards - Management of New Zealand House, London (M31) - Finance
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Optimise New Zealand House rental revenue. Achieved Achieved Achieved
Occupancy rates maximised. Achieved Achieved Achieved
Maintain the property to support the achievement of revenue and occupancy objectives. Achieved Achieved Achieved

Management of the Crown's Obligations for Geothermal Wells (M31)

Scope of Appropriation

This appropriation is limited to the management and maintenance relating to geothermal wells and associated sites and structures for which the Crown accepts responsibility.

Expenses

Expenses - Management of the Crown's Obligations for Geothermal Wells (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 151 60 211

Reasons for Change in Appropriation

An expense transfer from 2009/10 was made to provide funding for remedial work on redundant geothermal assets at Wairakei as this work was not completed during that year.

Output Performance Measures and Standards

Output Performance Measures and Standards - Management of the Crown's Obligations for Geothermal Wells (M31) - Finance
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Monitor and maintain wells through regular inspections and completion of standard maintenance actions. Achieved Achieved Achieved

Management of the New Zealand Superannuation Fund (M31)

Scope of Appropriation

This appropriation is limited to managing the New Zealand Superannuation Fund on behalf of the Crown.

Expenses

Expenses - Management of the New Zealand Superannuation Fund (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 516 (166) 350

Reasons for Change in Appropriation

The payments expected to be made to Guardians of the New Zealand Superannuation Fund are now forecast to be $166,000 lower than appropriation and are being returned to the Crown.

Output Performance Measures and Standards

Output Performance Measures and Standards - Management of the New Zealand Superannuation Fund (M31) - Finance
  2010/11
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
The Guardians of New Zealand Superannuation manage and administer the Fund in accordance with their Statement of Intent. Achieved Achieved Achieved

Summary of Service Providers for Non-Departmental Outputs

Summary of Service Providers - Summary of Service Providers for NonDepartmental Outputs - Finance
  2010/11    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting
Mechanism
Expiry of
Resourcing
Commitment

Independent Crown Entity

         
New Zealand Productivity Commission
  • Inquiries and Research into Productivity Related Matters MCOA (funding transfer)
 
 
-
 
 
1210
 
 
1,210
 
Providers annual report (exempted for 30 June 2011)
 
 
Ongoing

Funding has been transferred in 2010/11 to Inquiries and Research into Productivity Related Matters MCOA from the original Non-Departmental Output class (Enquiries, Reviews and Research Into Productivity Matters) and from the unspent portion of the Departmental Output Class (Establishment of the New Zealand Productivity Commission).

The above table summarises funding to be allocated through Vote Finance to non-departmental providers, along with an indication of the mechanism to be used for reporting actual performance and (where determined) the length of the funding commitment.

Part 4 - Details for Borrowing Expenses

Part 4.2 - Non-Departmental Borrowing Expenses

Debt Servicing PLA (M31)

Scope of Appropriation

This appropriation is limited to the payment of borrowing expenses for the Crown's New Zealand-dollar and foreign-currency debt, authorised by section 60(1)b of the Public Finance Act 1989.

Expenses

Expenses - Debt Servicing PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 3,058,421 (26,683) 3,031,738

Reasons for Change in Appropriation

The change reflects interest rate movements and the amount of debt outstanding.

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 5.2 NonDepartmental Other Expenses - Finance
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: A high performing state sector that supports New Zealand's international competitiveness.
Impact: The Crown's balance sheet is managed efficiently and effectively.
Additional Payments to Facilitate Full Payout under the Crown Retail Deposit Guarantee Scheme
Costs in respect of Guarantees and Indemnities PLA
  Earthquake Commission
  Earthquake Commission - Land Insurance Payments
  Impairment of Crown's interest in AMI
  Impairment of Loans to Taitokerau Forest Limited
  National Provident Fund - Crown liability for Scheme Deficiency PLA
  Payment in Respect of New Zealand Export Credit Office Guarantee and Indemnities PLA

Additional Payments to Facilitate Full Payout under the Crown Retail Deposit Guarantee Scheme. (M31)

Scope of Appropriation

This appropriation is limited to payments under the Crown Retail Deposit Guarantee Scheme additional to those covered by the PLA required to facilitate full payout. This includes payments to ineligible investors in entities which default under the Deed of Guarantee up to 12 October 2010 plus a contingency to ensure that payments to the Trustee cover the full costs of paying out all debenture holders.

Expenses

Expenses - Additional Payments to Facilitate Full Payout under the Crown Retail Deposit Guarantee Scheme. (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 150,000 150,000

Reasons for Change in Appropriation

This appropriation was utilised to provide contingency funding to the Trustee of South Canterbury Finance. This has subsequently been fully repaid back to the Crown by the Trustee.

