174 results found
  • Facilities Infrastructure Remediation Programme - Stage 1

    Infrastructure Project

    This project requires remediation of urgent infrastructure at Auckland City Hospital and Greenlane Clinical Centre to address high risk of service failure (as evidenced by detailed infrastructure assessments undertaken).

  • Building for the Future - Integrated Stroke Unit

    Infrastructure Project

    This project is a refurbishment of administration space into clinical space for an Integrated Stroke Unit. It includes an expansion of beds on Level 5 at Auckland City Hospital.

  • Mental Health Services Relocation

    Infrastructure Project

    This project requires investment in new facilities to enable the relocation of the following mental health services from the Princess Margaret Hospital campus: Mothers and babies and eating disorder regional inpatient and outpatient services, Child...

  • Individualised Service Units for High Risk Mental Health and Intellectual Disability Clients

    Infrastructure Project

    This project will deliver a facility for new service for clients with severe mental health intellectual disability diagnoses.

  • Manukau Infrastructure for New Capacity

    Infrastructure Project

    This project will deliver critical infrastructure needed to support relocation and expansion of clinical services planned in short/medium term on Manukau site. This will include new plant room/substations, heating ventilation and air conditioning,...

  • Manukau Radiology Hub - Stage 1

    Infrastructure Project

    This project will establish a radiology hub at Manukau site to improve service delivery and efficiency (currently the absence of CT and MRI services requires patients to be trasnferred to Middlemore or an additional diagnostic visit). Radiology access...

  • Reclad Programme - Stage 1

    Infrastructure Project

    This project will re-clad three clinical buildings: Kidz First and McIndoe ambulanace bay, Manukau Elective Surgery Hospital, Middlemore Hospital McIndoe Building. These will be reclad sequentially due to high clinical occupancy and lack of decanting...

  • Radiology Relocation to Harley Gray

    Infrastructure Project

    This project will relocate existing radiology department from earthquake prone Galbraith building (20 at IL4) to Harley Gray building, which was designed to accommodate the clinical areas for Radiology.

  • Critical Works - Stage 1 (Capacity)

    Infrastructure Project

    This project will deliver interim capacity for theatres and endoscopy, ahead of major redevelopment at Whangarei Hospital. It will also introduce a new service by building an interim Cardiac Cathetor Laboratory at Whangarei Hospital, ahead of major...

  • Bay of Islands Hospital - Stage 2 (Primary Care)

    Infrastructure Project

    Phase two of the rebuild of Bay of Islands Hospital, will incorporate a primary care clinic, outpatient space and shared reception. Was originally to have been undertaken by a Trust, but was not progressed at Trust was unable to get finance.

  • Dunedin Hospital Site Clearance

    Infrastructure Project

    Demolition and early works of New Dunedin Hospital Campus.

  • New Dunedin Hospital - ASC Stage 1 & 2

    Infrastructure Project

    This project requires that a New Dunedin Hospital campus is built across the ex Cadbury and Wilson blocks in central Dunedin to replace hospital services currently provided in the Clinical Services Block, Ward Block (acute clinical services, birthing,...

  • New Dunedin Hospital Campus

    Infrastructure Project

    This project requires that a New Dunedin Hospital campus is built across the ex Cadbury and Wilson blocks in central Dunedin to replace hospital services currently provided in the Clinical Services Block, Ward Block (acute clinical services, birthing,...

  • Elective Capacity and Inpatient Beds and Supporting Infrastructure

    Infrastructure Project

    This project will deliver additional capacity in elective theatres, inpatient beds, and endoscopy suite and centralised sterile services department for Waitemata District Health Board to meet immediate and short term future capacity requirements. The...

  • Taxiway Alpha Extension

    Infrastructure Project

    Taxi-way Alpha requires to be extended to provide for an improvement in the safe manoeuvre of aircraft. The scope of this extension has yet to be determined.

  • Air Movements Unit Hangar and Equipment Storage

    Infrastructure Project

    There is a requirement to enhance the ability to effectively and safely store, manage and re-pack items pre- and post- flights. Currently undertaken in or around the air-movements area, enhancements would include a covered, environmentally controlled and...

  • Arch Hangar Mid-life Light Refit

    Infrastructure Project

    The Arch-Hangars used by Airforce in Whenuapai were built during the early 1940's. Whilst structurally sound, they require a refit of the associated hangar components - fire-suppression, fume extraction, lighting, environmental conditions, heating and...

  • Arch Hangar Mid-life Intensive Refit

    Infrastructure Project

    The Arch-Hangars used by Airforce in Whenuapai were built during the early 1940's. Whilst structurally sound, they require a refit of the associated hangar components. While this will include - fire-suppression, fume extraction, lighting, environmental...

