46 results found
  • Facilities Infrastructure Remediation Programme - Stage 1

    Infrastructure Project

    This project requires remediation of urgent infrastructure at Auckland City Hospital and Greenlane Clinical Centre to address high risk of service failure (as evidenced by detailed infrastructure assessments undertaken).

  • Building for the Future - Integrated Stroke Unit

    Infrastructure Project

    This project is a refurbishment of administration space into clinical space for an Integrated Stroke Unit. It includes an expansion of beds on Level 5 at Auckland City Hospital.

  • Reclad Programme - Stage 1

    Infrastructure Project

    This project will re-clad three clinical buildings: Kidz First and McIndoe ambulanace bay, Manukau Elective Surgery Hospital, Middlemore Hospital McIndoe Building. These will be reclad sequentially due to high clinical occupancy and lack of decanting...

  • Arch Hangar Mid-life Light Refit

    Infrastructure Project

    The Arch-Hangars used by Airforce in Whenuapai were built during the early 1940's. Whilst structurally sound, they require a refit of the associated hangar components - fire-suppression, fume extraction, lighting, environmental conditions, heating and...

  • Arch Hangar Mid-life Intensive Refit

    Infrastructure Project

    The Arch-Hangars used by Airforce in Whenuapai were built during the early 1940's. Whilst structurally sound, they require a refit of the associated hangar components. While this will include - fire-suppression, fume extraction, lighting, environmental...

  • Linked Capability Base Infrastructure Support Requirements

    Infrastructure Project

    This project is a 'catch-all' for the general upgrade of underground services across major areas of Whenuapai and will be prioritised IAW established understanding of the relative priority for: type, nature, condition and requirement of the UG service,...

  • Small Boats Storage and Wash Down Area

    Infrastructure Project

    This project will provide a fit for purpose storage and wash down facility, replacing the current (outdoor) small boat storage area. The aim of this is to provide a facility which will protect the small boats from sea spray, sun, wind and rain but enable...

  • Base Headquarters Building

    Infrastructure Project

    This project requires the delivery of a base headquarters building. There are a number of command elements within the Naval Base. For efficiency and effectiveness outcomes, a requirement exists to collate these elements, and their staff. It is envisaged...

  • Linked Capability Wharf Extension

    Infrastructure Project

    This project entry remains as a placeholder awaiting confirmation of requirement from the Defence Capability project lead. The scope and detailed requirements of the project will be determined by a subsequent report and requirements of the future...

  • Operations Vehicle Introduction to Service - Maintenance Bays Including Aprons

    Infrastructure Project

    This project delivers enhancements to supporting infrastructure at Papakura Camp.

  • Air Surveillance Complimentary Capability Operations Centre

    Infrastructure Project

    This project is a placeholder to support the introduction into service of the Air Surveillance Complimentary Capability fleet. The scope and scale of this project is as yet unknown and may involve a new, or may re-use and improve an existing, facility.

  • Air Surveillance Complimentary Capability Hangar and Apron

    Infrastructure Project

    This project is a placeholder to support the introduction into service of the Air Surveillance Complimentary Capability fleet. The scope and scale of this project is as yet unknown but is likely to re-use and improve an existing hangar and improve the...

  • Protected Mobility Vehicle Introduction to Service - Priority Roads and Heavy Goods Entrance

    Infrastructure Project

    This project is a placeholder to support the introduction into service of the future Protected Mobility Vehicle fleet. The scope and scale of this project is as yet unknown as it is dependent on the selected platform (yet to be decided). NZDF must ensure...

  • Protected Mobility Vehicle Introduction to Service - Priority Hardstanding

    Infrastructure Project

    This project is a placeholder to support the introduction into service of the Protected Mobility Fleet. As the project is dependent on the selected platform(s), the scale and requirements of this upgrade are currently unknown. The New Zealand Defence...

  • Consolidated Parking - Common Logistics Precinct

    Infrastructure Project

    This project requires the development of centralised parking at Linton Camp. Responding to the emerging New Zealand Defence Force parking strategy and the requirement to centralise and consolidate assets, the Linton Infrastructure Master Plan indicated...

  • Camp Armoury

    Infrastructure Project

    This project will extend the existing armoury to meet current and future capacity requirements. The existing armoury does not meet current, nor future expected capacity requirements and requires upgrades in order to store contemporary weaponry. This...

  • Network Enabled Army Supporting Infrastructure - Stage 3

    Infrastructure Project

    This project is a placeholder to support Stage 3 of the roll-out of the Network Enabled Army. The project has been identified and timed to support the improvement of electrical infrastructure necessary to support the project build phase. The scope and...

  • Investment in Horizontal Infrastructure

    Infrastructure Project

    This project requires the relocation, extension and removal of redundant infrastructure. Defence has a requirement to generally improve the condition, capacity and resilience of its UG infrastructure. With the intended development of the Defence estate,...

  • Dominion Road School

    Infrastructure Project

    New build.

  • Greenmeadows School

    Infrastructure Project

    New build.

  • Laingholm School

    Infrastructure Project

    New build.

  • Lawrence Area School

    Infrastructure Project

    Refurbishment.

  • Maraetai Beach School

    Infrastructure Project

    New build.

  • Omokoroa Point School

    Infrastructure Project

    New build.

  • Owairaka District School

    Infrastructure Project

    New build.

  • Owairoa Primary School

    Infrastructure Project

    Refurbishment.

  • Richmond Road Shchool

    Infrastructure Project

    Refurbishment.

  • Te Wharekura O Manurewa

    Infrastructure Project

    New build.

  • TKKM O Te kotuku

    Infrastructure Project

    Refurbishment.

  • Waimea College

    Infrastructure Project

    New build.

  • Wainui School

    Infrastructure Project

    New build.

  • SH5: Wairakei to Mihi to SH38 - Stage 2

    Infrastructure Project

    Safety improvements to respond to the National Safety Roads and Roadsides Programme (NSRRP) Business Case. The business case recommends safety treatments target three high risk areas to achieve consistent wide shoulders and a safe and appropriate speed...

  • SH50: Hawke's Bay Expressway

    Infrastructure Project

    This project seeks to deliver Safer Corridor treatments such as median and side barrier, roundabouts and/or grade separation to within Safe System (Harm minimisation) limits.

  • SH35 Makoomuka Realignment

    Infrastructure Project

    Responding to the ongoing maintenance, resilience and inefficiencies associated with two single lane bridges and one dual lane bridge.

  • HPMV T2 West Coast connections (Contract 2)

    Infrastructure Project

    Strengthening of bridges and structures between Hokitika and Waipara and connecting corridors of SH6/7/69/65/part67 to increase loading for HPMV and two bridges on SH73/67 for 50Max.

  • W2HV Link Programme: N2P section

    Infrastructure Project

    The Project seeks to provide transport infrastructure that will improve safety and connectivity for walking and cycling between Wellington and Hutt Valley. It aims to provide dedicated walking and cycling facilities. This is the Ngauranga to Petone...