Expected Results

Expected Results - Additional Payments to Facilitate Full Payout under the Crown Retail Deposit Guarantee Scheme. (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Timely payout to Trustee of South Canterbury Finance. N/A Achieved Achieved
Recovery within agreed timeframes from Trustee. N/A Achieved Achieved

Costs in respect of Guarantees and Indemnities PLA (M31)

Scope of Appropriation

This appropriation is limited to payments by the Crown under a guarantee or indemnity given under section 65ZD of the Public Finance Act 1989, as authorised by section 65ZG of that Act.

Expenses

Expenses - Costs in respect of Guarantees and Indemnities PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 1,547,116 1,547,116

Reasons for Change in Appropriation

This appropriation is required for the gross payment of guaranteed depositors of defaulting entities, guaranteed under the Crown Retail Deposit Guarantee Scheme. On payment, the Crown assumes the rights of the depositors and recognises the recoveries from these entities as non-tax revenue. In addition this appropriation also reflects adjustments to the expected recoveries from the nine entities which have defaulted under the scheme.

Expected Results

Expected Results - Costs in respect of Guarantees and Indemnities PLA (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
The Crown's liability to guaranteed depositors of defaulting entities is correctly recorded in the Financial Statements of the Government. Unqualified Audit Opinion Unqualified Audit Opinion Unqualified Audit Opinion
Payments are made in accordance with the requirements of the Public Finance Act. Unqualified Audit Opinion Unqualified Audit Opinion Unqualified Audit Opinion

Earthquake Commission (M31)

Scope of Appropriation

This appropriation is limited to the remediation of residential land that was damaged in the 2010 Canterbury earthquake to a higher standard than required by the Earthquake Commission Act.

Expenses

Expenses - Earthquake Commission (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 141,100 141,100

Reasons for Change in Appropriation

This is a new appropriation in 2010/11 of $141.100 million approved as a result of the Canterbury Earthquake on 4 September 2010 to provide funding to Canterbury local councils for remedial work.

Expected Results

Expected Results - Earthquake Commission (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Negotiate an MOU with Councils. N/A Achieved Achieved
Complete a Concept Design Report that details the engineering requirements and informs the work programme and spend. N/A Achieved Achieved

Earthquake Commission - Land Insurance Payments (M31)

Scope of Appropriation

This appropriation is limited to insurance payments to the owners of damaged land in the Canterbury region where the cost of land remediation is greater than the insured value of the land.

Expenses

Expenses - Earthquake Commission Land Insurance Payments (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 5,000 5,000

Reasons for Change in Appropriation

This is a new appropriation in 2010/11 of $5 million approved as the result of the Canterbury earthquake on 4 September 2010.

Expected Results

Expected Results - Earthquake Commission Land Insurance Payments (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Timely advice provided on properties. N/A Achieved Achieved

Government Superannuation Fund Authority - Crown's Share of Expenses PLA (M31)

Scope of Appropriation

This appropriation is limited to the Crown's share of the expenses of the Government Superannuation Fund Authority relating to the management and administration of the Government Superannuation Fund and the schemes, authorised by sections 15E and 95 of the Government Superannuation Act 1956.

Expenses

Expenses - Government Superannuation Fund Authority Crown's Share of Expenses PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 23,760 1,000 24,760

Reasons for Change in Appropriation

This increase is a result of changes in custodial, investment and administration costs due to an increase in assets under fund management.

Expected Results

Expected Results - Government Superannuation Fund Authority Crown's Share of Expenses PLA (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
The Crown's share of management and administration fees is paid in accordance with the Government Superannuation Fund's determination and certification of the Government Actuary. Achieved Achieved Achieved

Government Superannuation Fund Unfunded Liability PLA (M31)

Scope of Appropriation

This appropriation is limited to the net increase (excluding actuarial gains and losses) in the Crown's liability to the Government Superannuation Fund and the specified superannuation contribution withholding tax on employer contributions by the Crown, authorised by section 95AA of the Government Superannuation Act 1956.

Expenses

Expenses - Government Superannuation Fund Unfunded Liability PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 684,117 (54,989) 629,128

Reasons for Change in Appropriation

This decrease reflects marginal changes to forecast assumptions, other than actuarial losses and gains.

Expected Results

Expected Results - Government Superannuation Fund Unfunded Liability PLA (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Recognition of the Crown's GSF obligations in the Financial Statements of the Government. Unqualified audit opinion Unqualified audit opinion Unqualified audit opinion
Tax payments are accurate and paid within deadlines. Met Met Met

Impairment of Crown's interest in AMI (M31)

Scope of Appropriation

This appropriation is limited to the impairment of equity investment in AMI.

Expenses

Expenses - Impairment of Crown's interest in AMI (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 500,000 500,000

Reasons for Change in Appropriation

This is a new appropriation of $500 million for potential impairment of the Crown's investment in AMI. The fair value of AMI is still uncertain, subject to the final level of claims received for the Christchurch earthquake. The appropriation is set at the maximum exposure to the Crown being the total amount of equity invested.