  • Runway End Safety Area (03-21)

    Infrastructure Project

    This project will satisfy requirements to upgrade and improve the runway safety area to cater for existing and future aircraft. The exact scope of this work has yet to be defined.

  • Future Air Mobility Fixed Wing Simulator Utilities Enablement

    Infrastructure Project

    The Future Air Mobility Capability Simulator Building will be sited on an agreed and pre-determined location. Underground facilities will need to be brought into this site to support that facility. It is likely that a general upgrade of connected...

  • Explosive Processing Facility

    Infrastructure Project

    This project will deliver improvements to the explosive processing facility to ensure compliance with the New Zealand Defence Force Hazardous Substance Safety Requirements. Improvements to this facility must ensure regulatory compliance while considering...

  • Future Air Mobility Fixed Wing Simulator Facility

    Infrastructure Project

    This project seeks to deliver a fixed-wing full motion simulator facility and associated services. This will enable the training and preparation for the Future Air Mobility Capability airframe, scheduled to be based at Whenuapai. This project should be...

  • Linked Capability Base Infrastructure Support Requirements

    Infrastructure Project

    This project is a 'catch-all' for the general upgrade of underground services across major areas of Whenuapai and will be prioritised IAW established understanding of the relative priority for: type, nature, condition and requirement of the UG service,...

  • Linked Capability of Airfield Infrastructure

    Infrastructure Project

    This project is a 'catch-all' for the general upgrade of 'airfield infrastructure' as is required to meet capability requirements, for Whenuapai and will be prioritised IAW established understanding of capability requirements.

  • Linked Capability Introduction to Service - Wharf Strengthening

    Infrastructure Project

    This project entry remains as a placeholder awaiting confirmation of requirement from the Defence Capability project lead. The scope and detailed requirements of the project will be determined by a subsequent report and requirements of the future...

  • Existing Wharf Strengthening - Future Maritime Fleet

    Infrastructure Project

    This project entry remains as a placeholder awaiting confirmation of requirement from the Defence Capability project lead. The scope and detailed requirements of the project will be determined by a subsequent report and requirements of the future...

  • Wharf Loading Area and Support Facility - Future Maritime Fleet

    Infrastructure Project

    This project requires delivery of a larger mobility area. Within the Naval Base at the dockside/wharfside interface, a requirement exists to improve the loading and storage of material, and provide a larger vehicle mobility area. It is envisaged that an...

  • Small Boats Storage and Wash Down Area

    Infrastructure Project

    This project will provide a fit for purpose storage and wash down facility, replacing the current (outdoor) small boat storage area. The aim of this is to provide a facility which will protect the small boats from sea spray, sun, wind and rain but enable...

  • Small Boats Maintenance Workshop

    Infrastructure Project

    This project seeks to provide a safe working environment for maintenance activities related to the small boat fleet. Physical security i.e. lockable areas and oversight/monitoring, will likely be a requirement.

  • Small Boats Fuel Services

    Infrastructure Project

    This project seeks to provide safe fuelling options for the small boat fleet. This will include the controls, monitoring and environmental protection measures required to support safe fuelling suitable for the current and future small-boat fleets.

  • Waterside Operations and Offices

    Infrastructure Project

    This project will deliver a multi-use, combined-use, office, planning, conference and training building, for the management of all ship related dock-side operations: maintenance and management, and all ship related water-side operations: supply,...

  • Transitionary Multi-Purpose Office Accommodation

    Infrastructure Project

    This project requires the delivery of a transitional suite of general office-like areas. The Naval Base is constrained geographically and will require a transitional suite of general office-like areas that cater for dislocated functions and personnel...

  • Base Headquarters Building

    Infrastructure Project

    This project requires the delivery of a base headquarters building. There are a number of command elements within the Naval Base. For efficiency and effectiveness outcomes, a requirement exists to collate these elements, and their staff. It is envisaged...

  • Linked Capability Wharf Extension

    Infrastructure Project

    This project entry remains as a placeholder awaiting confirmation of requirement from the Defence Capability project lead. The scope and detailed requirements of the project will be determined by a subsequent report and requirements of the future...

  • Ocean Patrol Vessel Wharf Transformer

    Infrastructure Project

    This project will deliver increases capacity of the wharf transformer. Due to the increased demand from the introduction of new vessels, there is a requirement to increase the capacity of the transformer supporting the wharf area.

  • Combined Explosive Hazards Security and Noise Buffer

    Infrastructure Project

    This project is a placeholder to support the requirements of the Combined Explosive Hazards programme for working dogs at either Papakura, Ardmore or Linton. The scope and detailed requirements seek the support of additional dogs and general improvements...