Expected Results

Expected Results - Impairment of Crown's interest in AMI (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Impairment of Crown's investment in AMI correctly recorded in the Financial Statements of the Government. N/A Achieved Achieved

Impairment of Loans to Taitokerau Forest Limited (M31)

Scope of Appropriation

This appropriation is limited to the expense incurred on the impairment of new loans to Taitokerau Forests Limited.

Expenses

Expenses - Impairment of Loans to Taitokerau Forest Limited (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 800 700 1,500

Reasons for Change in Appropriation

The timing of drawdowns of Taitokerau Forests Limited loan facility is uncertain. In 2009/10, the actual drawdown of the loan was $700,000 less than appropriated for that year resulting in a carry forward of this amount into 2010/11. The impairment takes place when the loan is drawn down.

Expected Results

Expected Results - Impairment of Loans to Taitokerau Forest Limited (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Impairment of loans to Taitokerau Forest Limited correctly recorded in the Financial Statements of the Government. Achieved Achieved Achieved

National Provident Fund - Crown liability for Scheme Deficiency PLA (M31)

Scope of Appropriation

This appropriation is limited to the Crown's liability for deficiency in the accounts of National Provident Fund schemes established pursuant to section 38A(6) of the National Provident Fund Act 1950, authorised by section 72 of the National Provident Fund Restructuring Act 1990.

Expenses

Expenses - National Provident Fund Crown liability for Scheme Deficiency PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 16 16

Reasons for Change in Appropriation

The Crown is liable for deficiencies in specified superannuation schemes of the National Provident Fund. The current forecast for the year is $16,000.

Expected Results

Expected Results - National Provident Fund Crown liability for Scheme Deficiency PLA (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
The Crown's liability for benefits payable to members of National Provident Fund schemes is correctly recorded in the Financial Statements of the Government. Unqualified audit opinion Unqualified audit opinion Unqualified audit opinion

National Provident Fund Schemes - Liability Under Crown Guarantee PLA (M31)

Scope of Appropriation

This appropriation is limited to the net increase (excluding actuarial gains and losses) in the Crown's liability for benefits payable to members of National Provident Fund schemes under the Crown guarantee in section 60 of the National Provident Fund Restructuring Act 1990. This appropriation is authorised by section 66 of the National Provident Fund Restructuring Act 1990.

Expenses

Expenses - National Provident Fund Schemes Liability Under Crown Guarantee PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 60,000 (1,300) 58,700

Reasons for Change in Appropriation

The decrease in the appropriation relates to the GST rate increase during the year which was separately appropriated in the 2010/11 Estimates but not deducted from the liability.

New Zealand House, London (M31)

Scope of Appropriation

This appropriation is limited to the operational costs of New Zealand House, London.

Expenses

Expenses - New Zealand House, London (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 16,200 (1,500) 14,700

Reasons for Change in Appropriation

The operational costs of New Zealand House have been revised down by $1.500 million primarily due to the fall in the exchange rate and occupancy rates during the year. Rental revenue has been revised down by the same amount, making this change fiscally neutral.

Expected Results

Expected Results - New Zealand House, London (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Net rental from commercial space is optimised. Achieved Achieved Achieved
New Zealand House is maintained to provide office accommodation of a suitable standard for New Zealand Government entities in London. Achieved Achieved Achieved

Payment in respect of Export Credit Office Guarantees and Indemnities PLA (M31)

Scope of Appropriation

This appropriation is limited to payments by the Crown under export credit guarantees or indemnities given under Section 65ZD of the Public Finance Act 1989, as authorised by section 65ZG of that Act.

Expenses

Expenses - Payment in respect of Export Credit Office Guarantees and Indemnities PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 186 186

Reasons for Change in Appropriation

This relates to two claims under the export credit guarantee paid out during the year.

Expected Results

Expected Results - Payment in respect of Export Credit Office Guarantees and Indemnities PLA (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Claims are reported and paid in a timely and accurate manner. N/A Achieved Achieved

Taitokerau Forests Limited Grant (M31)

Scope of Appropriation

This appropriation is limited to grants to Taitokerau Forests Limited for on-payment to forest owners, payable upon harvest of the forests.

Expenses

Expenses - Taitokerau Forests Limited Grant (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 200 269 469

Reasons for Change in Appropriation

Grants payable to Taitokerau Forest Limited for on-payment to forest owners, are payable upon harvest of the forests. Timing of the harvest is uncertain and hence an expense transfer from 2009/10 of $269,000 was approved into 2010/11 for services not completed.

Expected Results

Expected Results - Taitokerau Forests Limited Grant (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Grant payment is made in accordance with the Taitokerau Forests Limited agreement. Achieved Achieved Achieved

Reporting Mechanisms

Reporting Mechanisms - Reporting Mechanisms - Finance
Appropriation Reporting Mechanism
Additional Payments to Facilitate Full Payout under the Crown Retail Deposit Guarantee Scheme Financial Statements of the Government
Costs in respect of Guarantees and Indemnities PLA Financial Statements of the Government
Earthquake Commission Annual report of EQC
Earthquake Commission - Land Insurance Payments Annual report of EQC
Impairment of Crown's interest in AMI Financial Statements of the Government
National Provident Fund - Crown liability for Scheme Deficiency PLA Financial Statements of the Government
Payment in Respect of Export Credit Office Guarantees and Indemnities PLA Financial Statements of the Government

The above table indicates the mechanisms to be used for reporting actual performance for each non-departmental other expenses appropriation.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

The Treasury - Capital Expenditure PLA (M31)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Treasury, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - The Treasury Capital Expenditure PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 851 586 1,437
Intangibles 524 (504) 20
Other - - -

Total Appropriation

1,375 82 1,457

Reasons for Change in Appropriation

The increase in the departmental capital expenditure of $82,000 mainly relates to:

  • a delay in the redevelopment of the Treasury's human resource and financial systems with the financial system replacement now expected in 2011/12 and timing is still unconfirmed for the human resource system replacement, and
  • delay in the development of the NZDMO systems.

This is offset by expected improvements to the security systems and fitout alterations in Treasury to accommodate the scoping work on the mixed ownership model.

Expected Results

Part 6.2 - Non-Departmental Capital Expenditure

Intended Impacts, Outcomes and Objectives

Intended Impacts, Outcomes and Objectives - Part 6.2 NonDepartmental Capital Expenditure - Finance
Intended Impacts, Outcomes or Objectives of Appropriations Appropriations
Outcome: A high performing state sector that supports New Zealand's international competitiveness.
Impact: The Crown's balance sheet is managed efficiently and effectively.
AMI Equity Injection
  International Financial Institutions PLA
  Loan in Respect to Guarantees and Indemnities for the Crown Retail Deposit Guarantee Scheme

AMI Equity Injection (M31)

Scope of Appropriation

This appropriation is limited to the purchase of equity in AMI.

Capital Expenditure

Capital Expenditure - AMI Equity Injection (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 500,000 500,000

Reasons for Change in Appropriation

This is a new appropriation of $500 million for the purchase of equity in AMI.

Expected Results

Expected Results - AMI Equity Injection (M31) - Finance
  2010/11
  Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Crown's investment in AMI correctly recorded in the Financial Statements of the Government. N/A Achieved Achieved

Asian Development Bank PLA (M31)

Scope of Appropriation

This appropriation is limited to capital expenditure by New Zealand as a member of the Asian Development Bank Agreement, authorised by section 3 of the International Finance Agreements Amendment Act 1966.

Capital Expenditure

Capital Expenditure - Asian Development Bank PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 71,000 (5,875) 65,125

Reasons for Change in Appropriation

The 5th General Capital Increase has been made to the Asian Development Bank. The final payment was $65.125 million compared to the forecast of $71 million due to changes in exchange rates and a discount offered.

International Financial Institutions PLA (M31)

Scope of Appropriation

This appropriation is limited to capital expenditure for shares subscribed to by New Zealand as a member of International Financial Institutions, authorised by section 5 of the International Finance Agreements Act 1961.

Capital Expenditure

Capital Expenditure - International Financial Institutions PLA (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 148,000 148,000

Reasons for Change in Appropriation

This increase is to incorporate possible contributions to the International Monetary Fund (IMF) in 2010/11. Forecasts of contributions were unknown when the Estimates were prepared.

Expected Results

Landcorp Protected Land Agreement (M31)

Scope of Appropriation

Purchase (including by reinvesting cash dividends) of redeemable preference shares in Landcorp under the Protected Land Agreement.

Capital Expenditure

Capital Expenditure - Landcorp Protected Land Agreement (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 17,347 9,700 27,047

Reasons for Change in Appropriation

This increase is to provide for the additional capital incurred in maintaining the properties held under the Protected Land Agreement by Landcorp Farming Limited, for the net losses/(profits) of those properties and for interest charged while dividends were diverted to pay off the initial investment.

Loan in Respect to Guarantees and Indemnities for the Crown Retail Deposit Guarantee Scheme (M31)

Scope of Appropriation

This appropriation is limited to a loan in respect of guarantees and indemnities for the Crown Retail Deposit Guarantee Scheme in Vote Finance.

Capital Expenditure

Capital Expenditure - Loan in Respect to Guarantees and Indemnities for the Crown Retail Deposit Guarantee Scheme (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 175,000 175,000

Reasons for Change in Appropriation

This is a new appropriation for 2010/11 for a $175 million loan to the receivers of South Canterbury Finance to remove prior charge holders. The loan was subsequently repaid in full.

Taitokerau Forests (M31)

Scope of Appropriation

This appropriation is limited to the provision of loans to Taitokerau Forests Ltd for forest management and development.

Capital Expenditure

Capital Expenditure - Taitokerau Forests (M31) - Finance
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 800 700 1,500

Reasons for Change in Appropriation

The timing of drawdowns of Taitokerau Forests Limited loan facility is uncertain. In 2009/10, the actual drawdown of the loan was $700,000 less than that appropriated for that year resulting in a carry forward of this amount into 2010/11.

Reporting Mechanisms

Reporting Mechanisms - Reporting Mechanisms - Finance
Appropriation Reporting Mechanism
AMI Equity Injection Financial Statements of Government
International Financial Institutions PLA Financial Statements of Government
Loan in Respect to Guarantees and Indemnities for the Crown Retail Deposit Guarantee Scheme Financial Statements of Government

The above table indicates the mechanisms to be used for reporting actual results for each non-departmental capital expenditure appropriation.

Vote Fisheries

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Fisheries and Aquaculture (M32)

ADMINISTERING DEPARTMENT: Ministry of Fisheries

MINISTER RESPONSIBLE FOR MINISTRY OF FISHERIES: Minister of Fisheries and Aquaculture

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Fisheries
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Development of Fisheries Policy (M32)

This appropriation is limited to advice on the development of policies, standards and guidelines relating to the sustainable and efficient utilisation of New Zealand's fisheries, promotion of New Zealand's interests in an international context and provision of Ministerial servicing.
9,050 1,232 10,282

Implementation of New Zealand Fisheries Policies MCOA (M32)

94,372 (9,144) 85,228
Aquaculture
This output class is limited to implementing, supporting and monitoring the aquaculture strategy.
2,784 427 3,211
Fisheries enforcement and monitoring
This output class is limited to informing, assisting, directing and enforcing adherence to New Zealand fisheries laws.
33,392 (1,426) 31,966
Operational advice on sustainability and management controls in fisheries
This output class is limited to operational advice to the Minister on sustainability and management controls for New Zealand's fisheries.
58,196 (8,145) 50,051

Interim Secretariat South Pacific Regional Fisheries Management Organisation (M32)

This appropriation is limited to administrative support for the interim secretariat of the South Pacific Regional Fisheries Management Organisation.
272 175 447

Total Departmental Output Expenses

103,694 (7,737) 95,957

Non-Departmental Other Expenses

     

Contributions to International Organisations (M32)

Contributions to such organisations as the Commission for the Conservation of Southern Bluefin Tuna (CCSBT) and the Convention on the Conservation and Management of Highly Migratory Fish Stocks in the Western and Central Pacific.
375 25 400

Provision for Write Downs (M32)

Provision for non-departmental debt write-offs.
711 - 711

Quota Shares/ACE Administration Costs (M32)

Administration costs associated with the sale of Crown Quota Shares and ACE (Annual Catch Entitlement).
24 - 24

Settlements (M32)

This expenditure relates to the recognition of negotiated settlements.
- 11,473 11,473

Total Non-Departmental Other Expenses

1,110 11,498 12,608

Departmental Capital Expenditure

     

Ministry of Fisheries - Capital Expenditure PLA (M32)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Fisheries, as authorised by section 24(1) of the Public Finance Act 1989.
2,900 3,935 6,835

Total Departmental Capital Expenditure

2,900 3,935 6,835

Total Annual and Permanent Appropriations

107,704 7,696 115,400

Details of Projected Movements in Departmental
Net Assets

Ministry of Fisheries

Ministry of Fisheries - Details of Projected Movements in Departmental Net Assets - Fisheries
Details of Net Asset Schedule 2010/11
Main Estimates Projections
$000
2010/11
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2010/11
Opening Balance 13,335 13,275 Supplementary Estimates opening balance reflects the audited results as at 30 June 2010.
Capital Injections - 60 Capital contribution carried forward from 2009/10.
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

13,335 13,335  

Information Supporting the Supplementary Estimates Vote Fisheries

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Fisheries and Aquaculture (M32)

ADMINISTERING DEPARTMENT: Ministry of Fisheries

MINISTER RESPONSIBLE FOR MINISTRY OF FISHERIES: Minister of Fisheries and Aquaculture

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Fisheries
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 103,694 (7,737) - (7,737) 95,957
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 1,110 - 11,498 11,498 12,608
Capital Expenditure 2,900 3,935 - 3,935 6,835
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

107,704 (3,802) 11,498 7,696 115,400

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 37,151 N/A 3,756 3,756 40,907
Capital Receipts 100 N/A (100) (100) -

Total Crown Revenue and Capital Receipts

37,251 N/A 3,656 3,656 40,907

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Development of Fisheries Policy (M32)

Scope of Appropriation

This appropriation is limited to advice on the development of policies, standards and guidelines relating to the sustainable and efficient utilisation of New Zealand's fisheries, promotion of New Zealand's interests in an international context and provision of Ministerial servicing.

Expenses and Revenue

Expenses and Revenue - Development of Fisheries Policy (M32) - Fisheries
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 9,050 1,232 10,282
Revenue from Crown 8,966 1,232 10,198
Revenue from Other 84 - 84

Reasons for Change in Appropriation

The change reflects:

  • an increase for a carry forward of committed funding from 2009/10 to 2010/11 ($650,000)
  • an increase for a change in activity mix ($1.127 million)
  • a reduction for expenditure transferred from 2010/11 to 2011/12 ($240,000) and
  • a reduction for expenditure transferred from 2010/11 to 2011/12 and outyears to fund new / increased activities ($345,000).

Implementation of New Zealand Fisheries Policies MCOA (M32)

Scope of Appropriation

Aquaculture
This output class is limited to implementing, supporting and monitoring the aquaculture strategy.
Fisheries enforcement and monitoring
This output class is limited to informing, assisting, directing and enforcing adherence to New Zealand fisheries laws.
Operational advice on sustainability and management controls in fisheries
This output class is limited to operational advice to the Minister on sustainability and management controls for New Zealand's fisheries.

Explanation for Use of Multi-Class Output Expense Appropriation

These output classes contribute to the management of the sustainable use of New Zealand's Fisheries.

Expenses and Revenue

Expenses and Revenue - Implementation of New Zealand Fisheries Policies MCOA (M32) - Fisheries
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Total Appropriation

94,372 (9,144) 85,228
Aquaculture 2,784 427 3,211
Fisheries enforcement and monitoring 33,392 (1,426) 31,966
Operational advice on sustainability and management controls in fisheries 58,196 (8,145) 50,051

Revenue from Crown

91,667 (8,944) 82,723
Aquaculture 2,780 427 3,207
Fisheries enforcement and monitoring 32,915 (1,521) 31,394
Operational advice on sustainability and management controls in fisheries 55,972 (7,850) 48,122

Revenue from Other

2,705 (200) 2,505
Aquaculture 4 - 4
Fisheries enforcement and monitoring 477 95 572
Operational advice on sustainability and management controls in fisheries 2,224 (295) 1,929

Reasons for Change in Appropriation

Aquaculture

The change reflects:

  • an increase for a carry forward of committed funding from 2009/10 to 2010/11 ($1.080 million)
  • a reduction for expenditure transferred from 2010/11 to 2011/12 and outyears to fund new or increased activities ($71,000) and
  • a reduction for a change in activity mix ($582,000).

Fisheries enforcement and monitoring

The decrease predominantly reflects:

  • a transfer of expenditure from 2010/11 to 2011/12 and outyears to fund new or increased activities ($1.151 million); and
  • a reduction for a change in activity mix ($324,000).

Operational advice on sustainability and management controls in fisheries

The change reflects:

  • an increase for carry forward of committed funding from 2009/10 to 2010/11 ($4.600 million)
  • a reduction for the return of funding for observer and research costs ($5.110 million)
  • a reduction to reflect the transfer of funding from 2010/11 to 2011/12 ($5.984 million)
  • a reduction to reflect the transfer of expenditure from 2010/11 to 2011/12 and outyears to fund new or increased activities ($1.433 million) and
  • a reduction for a change in activity mix ($218,000).

Interim Secretariat South Pacific Regional Fisheries Management Organisation (M32)

Scope of Appropriation

This appropriation is limited to administrative support for the interim secretariat of the South Pacific Regional Fisheries Management Organisation.

Expenses and Revenue

Expenses and Revenue - Interim Secretariat South Pacific Regional Fisheries Management Organisation (M32) - Fisheries
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 272 175 447
Revenue from Crown 152 (3) 149
Revenue from Other 120 178 298

Reasons for Change in Appropriation

The increase reflects greater contributions from other member states.

Part 5 - Details and Expected Results for Other Expenses

Part 5.2 - Non-Departmental Other Expenses

Contributions to International Organisations (M32)

Scope of Appropriation

Contributions to such organisations as the Commission for the Conservation of Southern Bluefin Tuna (CCSBT) and the Convention on the Conservation and Management of Highly Migratory Fish Stocks in the Western and Central Pacific.

Reasons for Change in Appropriation

This appropriation increased by $25,000 to $400,000 for 2010/11 as a result of the contributions New Zealand is obliged to make as a signatory to international fisheries conventions.

Settlements (M32)

Scope of Appropriation

This expenditure relates to the recognition of negotiated settlements.

Expenses

Expenses - Settlements (M32) - Fisheries
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation - 11,473 11,473

Reasons for Change in Appropriation

The increase reflects an expense transfer from 2009/10 to 2010/11 to fund the ongoing obligation in relation to the Maori Aquaculture Settlement and a reforecast of the pre-commencement Maori Aquaculture Settlements.

Part 6 - Details and Expected Results for Capital Expenditure

Part 6.1 - Departmental Capital Expenditure

Ministry of Fisheries - Capital Expenditure PLA (M32)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Fisheries, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

Capital Expenditure - Ministry of Fisheries Capital Expenditure PLA (M32) - Fisheries
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 1,400 1,952 3,352
Intangibles 1,500 1,983 3,483
Other - - -

Total Appropriation

2,900 3,935 6,835

Reasons for Change in Appropriation

The annual approved baseline for the Ministry is $2.900 million. Changes to the appropriation are made in the Supplementary Estimates once the final outturn for the previous year is determined. The Supplementary Estimates figure reflects projects delayed from 2009/10 to 2010/11.

Vote Food Safety

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Food Safety (M33)

ADMINISTERING DEPARTMENT: Ministry of Agriculture and Forestry

MINISTER RESPONSIBLE FOR MINISTRY OF AGRICULTURE AND FORESTRY: Minister of Agriculture

Details of Appropriations

Details of Annual and Permanent Appropriations

Details of Annual and Permanent Appropriations - Food Safety
  2010/11
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Assurance (M33)

This appropriation is limited to justifying and delivering assurances to consumers, the public, overseas authorities and other stakeholders that food, food-related products and inputs into the production of food (whether undertaken or produced in New Zealand or imported) are managed, audited, approved, registered and/or monitored in accordance with New Zealand legislation and, for exports, relevant importing countries' market access requirements.
59,121 (1,099) 58,022

Information (M33)

This appropriation is limited to engagement of and information for stakeholders about food safety and suitability, to encourage participation in, and compliance with, the food regulatory programme, and to enable consumers to make appropriate food choices.
4,110 (126) 3,984

Policy Advice (M33)

This appropriation is limited to analysis, policy, strategic and legal advice and decision making support relating to domestic and international arrangements concerning food safety, food suitability, enforcement, inputs related to food production and ministerial services.
6,708 (72) 6,636

Response (M33)

This appropriation is limited to the investigation of, preparedness for, and response to, food related events, incidents, emergencies, complaints and suspected breaches of legislation and taking appropriate sanctions and enforcement action.
2,333 18 2,351

Standards (M33)

This appropriation is limited to the scientific inputs and development and implementation of food related standards (including as appropriate international and joint Australia/New Zealand standards) and standards related to inputs into food production, imports, exports, new and emerging issues and the domestic market.
23,841 (1,598) 22,243

Total Departmental Output Expenses

96,113 (2,877) 93,236

Non-Departmental Other Expenses

     

Joint Food Standards Setting Treaty (NDOC) (M33)

This appropriation is limited to the development of joint food standards, codes of practice, and guidance material for Australia and New Zealand by Food Standards Australia New Zealand in accordance with the Joint Food Standards Setting Treaty.
2,150 (164) 1,986

Total Non-Departmental Other Expenses

2,150 (164) 1,986

Total Annual and Permanent Appropriations

98,263 (3,041) 95,222

Information Supporting the Supplementary Estimates Vote Food Safety

MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister for Food Safety (M33)

ADMINISTERING DEPARTMENT: Ministry of Agriculture and Forestry

MINISTER RESPONSIBLE FOR MINISTRY OF AGRICULTURE AND FORESTRY: Minister of Agriculture

Part 1 - Summary of the Vote

Part 1.3 - Trends in the Vote

Summary of Financial Activity

Summary of Financial Activity - Food Safety
  2010/11
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 96,113 (2,877) - (2,877) 93,236
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 2,150 - (164) (164) 1,986
Capital Expenditure - - - - -
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -

Total Appropriations

98,263 (2,877) (164) (3,041) 95,222

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue - N/A - - -
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

- N/A - - -

Part 2 - Details and Expected Performance for Output Expenses

Part 2.1 - Departmental Output Expenses

Assurance (M33)

Scope of Appropriation

This appropriation is limited to justifying and delivering assurances to consumers, the public, overseas authorities and other stakeholders that food, food-related products and inputs into the production of food (whether undertaken or produced in New Zealand or imported) are managed, audited, approved, registered and/or monitored in accordance with New Zealand legislation and, for exports, relevant importing countries' market access requirements.

Expenses and Revenue

Expenses and Revenue - Assurance (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 59,121 (1,099) 58,022
Revenue from Crown 3,843 15 3,858
Revenue from Other 57,430 (5,332) 52,098

Reasons for Change in Appropriation

This appropriation will decrease by $1.099 million to $58.022 million in 2010/11. This is due to: a reallocation of revenue Crown funded resources between output expenses ($47,000); and reduced services to other public sector agencies ($1.114 million). These changes are offset by an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($62,000).

Memorandum Account

Memorandum Account - Assurance (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Verification of the Food Regulatory Programme

     
Opening Balance at 1 July (7,854) 215 (7,639)
Revenue 38,500 (240) 38,260
Expenses (35,100) (2,045) (37,145)
Transfers and Adjustments - - -
Closing Balance at 30 June (4,454) (2,070) (6,524)

Information (M33)

Scope of Appropriation

This appropriation is limited to engagement of and information for stakeholders about food safety and suitability, to encourage participation in, and compliance with, the food regulatory programme, and to enable consumers to make appropriate food choices.

Expenses and Revenue

Expenses and Revenue - Information (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 4,110 (126) 3,984
Revenue from Crown 3,427 (148) 3,279
Revenue from Other 690 15 705

Reasons for Change in Appropriation

This appropriation will decrease by $126,000 to $3.984 million in 2010/11. This is due to an expense transfer to 2011/12 for the Domestic Food Review due to delays in the passage of the Food Bill ($150,000). This change is offset by: increase in services to other public sector agencies ($15,000); increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($2,000); and increase in third party funded activity ($7,000).

Policy Advice (M33)

Scope of Appropriation

This appropriation is limited to analysis, policy, strategic and legal advice and decision making support relating to domestic and international arrangements concerning food safety, food suitability, enforcement, inputs related to food production and ministerial services.

Expenses and Revenue

Expenses and Revenue - Policy Advice (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 6,708 (72) 6,636
Revenue from Crown 6,687 (95) 6,592
Revenue from Other 115 (71) 44

Reasons for Change in Appropriation

This appropriation will decrease by $72,000 to $6.636 million in 2010/11. This is due an expense transfer to 2011/12 for the Domestic Food Review due to delays in the passage of the Food Bill ($100,000). This change is offset by: increase in services to other public sector agencies ($23,000); and increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($5,000).

Response (M33)

Scope of Appropriation

This appropriation is limited to the investigation of, preparedness for, and response to, food related events, incidents, emergencies, complaints and suspected breaches of legislation and taking appropriate sanctions and enforcement action.

Expenses and Revenue

Expenses and Revenue - Response (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 2,333 18 2,351
Revenue from Crown 2,302 20 2,322
Revenue from Other 31 (2) 29

Reasons for Change in Appropriation

This appropriation will increase by $18,000 to $2.351 million in 2010/11. This increase is due an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($20,000) offset by reduced services to other public sector agencies ($2,000).

Standards (M33)

Scope of Appropriation

This appropriation is limited to the scientific inputs and development and implementation of food related standards (including as appropriate international and joint Australia/New Zealand standards) and standards related to inputs into food production, imports, exports, new and emerging issues and the domestic market.

Expenses and Revenue

Expenses and Revenue - Standards (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 23,841 (1,598) 22,243
Revenue from Crown 16,358 (65) 16,293
Revenue from Other 8,356 (2,439) 5,917

Reasons for Change in Appropriation

This appropriation will decrease by $1.598 million to $22.243 million in 2010/11. This is due to: an expense transfer to 2011/12 for negotiation of free trade or closer economic partnership agreements (FTA/CEP negotiations) ($600,000); an expense transfer to 2012/13 for FTA/CEP negotiations ($600,000); reduced services to other public sector agencies ($1.623 million); and an expense transfer to 2011/12 for the Domestic Food Review due to delays in the passage of the Food Bill ($500,000). These changes are offset by: an expense transfer from 2009/10 to meet cost of amalgamation of New Zealand Food Safety Authority ($500,000); an expense transfer from 2009/10 for the Domestic Food Review ($300,000); funding from Vote Foreign Affairs for FTA/CEP negotiations ($44,000); a reallocation of revenue Crown funded resources between output expenses ($47,000); an expense transfer from 2009/10 for FTA/CEP negotiations ($700,000); an increase in Government Superannuation Fund employer contributions from 6% to 10.7% funded from revenue Crown ($44,000); and an expense transfer from 2009/10 for New Zealand Food Safety Conference ($90,000).

Memorandum Account

Memorandum Account - Standards (M33) - Food Safety
  2010/11
  Estimates
$000
Supplementary
Estimates
$000
Total
$000

Approvals, Accreditations and Registrations

     
Opening Balance at 1 July 604 398 1,002
Revenue 3,500 (280) 3,220
Expenses (3,700) 150 (3,550)
Transfers and Adjustments - - -
Closing Balance at 30 June 404 268 672

Standards Setting for the Food Industry

     
Opening Balance at 1 July 3,153 (11) 3,142
Revenue 16,115 (777) 15,338
Expenses (17,262) 332 (16,930)